Scheduled Deliverables
as of 2023-07-26
There are currently 56 scheduled deliverables being worked on by 33 teams
5 deliverables are scheduled to begin work by 4 team(s) within two weeks
This report lists the actively assigned deliverables and the associated teams, along with the number of developers assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.
The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.
The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.
extra analysis (click me)
There are approximately 247 devs (out of ~512, or 48%) with 505 assignments scheduled to work on 56 observable deliverables. Of those deliverables, 11% are for SQ42 exclusively, with ~65 devs (13%) scheduled for approximately 2912 man-days. 23% of deliverables are shared between both projects.
8 deliverable(s) are not currently scheduled to continue work after this sprint:
- Argo SRV
- Chapter 07
- Chapter 12
- Map and Radar System Rework
- MFD Rework
- mobiGlas Rework
- Reputation - Sandbox Triggers
- Tumbril Storm
- Arena Commander Feature Team
full-time with 48 task(s) scheduled, all of which are for SC - Audio
100% part-time with 34 task(s) scheduled, all of which are for SQ42 - Editor Team
full-time with 38 task(s) scheduled, 50% of which are for SQ42 - Engine Team
full-time with 11 task(s) scheduled, 33% of which are for SQ42 - EU Landing Zone 1
full-time with 26 task(s) scheduled, all of which are for SC - EU Landing Zone 2
full-time with 55 task(s) scheduled, all of which are for SC - EU PU Gameplay Feature Team
36% part-time with 45 task(s) scheduled, all of which are for SC - EU Sandbox 1
69% part-time with 29 task(s) scheduled, all of which are for SC - Facial Animation
full-time with 12 task(s) scheduled, all of which are for SQ42 - Game Services Team
28% part-time with 43 task(s) scheduled, all of which are for SC - Graphics Team
full-time with 16 task(s) scheduled, 50% of which are for SQ42 - Live Tools Team
full-time with 37 task(s) scheduled, 33% of which are for SQ42 - Location Concept Art
full-time with 10 task(s) scheduled, all of which are for SC - Mission Feature Team
full-time with 48 task(s) scheduled, all of which are for SC - Motion Capture Team
9% part-time with 33 task(s) scheduled, all of which are for SQ42 - MTL Sandbox 1
8% part-time with 164 task(s) scheduled, all of which are for SC - Narrative
full-time with 15 task(s) scheduled, 33% of which are for SQ42 - Network Team
full-time with 9 task(s) scheduled, all of which are for SC - Persistent Tech Team
full-time with 8 task(s) scheduled, all of which are for SC - Physics Team
full-time with 7 task(s) scheduled, 50% of which are for SQ42 - Planet Tech Team
full-time with 7 task(s) scheduled, all of which are for SC - Systemic Services and Tools Team
full-time with 30 task(s) scheduled, all of which are for SC - Tech Animation Team
21% part-time with 24 task(s) scheduled, all of which are for SQ42 - Tools Team
full-time with 19 task(s) scheduled, 50% of which are for SQ42 - UI Tech Team
full-time with 7 task(s) scheduled, 50% of which are for SQ42 - US PU Gameplay Feature Team
full-time with 37 task(s) scheduled, 17% of which are for SQ42 - Vehicle Content - EU
full-time with 63 task(s) scheduled, 60% of which are for SQ42 - Vehicle Content - MTL
24% part-time with 34 task(s) scheduled, all of which are for SC - Vehicle Content - US
14% part-time with 28 task(s) scheduled, all of which are for SC - Vehicle Feature Team
full-time with 29 task(s) scheduled, 60% of which are for SQ42 - VFX Team
full-time with 24 task(s) scheduled, 50% of which are for SQ42
Additional Derelict Settlements
- EU Sandbox 1
3x Art devs working on 9 tasks (61% load) thru 2023-08-13
3x Art devs working on 9 tasks (61% load) thru 2023-08-13
................................................~~~~======|======...=====================...========....
