Scheduled Deliverables
as of 2023-05-17
There are currently 86 scheduled deliverables being worked on by 47 teams
7 deliverables are scheduled to begin work by 4 team(s) within two weeks
This report lists the actively assigned deliverables and the associated teams, along with the number of developers assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.
The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.
The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.
extra analysis (click me)
There are approximately 413 devs (out of ~512, or 81%) with 866 assignments scheduled to work on 86 observable deliverables. Of those deliverables, 31% are for SQ42 exclusively, with ~344 devs (67%) scheduled for approximately 4924 man-days. 26% of deliverables are shared between both projects.
9 deliverable(s) are not currently scheduled to continue work after this sprint:
- Derelict Spaceships - Points of Interest
- Enemy Characters
- Flak Ammunition
- Military Multi-Tool
- Persistent Habs
- RaStar
- Unannounced Vehicle
- Unannounced Vehicle
- Unannounced Vehicle
- Actor Feature Team
17% part-time with 90 task(s) scheduled, 50% of which are for SQ42 - Actor Tech Team
27% part-time with 30 task(s) scheduled, 60% of which are for SQ42 - AI Content Team
43% part-time with 67 task(s) scheduled, 67% of which are for SQ42 - AI Tech and Feature Team
25% part-time with 79 task(s) scheduled, 75% of which are for SQ42 - Audio
full-time with 10 task(s) scheduled, all of which are for SQ42 - Character Tech Art
full-time with 30 task(s) scheduled, 80% of which are for SQ42 - Cinematics Team
full-time with 24 task(s) scheduled, all of which are for SQ42 - Editor Team
full-time with 29 task(s) scheduled, 50% of which are for SQ42 - Engine Team
70% part-time with 20 task(s) scheduled, 33% of which are for SQ42 - EU Landing Zone 1
full-time with 36 task(s) scheduled, all of which are for SC - EU Landing Zone 2
full-time with 18 task(s) scheduled, all of which are for SC - EU PU Gameplay Feature Team
full-time with 13 task(s) scheduled, 50% of which are for SQ42 - EU Sandbox 1
full-time with 32 task(s) scheduled, all of which are for SC - Facial Animation
5% part-time with 38 task(s) scheduled, all of which are for SQ42 - Game Services Team
27% part-time with 45 task(s) scheduled, all of which are for SC - Gameplay Story
100% part-time with 70 task(s) scheduled, 89% of which are for SQ42 - Graphics Team
full-time with 43 task(s) scheduled, 53% of which are for SQ42 - Live Tools Team
full-time with 28 task(s) scheduled, 33% of which are for SQ42 - Location Concept Art
10% part-time with 21 task(s) scheduled, all of which are for SC - Mission Feature Team
10% part-time with 72 task(s) scheduled, 15% of which are for SQ42 - Motion Capture Team
5% part-time with 41 task(s) scheduled, all of which are for SQ42 - MTL Sandbox 1
5% part-time with 168 task(s) scheduled, all of which are for SC - Narrative
33% part-time with 36 task(s) scheduled, 33% of which are for SQ42 - Network Team
8% part-time with 25 task(s) scheduled, all of which are for SC - Persistent Tech Team
7% part-time with 29 task(s) scheduled, all of which are for SC - Physics Team
full-time with 13 task(s) scheduled, 50% of which are for SQ42 - Planet Tech Team
full-time with 10 task(s) scheduled, all of which are for SC - SC Character Art
full-time with 47 task(s) scheduled, 25% of which are for SQ42 - SQ42 Art
18% part-time with 110 task(s) scheduled, all of which are for SQ42 - SQ42 Character Art
7% part-time with 56 task(s) scheduled, all of which are for SQ42 - SQ42 Feature Team
full-time with 21 task(s) scheduled, 60% of which are for SQ42 - SQ42 Level Design 1 - FPS
full-time with 78 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 2 - Flight
36% part-time with 59 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 3 - Social
full-time with 25 task(s) scheduled, all of which are for SQ42 - SQ42 UI Feature Team
full-time with 33 task(s) scheduled, 83% of which are for SQ42 - Systemic Services and Tools Team
full-time with 43 task(s) scheduled, 33% of which are for SQ42 - Tech Animation Team
13% part-time with 32 task(s) scheduled, all of which are for SQ42 - Tools Team
full-time with 36 task(s) scheduled, 50% of which are for SQ42 - UI Tech Team
full-time with 2 task(s) scheduled, 50% of which are for SQ42 - US PU Gameplay Feature Team
78% part-time with 93 task(s) scheduled, 25% of which are for SQ42 - Vehicle Concept Art
full-time with 36 task(s) scheduled, all of which are for SC - Vehicle Content - EU
full-time with 176 task(s) scheduled, 43% of which are for SQ42 - Vehicle Content - MTL
32% part-time with 19 task(s) scheduled, all of which are for SC - Vehicle Content - US
full-time with 33 task(s) scheduled, 33% of which are for SQ42 - Vehicle Feature Team
full-time with 52 task(s) scheduled, 89% of which are for SQ42 - VFX Team
full-time with 29 task(s) scheduled, 60% of which are for SQ42 - Weapon Feature Team
9% part-time with 100 task(s) scheduled, 44% of which are for SQ42
Actor Status T2
- Actor Feature Team
2x Engineering devs working on 8 tasks (67% load) thru 2023-06-15
2x Engineering devs working on 8 tasks (67% load) thru 2023-06-15
........................==============|=========........................................................