- MTL Sandbox 1
2x Design devs working on 27 tasks (63% load) thru 2023-12-14
3x Art devs working on 29 tasks (44% load) thru 2023-12-14
2x Design devs working on 27 tasks (63% load) thru 2023-12-14
3x Art devs working on 29 tasks (44% load) thru 2023-12-14
==============================.===============~~~~~~======|=========================================....
==============================.===============~~~~~~======|=========================================....
Aopoa San'tok.yāi
- Vehicle Content - US
4x Art devs working on 4 tasks (27% load) thru 2023-09-11
1x Design dev working on 5 tasks (121% load) thru 2023-09-11
4x Art devs working on 4 tasks (27% load) thru 2023-09-11
1x Design dev working on 5 tasks (121% load) thru 2023-09-11
======================....========================......==|=========~~~~~.......====================....
======================....========================..======|==============...............................
..........................................................|.................................========....
AR and Map Marker System Rework
- UI Tech Team
3x Engineering devs working on 3 tasks (44% load) thru 2023-08-10
3x Engineering devs working on 3 tasks (44% load) thru 2023-08-10
=============...........=============...............======|=====........................................
Arena Commander: Experimental Game Modes
- Arena Commander Feature Team
1x Engineering dev working on 12 tasks (114% load) thru 2023-09-20
1x Engineering dev working on 12 tasks (114% load) thru 2023-09-20
======================..==================================|=================............................
Arena Commander: Frontend Update
- Arena Commander Feature Team
1x Engineering dev working on 12 tasks (114% load) thru 2023-09-20
1x Design dev working on 12 tasks (114% load) thru 2023-09-20
1x Engineering dev working on 12 tasks (114% load) thru 2023-09-20
1x Design dev working on 12 tasks (114% load) thru 2023-09-20
........................==================================|=================............................
........................==================================|=================............................
Arena Commander: New Racetracks
- Arena Commander Feature Team
1x Design dev working on 12 tasks (114% load) thru 2023-09-20
1x Design dev working on 12 tasks (114% load) thru 2023-09-20
........................==================================|=================............................
Argo SRV
(Scheduled work ending soon!)
- VFX Team
1x Art dev working on 2 tasks (128% load) thru 2023-07-26
1x Art dev working on 2 tasks (128% load) thru 2023-07-26
..................................................========|=............................................
Artificial Gravity
- EU PU Gameplay Feature Team
1x Engineering dev working on 4 tasks (81% load) thru 2023-08-14
1x Engineering dev working on 4 tasks (81% load) thru 2023-08-14
....................................................~~~~~~|~~~~~~.........~~~~~~~~~~~...................
ATC Service
- Systemic Services and Tools Team
2x Engineering devs working on 4 tasks (83% load) thru 2023-08-09
2x Engineering devs working on 4 tasks (83% load) thru 2023-08-09
........................=============.............========|=====..........===========...................
Bounty Hunter V2
- EU Landing Zone 2
3x Art devs working on 29 tasks (47% load) thru 2023-12-14
3x Art devs working on 29 tasks (47% load) thru 2023-12-14
==========================================================|=========================================....
- Mission Feature Team
6x Design devs working on 6 tasks (18% load) thru 2023-08-23
6x Design devs working on 6 tasks (18% load) thru 2023-08-23
....=================...................==================|=========......===============...............
....=================...============================......|...............===============...............
- US PU Gameplay Feature Team
2x Art devs will work on 2 tasks (128% load) starting 2023-08-01 thru 2023-08-14
2x Art devs will work on 2 tasks (128% load) starting 2023-08-01 thru 2023-08-14
========............................~~~~..................|.=====...............=====...................
Bug Fixing & Tech Debt
- Editor Team
5x Engineering devs working on 3 tasks (26% load) thru 2023-08-10
5x Engineering devs working on 3 tasks (26% load) thru 2023-08-10
=============...........=============...............======|=====........................................
- Live Tools Team
7x Engineering devs working on 18 tasks (16% load) thru 2023-09-28
7x Engineering devs working on 18 tasks (16% load) thru 2023-09-28
==========================================================|===================..........................