Additional Derelict Settlements
- MTL Sandbox 1
3x Art devs working on 29 tasks (90% load) thru 2023-06-29
2x Design devs working on 23 tasks (107% load) thru 2023-06-29
3x Art devs working on 29 tasks (90% load) thru 2023-06-29
2x Design devs working on 23 tasks (107% load) thru 2023-06-29
==============================.=======|=======~~~~~~....................................................
==============================.=======|=======~~~~~~....................................................
Asteroid Facilities
- EU Sandbox 1
3x Art devs working on 6 tasks (44% load) thru 2023-05-30
3x Art devs working on 6 tasks (44% load) thru 2023-05-30
........==========..==========.=======|====...~~~~~~=============...=====...............................
Bounty Hunter V2
- EU Landing Zone 2
3x Art devs working on 18 tasks (56% load) thru 2023-07-02
3x Art devs working on 18 tasks (56% load) thru 2023-07-02
======================================|==============...................................................
- Mission Feature Team
2x Engineering devs working on 7 tasks (63% load) thru 2023-06-29
4x Design devs will work on 3 tasks (34% load) starting 2023-05-23 thru 2023-06-29
2x Engineering devs working on 7 tasks (63% load) thru 2023-06-29
4x Design devs will work on 3 tasks (34% load) starting 2023-05-23 thru 2023-06-29
....=================.................|.============....................................................
....=================...==============|=============....................................................
- Narrative
2x Design devs working on 7 tasks (44% load) thru 2023-06-22
2x Design devs working on 7 tasks (44% load) thru 2023-06-22
........====~~~~~.............~~~~~~~~|~~~~~~~~~~~......................................................
- US PU Gameplay Feature Team
2x Art devs working on 3 tasks (114% load) thru 2023-05-18
2x Art devs working on 3 tasks (114% load) thru 2023-05-18
========............................~~|~....................=====.......................................
Bug Fixing & Tech Debt
- Actor Feature Team
1x Engineering dev working on 8 tasks (134% load) thru 2023-06-15
1x Animation dev working on 5 tasks (214% load) thru 2023-06-15
1x Engineering dev working on 8 tasks (134% load) thru 2023-06-15
1x Animation dev working on 5 tasks (214% load) thru 2023-06-15
........................==============|=========........................................................
....................................==|=========........................................................
- EU PU Gameplay Feature Team
6x Engineering devs working on 8 tasks (54% load) thru 2023-06-05
3x Design devs working on 5 tasks (68% load) thru 2023-06-05
6x Engineering devs working on 8 tasks (54% load) thru 2023-06-05
3x Design devs working on 5 tasks (68% load) thru 2023-06-05
=========================.......======|======...........................................................
....=====================.......======|======...................=============...........................
- Live Tools Team
6x Engineering devs working on 13 tasks (20% load) thru 2023-07-02
6x Engineering devs working on 13 tasks (20% load) thru 2023-07-02
======================================|==============...................................................
- US PU Gameplay Feature Team
7x Design devs working on 16 tasks (32% load) thru 2023-06-19
4x Art devs working on 5 tasks (25% load) thru 2023-06-19
5x Engineering devs will work on 25 tasks (154% load) starting 2023-05-23 thru 2023-06-19
7x Design devs working on 16 tasks (32% load) thru 2023-06-19
4x Art devs working on 5 tasks (25% load) thru 2023-06-19
5x Engineering devs will work on 25 tasks (154% load) starting 2023-05-23 thru 2023-06-19
========================....~~~~~~~~~~|~~~~~~~~~~...=========================...........................
....................====............~~|~~~~~~~~~~...............=============...........................
....................====..............|.~~~~~~~~~...................=========...........................
- Engine Team
5x Engineering devs will work on 16 tasks (213% load) starting 2023-05-21 thru 2023-06-15
5x Engineering devs will work on 16 tasks (213% load) starting 2023-05-21 thru 2023-06-15
................====~~~~~.............|.========........................................................
- EU Landing Zone 1
5x Design devs will work on 13 tasks (160% load) starting 2023-05-22 thru 2023-06-18
15x Art devs will work on 49 tasks (202% load) starting 2023-05-22 thru 2023-06-18
5x Design devs will work on 13 tasks (160% load) starting 2023-05-22 thru 2023-06-18
15x Art devs will work on 49 tasks (202% load) starting 2023-05-22 thru 2023-06-18
=...........=============.............|.=========...............=========...............................
=...........=============.............|.=========...............=========...............................
- EU Sandbox 1
13x Art devs will work on 14 tasks (128% load) starting 2023-05-31 thru 2023-06-14
6x Design devs will work on 6 tasks (119% load) starting 2023-05-31 thru 2023-06-14
13x Art devs will work on 14 tasks (128% load) starting 2023-05-31 thru 2023-06-14
6x Design devs will work on 6 tasks (119% load) starting 2023-05-31 thru 2023-06-14
................=====.................|...======................=====...................................
................=====.................|...======................=====...................................
Building Interiors
- MTL Sandbox 1
15x Art devs working on 41 tasks (27% load) thru 2023-09-10
7x Design devs working on 23 tasks (21% load) thru 2023-09-10
15x Art devs working on 41 tasks (27% load) thru 2023-09-10
7x Design devs working on 23 tasks (21% load) thru 2023-09-10
........................======.=======|=======~~~~~~=====================...............................
==============================.=======|=======~~~~~~=====================...............................
Chapter 01
- Vehicle Feature Team
1x Design dev working on 9 tasks (273% load) thru 2023-06-19
1x Design dev working on 9 tasks (273% load) thru 2023-06-19
................................======|==========.......................................................
- Character Tech Art
6x Tech Content devs will work on 3 tasks (76% load) starting 2023-05-21 thru 2023-06-01
6x Tech Content devs will work on 3 tasks (76% load) starting 2023-05-21 thru 2023-06-01
========............====..............|.====............................................................
Chapter 04
- AI Content Team
7x Design devs working on 17 tasks (20% load) thru 2023-07-02
7x Design devs working on 17 tasks (20% load) thru 2023-07-02
======================================|=~~~~=========...................................................
- Gameplay Story
5x Animation devs working on 10 tasks (24% load) thru 2023-07-03
5x Animation devs working on 10 tasks (24% load) thru 2023-07-03
................................~~~~~~|~~~~~~~~~~~~~~...................................................
- SQ42 Art
6x Art devs working on 10 tasks (22% load) thru 2023-06-21
6x Art devs working on 10 tasks (22% load) thru 2023-06-21
............==========================|===========......................................................
- SQ42 Character Art
4x Art devs working on 13 tasks (33% load) thru 2023-06-15
4x Art devs working on 13 tasks (33% load) thru 2023-06-15
============~~~~======================|=========........................................................
- SQ42 Feature Team
1x Engineering dev working on 5 tasks (152% load) thru 2023-06-18
1x Engineering dev working on 5 tasks (152% load) thru 2023-06-18
................................======|==========.......................................................
- SQ42 Level Design 3 - Social
2x Design devs working on 4 tasks (81% load) thru 2023-06-18
2x Design devs working on 4 tasks (81% load) thru 2023-06-18
....................................==|==========.......................................................
- SQ42 UI Feature Team
1x Art dev working on 7 tasks (120% load) thru 2023-07-02
1x Art dev working on 7 tasks (120% load) thru 2023-07-02
........................==============|==============...................................................