- US PU Gameplay Feature Team
7x Design devs working on 13 tasks (19% load) thru 2023-12-14
7x Design devs working on 13 tasks (19% load) thru 2023-12-14
========================....========~~~~=========...======|=========================================....
....................====............~~~~~~~~~~~~~.........|.....============........================....
Building Interiors
- MTL Sandbox 1
13x Art devs working on 27 tasks (13% load) thru 2023-12-14
5x Design devs working on 25 tasks (23% load) thru 2023-12-14
13x Art devs working on 27 tasks (13% load) thru 2023-12-14
5x Design devs working on 25 tasks (23% load) thru 2023-12-14
........................======.===============~~~~~~======|=========================================....
==============================.===============~~~~~~======|=========================================....
Chapter 07
(Scheduled work ending soon!)
- VFX Team
1x Art dev working on 1 task (128% load) thru 2023-07-26
1x Art dev working on 1 task (128% load) thru 2023-07-26
............................======....................====|=............................................
Chapter 12
(Scheduled work ending soon!)
- VFX Team
1x Art dev working on 2 tasks (128% load) thru 2023-07-26
1x Art dev working on 2 tasks (128% load) thru 2023-07-26
........................==========................========|=............................................
Chapter 21
- Vehicle Feature Team
1x Engineering dev working on 8 tasks (325% load) thru 2023-08-14
1x Engineering dev working on 8 tasks (325% load) thru 2023-08-14
........................................=========...======|======.......................................
Chapter 26
- Narrative
2x Design devs working on 3 tasks (66% load) thru 2023-08-10
2x Design devs working on 3 tasks (66% load) thru 2023-08-10
..............................................~~~~..======|=====........................................
Character Work
- Audio
11x Audio devs working on 17 tasks (8% load) thru 2023-09-27
11x Audio devs working on 17 tasks (8% load) thru 2023-09-27
............................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~~~..........................
- Facial Animation
9x Animation devs working on 12 tasks (26% load) thru 2023-09-28
9x Animation devs working on 12 tasks (26% load) thru 2023-09-28
====================~~~~~~~~====================....======|===================..........................
- Motion Capture Team
9x Animation devs working on 33 tasks (14% load) thru 2023-09-28
9x Animation devs working on 33 tasks (14% load) thru 2023-09-28
============================================~~~~~~~~~~====|===================..........................
- Tech Animation Team
12x Tech Content devs working on 24 tasks (12% load) thru 2023-09-20
12x Tech Content devs working on 24 tasks (12% load) thru 2023-09-20
============================================~~~~~~~~~~====|=================............................
Entity Properties Plugin
- Editor Team
1x Engineering dev working on 5 tasks (104% load) thru 2023-07-27
1x Engineering dev working on 5 tasks (104% load) thru 2023-07-27
=========...=====================...======================|=..================..........................
Fire Hazard
- VFX Team
3x Engineering devs working on 4 tasks (41% load) thru 2023-08-23
3x Art devs working on 4 tasks (41% load) thru 2023-08-23
3x Engineering devs working on 4 tasks (41% load) thru 2023-08-23
3x Art devs working on 4 tasks (41% load) thru 2023-08-23
==================......==================........========|=========....................................
=========.................................................|.............................................
..................................................========|=========....................................
Freight Elevators
- EU Landing Zone 2
1x Art dev working on 14 tasks (131% load) thru 2023-12-14
1x Art dev working on 14 tasks (131% load) thru 2023-12-14
............=============.......................==========|=========================================....
- US PU Gameplay Feature Team
1x Art dev working on 3 tasks (185% load) thru 2023-07-31
3x Engineering devs working on 10 tasks (81% load) thru 2023-09-11
1x Art dev working on 3 tasks (185% load) thru 2023-07-31
3x Engineering devs working on 10 tasks (81% load) thru 2023-09-11
........============........========................======|==.............=======.......................
====================........========~~~~=====.......======|==============.===================...........
............................====..........................|.............................................
Gen12 - Renderer T1
- Engine Team
4x Engineering devs working on 7 tasks (56% load) thru 2023-08-24
4x Engineering devs working on 7 tasks (56% load) thru 2023-08-24
=================.......~~~~============............======|=========....................................