Chapter 05
- Character Tech Art
5x Tech Content devs working on 8 tasks (68% load) thru 2023-06-15
5x Tech Content devs working on 8 tasks (68% load) thru 2023-06-15
........============................==|=========........................................................
- SQ42 Character Art
5x Art devs working on 19 tasks (40% load) thru 2023-06-01
5x Art devs working on 19 tasks (40% load) thru 2023-06-01
============~~~~====================~~|~====............................................................
- SQ42 Level Design 1 - FPS
1x Design dev working on 3 tasks (185% load) thru 2023-05-21
1x Design dev working on 3 tasks (185% load) thru 2023-05-21
........==========..............======|==...............................................................
- AI Content Team
2x Design devs will work on 3 tasks (192% load) starting 2023-05-22 thru 2023-06-04
2x Design devs will work on 3 tasks (192% load) starting 2023-05-22 thru 2023-06-04
................=====.......=====.....|.=====...........................................................
Chapter 06
- Gameplay Story
5x Animation devs working on 10 tasks (62% load) thru 2023-06-05
5x Animation devs working on 10 tasks (62% load) thru 2023-06-05
....................................~~|~~~~~~...........................................................
Chapter 07
- SQ42 Level Design 2 - Flight
4x Design devs working on 15 tasks (34% load) thru 2023-06-18
4x Design devs working on 15 tasks (34% load) thru 2023-06-18
========================~~~~==========|==========.......................................................
- Vehicle Feature Team
2x Engineering devs working on 2 tasks (128% load) thru 2023-05-22
2x Engineering devs working on 2 tasks (128% load) thru 2023-05-22
........................=========...==|==...............................................................
Chapter 10
- Gameplay Story
5x Animation devs working on 9 tasks (27% load) thru 2023-07-03
5x Animation devs working on 9 tasks (27% load) thru 2023-07-03
....................................~~|~~~~~~~~~~~~~~...................................................
- SQ42 Level Design 3 - Social
1x Design dev will work on 3 tasks (185% load) starting 2023-05-22 thru 2023-06-18
1x Design dev will work on 3 tasks (185% load) starting 2023-05-22 thru 2023-06-18
......................................|.=========.......................................................
Chapter 11
- AI Content Team
1x Design dev working on 4 tasks (102% load) thru 2023-05-21
1x Design dev working on 4 tasks (102% load) thru 2023-05-21
............................~~~~====~~|~~...............................................................
- SQ42 Level Design 2 - Flight
3x Design devs working on 6 tasks (44% load) thru 2023-06-18
3x Design devs working on 6 tasks (44% load) thru 2023-06-18
....====~~~~=============...====~~~~==|==========.......................................................
Chapter 12
- Gameplay Story
5x Animation devs working on 8 tasks (33% load) thru 2023-06-19
5x Animation devs working on 8 tasks (33% load) thru 2023-06-19
............~~~~~~~~~~~~~...~~~~~...~~|~~~~~~~~~~.......................................................
- SQ42 Character Art
5x Art devs working on 6 tasks (35% load) thru 2023-06-15
5x Art devs working on 6 tasks (35% load) thru 2023-06-15
................~~~~====........====~~|~========........................................................
- SQ42 Level Design 1 - FPS
5x Design devs working on 7 tasks (42% load) thru 2023-06-18
5x Design devs working on 7 tasks (42% load) thru 2023-06-18
........=================.......======|==========.......................................................
- Vehicle Feature Team
2x Engineering devs working on 8 tasks (81% load) thru 2023-06-19
2x Engineering devs working on 8 tasks (81% load) thru 2023-06-19
==========..............==============|==========.......................................................
- AI Content Team
6x Design devs will work on 7 tasks (47% load) starting 2023-05-22 thru 2023-07-02
6x Design devs will work on 7 tasks (47% load) starting 2023-05-22 thru 2023-07-02
====~~~~=====...~~~~~...~~~~~.........|.=============...................................................
- Character Tech Art
5x Tech Content devs will work on 3 tasks (91% load) starting 2023-05-21 thru 2023-06-01
5x Tech Content devs will work on 3 tasks (91% load) starting 2023-05-21 thru 2023-06-01
............====......................|.====............................................................
Chapter 13
- Gameplay Story
5x Animation devs working on 9 tasks (27% load) thru 2023-07-03
5x Animation devs working on 9 tasks (27% load) thru 2023-07-03
....................................~~|~~~~~~~~~~~~~~...................................................