- Graphics Team
4x Tech Content devs working on 3 tasks (26% load) thru 2023-08-14
12x Engineering devs working on 13 tasks (38% load) thru 2023-08-14
4x Tech Content devs working on 3 tasks (26% load) thru 2023-08-14
12x Engineering devs working on 13 tasks (38% load) thru 2023-08-14
..................................................========|======.......................................
===================.....==============.======.....========|======.......................................
HEX
- Live Tools Team
5x Engineering devs working on 19 tasks (23% load) thru 2023-09-28
5x Engineering devs working on 19 tasks (23% load) thru 2023-09-28
==========================================================|===================..........................
Life Support T0
- EU PU Gameplay Feature Team
1x Engineering dev working on 4 tasks (81% load) thru 2023-08-14
1x Engineering dev working on 4 tasks (81% load) thru 2023-08-14
....................................................~~~~~~|~~~~~~.........~~~~~~~~~~~...................
Map and Radar System Rework
(Scheduled work ending soon!)
- UI Tech Team
2x Engineering devs working on 2 tasks (69% load) thru 2023-07-27
2x Engineering devs working on 2 tasks (69% load) thru 2023-07-27
=========...............=========...................======|=............................................
MFD Rework
(Scheduled work ending soon!)
- Vehicle Feature Team
8x Engineering devs working on 7 tasks (54% load) thru 2023-07-31
8x Engineering devs working on 7 tasks (54% load) thru 2023-07-31
======================..=================...=====...======|==...........................................
~~~~~~~~~~~~~~~~~~~~~~....................................|.............................................
Miscellaneous Support
- Editor Team
4x Engineering devs working on 6 tasks (31% load) thru 2023-07-27
1x Design dev working on 24 tasks (113% load) thru 2023-09-28
4x Engineering devs working on 6 tasks (31% load) thru 2023-07-27
1x Design dev working on 24 tasks (113% load) thru 2023-09-28
=========...=====================...======================|=..================..........................
==========================================================|===================..........................
Mission Manager App
- Mission Feature Team
1x Engineering dev working on 10 tasks (113% load) thru 2023-08-23
1x Engineering dev working on 10 tasks (113% load) thru 2023-08-23
........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~......|.............................................
........................==================================|=========....................................
- US PU Gameplay Feature Team
2x Art devs working on 4 tasks (81% load) thru 2023-08-14
2x Art devs working on 4 tasks (81% load) thru 2023-08-14
............................~~~~~~~~~~~~............======|======.........===========...................
mobiGlas Rework
(Scheduled work ending soon!)
- UI Tech Team
1x Engineering dev working on 2 tasks (139% load) thru 2023-07-27
1x Engineering dev working on 2 tasks (139% load) thru 2023-07-27
=========...............=========...................======|=............................................
New Missions - Cargo Hauling
- Mission Feature Team
2x Design devs working on 4 tasks (62% load) thru 2023-08-23
2x Design devs working on 4 tasks (62% load) thru 2023-08-23
..................................................========|=========......===============...............
New Missions - Data Heist
- Mission Feature Team
2x Design devs working on 5 tasks (53% load) thru 2023-08-23
2x Design devs working on 5 tasks (53% load) thru 2023-08-23
........................=================...==============|=========......===============...............
New Missions - Restoration Contracts
- Mission Feature Team
2x Design devs working on 4 tasks (62% load) thru 2023-08-23
2x Design devs working on 4 tasks (62% load) thru 2023-08-23
..................................................========|=========......===============...............
New Missions - Steal/Recover Cargo
- Mission Feature Team
1x Design dev working on 4 tasks (123% load) thru 2023-08-23
1x Design dev working on 4 tasks (123% load) thru 2023-08-23
..........................................................|...............===============...............
..................................................========|=========....................................
New Player Experience
- EU Landing Zone 2
1x Art dev working on 12 tasks (112% load) thru 2023-12-14
1x Art dev working on 12 tasks (112% load) thru 2023-12-14
=====...........................................==========|=========================================....
- Mission Feature Team
3x Design devs working on 5 tasks (51% load) thru 2023-08-23
3x Design devs working on 5 tasks (51% load) thru 2023-08-23
..................................................========|=========......===============...............
Origin X1
- Vehicle Content - US
4x Art devs working on 9 tasks (38% load) thru 2023-10-08
1x Design dev will work on 6 tasks (182% load) starting 2023-08-01 thru 2023-09-25
4x Art devs working on 9 tasks (38% load) thru 2023-10-08
1x Design dev will work on 6 tasks (182% load) starting 2023-08-01 thru 2023-09-25
........................................................==|=========~~~~~~~~~~~~~.......................
..........................................................|.....................=========...............
Outpost Homestead - Independent & Outlaw
- EU Sandbox 1
12x Art devs working on 12 tasks (18% load) thru 2023-08-13
4x Design devs working on 8 tasks (39% load) thru 2023-08-13
12x Art devs working on 12 tasks (18% load) thru 2023-08-13
4x Design devs working on 8 tasks (39% load) thru 2023-08-13
==================..==========.============...~~~~~~======|======...=====================...========....
==================..==========.============...~~~~~~======|======...=====================...========....
Persistent Streaming and Server Meshing
- Engine Team
1x Engineering dev working on 4 tasks (128% load) thru 2023-08-24
1x Engineering dev working on 4 tasks (128% load) thru 2023-08-24
=================.......================............======|=========....................................
- Game Services Team
10x Engineering devs working on 43 tasks (14% load) thru 2023-09-28
10x Engineering devs working on 43 tasks (14% load) thru 2023-09-28
==========================================================|===================..........................
- Mission Feature Team
3x Engineering devs working on 4 tasks (41% load) thru 2023-08-23
3x Engineering devs working on 4 tasks (41% load) thru 2023-08-23
....=================.............................========|=========....................................
- Network Team
9x Engineering devs working on 9 tasks (19% load) thru 2023-09-28
9x Engineering devs working on 9 tasks (19% load) thru 2023-09-28
====================~~~~~~~~====================....======|===================..........................
- Persistent Tech Team
4x Engineering devs working on 8 tasks (38% load) thru 2023-09-28
4x Engineering devs working on 8 tasks (38% load) thru 2023-09-28
====================~~~~~~~~====================....======|===================..........................
Physical Damage & Breakability
- Physics Team
3x Engineering devs working on 4 tasks (46% load) thru 2023-08-14
3x Engineering devs working on 4 tasks (46% load) thru 2023-08-14
===================.....==============.======.....========|======.......................................
Physics - Ropes Simulation
- Physics Team
1x Engineering dev working on 3 tasks (104% load) thru 2023-08-14
1x Engineering dev working on 3 tasks (104% load) thru 2023-08-14
===================.....==============.======.....========|======.......................................
Pyro Space Stations
- EU Landing Zone 1
14x Art devs working on 19 tasks (41% load) thru 2023-08-13
3x Design devs working on 7 tasks (71% load) thru 2023-08-13
14x Art devs working on 19 tasks (41% load) thru 2023-08-13
3x Design devs working on 7 tasks (71% load) thru 2023-08-13
=============...........=================.......==========|======.......=================...............
=============...........=================.......==========|======.......=================...............
- VFX Team
4x Art devs working on 5 tasks (39% load) thru 2023-08-23
4x Art devs working on 5 tasks (39% load) thru 2023-08-23
..................................................========|=========....................................
Pyro System, Planet, and Mission Setup
- Narrative
5x Design devs working on 6 tasks (23% load) thru 2023-09-28
5x Design devs working on 6 tasks (23% load) thru 2023-09-28
....................................................======|===================..........................
- US PU Gameplay Feature Team
3x Design devs working on 7 tasks (71% load) thru 2023-08-28
3x Design devs working on 7 tasks (71% load) thru 2023-08-28
................................====~~~~~...........======|==========.....===============...............
Quantum Simulation
- Systemic Services and Tools Team
6x Engineering devs working on 21 tasks (35% load) thru 2023-12-14
6x Engineering devs working on 21 tasks (35% load) thru 2023-12-14
=================================================.========|=========================================....
RaStar
- Planet Tech Team
4x Engineering devs working on 7 tasks (44% load) thru 2023-09-07
4x Engineering devs working on 7 tasks (44% load) thru 2023-09-07
=====================...====================........======|=============................................
Reputation - Hostility
- Mission Feature Team
1x Engineering dev working on 4 tasks (123% load) thru 2023-08-23
1x Engineering dev working on 4 tasks (123% load) thru 2023-08-23
..................................................========|=========......===============...............
Reputation - Sandbox Triggers
(Scheduled work ending soon!)
- Mission Feature Team
1x Engineering dev working on 2 tasks (128% load) thru 2023-07-26
1x Engineering dev working on 2 tasks (128% load) thru 2023-07-26
..................................................========|=............................................
Resource Management
- EU PU Gameplay Feature Team
3x Design devs working on 15 tasks (44% load) thru 2023-12-14
4x Engineering devs working on 13 tasks (44% load) thru 2023-11-05
3x Design devs working on 15 tasks (44% load) thru 2023-12-14
4x Engineering devs working on 13 tasks (44% load) thru 2023-11-05
=========...............~~~~~~~~~.......====~~~~~...====~~|~~~~~==========~~~~~~~~~~================....
=====...........=====================...=========...======|==============================...========....
- Vehicle Feature Team
5x Engineering devs working on 7 tasks (28% load) thru 2023-09-25
5x Engineering devs working on 7 tasks (28% load) thru 2023-09-25
............................=========...............======|==================...........................
RSI Polaris
- Vehicle Content - EU
7x Art devs working on 25 tasks (80% load) thru 2023-09-14
7x Art devs working on 25 tasks (80% load) thru 2023-09-14
..........................======================....======|===============....======================....
Salvage - Vehicle Munching
- EU PU Gameplay Feature Team
1x Engineering dev working on 5 tasks (152% load) thru 2023-08-28
1x Design dev working on 4 tasks (81% load) thru 2023-08-14
1x Engineering dev working on 5 tasks (152% load) thru 2023-08-28
1x Design dev working on 4 tasks (81% load) thru 2023-08-14
........................=========...........=====...======|==========...=================...========....
........................~~~~~...............~~~~~...~~~~~~|~~~~~~.........~~~~~~~~~~~...................
SQ42 - Vehicle Support
- Audio
11x Audio devs working on 17 tasks (8% load) thru 2023-09-27
11x Audio devs working on 17 tasks (8% load) thru 2023-09-27
============================~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~~~..........................
- Vehicle Content - EU
4x Design devs working on 13 tasks (73% load) thru 2023-09-14
5x Art devs working on 12 tasks (54% load) thru 2023-09-14
4x Design devs working on 13 tasks (73% load) thru 2023-09-14
5x Art devs working on 12 tasks (54% load) thru 2023-09-14
======================....======================....======|===============....======================....
..........................======================....======|===============..............................
- Vehicle Feature Team
7x Engineering devs working on 7 tasks (20% load) thru 2023-09-25
7x Engineering devs working on 7 tasks (20% load) thru 2023-09-25
======================..=========================...======|==================...........................
- VFX Team
1x Art dev working on 4 tasks (123% load) thru 2023-08-23
1x Art dev working on 4 tasks (123% load) thru 2023-08-23
..................................................========|=========....................................
TestRunner Improvements
- Tools Team
4x Engineering devs working on 19 tasks (29% load) thru 2023-09-28
4x Engineering devs working on 19 tasks (29% load) thru 2023-09-28
==========================================================|===================..........................
Tumbril Storm
(Scheduled work ending soon!)
- Vehicle Content - US
2x Tech Content devs working on 6 tasks (385% load) thru 2023-07-31
1x Design dev working on 4 tasks (247% load) thru 2023-07-31
2x Tech Content devs working on 6 tasks (385% load) thru 2023-07-31
1x Design dev working on 4 tasks (247% load) thru 2023-07-31
........................................................==|==...........................................
..........................========================..======|==...........................................
======================....========================..=====.|.............................................
Unannounced Vehicle
- Vehicle Content - MTL
2x Art devs working on 15 tasks (96% load) thru 2023-10-05
2x Art devs working on 15 tasks (96% load) thru 2023-10-05
..........................~~====~~~~~~~~~~~~~~~~....~~~~~~|~~~~~~~~~~~~~~~~~~~~~........................
- VFX Team
1x Art dev working on 2 tasks (128% load) thru 2023-07-26
1x Art dev working on 2 tasks (128% load) thru 2023-07-26
..................................................========|=............................................
Unannounced Vehicle
- Vehicle Content - EU
4x Art devs working on 13 tasks (73% load) thru 2023-09-14
4x Art devs working on 13 tasks (73% load) thru 2023-09-14
................======....======================..........|.............................................
................======....======================....======|===============....======....................
- VFX Team
1x Art dev will work on 2 tasks (123% load) starting 2023-07-27 thru 2023-08-23
1x Art dev will work on 2 tasks (123% load) starting 2023-07-27 thru 2023-08-23
..........................................................|=========....................................
Unannounced Vehicle
- Vehicle Content - MTL
2x Art devs working on 19 tasks (167% load) thru 2023-10-05
2x Art devs working on 19 tasks (167% load) thru 2023-10-05
..................................==============....======|=====================........................
Underground Facilities
- Location Concept Art
5x Art devs working on 10 tasks (38% load) thru 2023-09-28
5x Art devs working on 10 tasks (38% load) thru 2023-09-28
====================~~~~~~~~====================....======|===================..........................
- MTL Sandbox 1
7x Art devs working on 31 tasks (21% load) thru 2023-12-14
3x Design devs working on 25 tasks (39% load) thru 2023-12-14
7x Art devs working on 31 tasks (21% load) thru 2023-12-14
3x Design devs working on 25 tasks (39% load) thru 2023-12-14
==============================.===============~~~~~~======|=========================================....
==============================.===============~~~~~~======|=========================================....
Vehicle Tractor Beams
- Narrative
1x Design dev working on 6 tasks (115% load) thru 2023-09-28
1x Design dev working on 6 tasks (115% load) thru 2023-09-28
................=========...........................======|===================..........................
Virtual AI Service
- Systemic Services and Tools Team
2x Engineering devs working on 5 tasks (77% load) thru 2023-08-23
2x Engineering devs working on 5 tasks (77% load) thru 2023-08-23
=========.........................................========|=========......===============...............
The following deliverables are scheduled to begin (or continue) work within two weeks
Chapter 05
- VFX Team
1x Art dev will work on 1 task (128% load) starting 2023-07-27 thru 2023-08-09
1x Art dev will work on 1 task (128% load) starting 2023-07-27 thru 2023-08-09
................................======....................|=====........................................
Chapter 17
- VFX Team
1x Art dev will work on 2 tasks (123% load) starting 2023-07-27 thru 2023-08-23
1x Art dev will work on 2 tasks (123% load) starting 2023-07-27 thru 2023-08-23
................................==========................|=========....................................
New Interdiction Scenarios
- EU Sandbox 1
1x Design dev will work on 2 tasks (256% load) starting 2023-07-31 thru 2023-08-13
1x Design dev will work on 2 tasks (256% load) starting 2023-07-31 thru 2023-08-13
=============.........................=====...~~~~~~......|.=====...=====...........=====...............
NPC Scheduler Service
- Systemic Services and Tools Team
3x Engineering devs will work on 3 tasks (62% load) starting 2023-07-27 thru 2023-08-23
3x Engineering devs will work on 3 tasks (62% load) starting 2023-07-27 thru 2023-08-23
....=========.............................................|=========............=========...............
Reputation - Shop Discounts
(Starting soon!)
- Mission Feature Team
1x Engineering dev will work on 2 tasks (123% load) starting 2023-07-27 thru 2023-08-23
1x Engineering dev will work on 2 tasks (123% load) starting 2023-07-27 thru 2023-08-23
..........................................................|=========....................................