- SQ42 Level Design 3 - Social
2x Design devs working on 4 tasks (81% load) thru 2023-06-18
2x Design devs working on 4 tasks (81% load) thru 2023-06-18
....................................==|==========.......................................................
Chapter 14
- AI Tech and Feature Team
2x Engineering devs working on 4 tasks (123% load) thru 2023-06-04
2x Engineering devs working on 4 tasks (123% load) thru 2023-06-04
=========...=========...............==|======...........................................................
- SQ42 Level Design 1 - FPS
9x Design devs working on 13 tasks (15% load) thru 2023-06-18
9x Design devs working on 13 tasks (15% load) thru 2023-06-18
======================================|==========.......................................................
- Vehicle Feature Team
2x Engineering devs working on 5 tasks (102% load) thru 2023-06-19
2x Engineering devs working on 5 tasks (102% load) thru 2023-06-19
....................................==|==========...=========...........................................
==========================............|.................................................................
- VFX Team
2x Art devs working on 5 tasks (102% load) thru 2023-05-24
2x Art devs working on 5 tasks (102% load) thru 2023-05-24
............................==========|===..............................................................
Chapter 16
- SQ42 Level Design 2 - Flight
3x Design devs working on 5 tasks (40% load) thru 2023-06-18
3x Design devs working on 5 tasks (40% load) thru 2023-06-18
........~~~~=============.......~~~~==|==========.......................................................
Chapter 17
- Narrative
1x Design dev working on 5 tasks (107% load) thru 2023-06-08
1x Design dev working on 5 tasks (107% load) thru 2023-06-08
..................................~~~~|~~~~~~~..........................................................
- SQ42 Art
10x Art devs working on 25 tasks (12% load) thru 2023-06-21
10x Art devs working on 25 tasks (12% load) thru 2023-06-21
======================================|===========......................................................
- SQ42 Level Design 1 - FPS
2x Design devs working on 13 tasks (66% load) thru 2023-06-18
2x Design devs working on 13 tasks (66% load) thru 2023-06-18
======================================|==========.......................................................
- SQ42 Level Design 2 - Flight
4x Design devs working on 13 tasks (32% load) thru 2023-06-18
4x Design devs working on 13 tasks (32% load) thru 2023-06-18
====================~~~~==============|=====~~~~~.......................................................
- Vehicle Feature Team
2x Engineering devs working on 6 tasks (91% load) thru 2023-06-19
2x Engineering devs working on 6 tasks (91% load) thru 2023-06-19
............========~~~~~~~~~...======|==========...=====...............................................
- VFX Team
1x Art dev working on 4 tasks (247% load) thru 2023-05-24
1x Art dev working on 4 tasks (247% load) thru 2023-05-24
................................======|===..............................................................
Chapter 18
- SQ42 Character Art
2x Art devs working on 3 tasks (100% load) thru 2023-06-01
2x Art devs working on 3 tasks (100% load) thru 2023-06-01
....................................==|=====............................................................
- SQ42 Level Design 1 - FPS
4x Design devs working on 3 tasks (46% load) thru 2023-05-21
4x Design devs working on 3 tasks (46% load) thru 2023-05-21
........==========..............======|==...............................................................
- Character Tech Art
3x Tech Content devs will work on 3 tasks (67% load) starting 2023-05-21 thru 2023-06-15
3x Tech Content devs will work on 3 tasks (67% load) starting 2023-05-21 thru 2023-06-15
......................................|.========........................................................
Chapter 19
- Character Tech Art
2x Tech Content devs working on 3 tasks (227% load) thru 2023-05-18
2x Tech Content devs working on 3 tasks (227% load) thru 2023-05-18
....................................==|=................................................................
- SQ42 Art
8x Art devs working on 10 tasks (30% load) thru 2023-06-21
8x Art devs working on 10 tasks (30% load) thru 2023-06-21
............................==========|===========......................................................
- SQ42 Level Design 1 - FPS
6x Design devs working on 7 tasks (37% load) thru 2023-05-21
6x Design devs working on 7 tasks (37% load) thru 2023-05-21
==================......==============|==...............................................................
- SQ42 Level Design 2 - Flight
2x Design devs working on 6 tasks (56% load) thru 2023-06-04
2x Design devs working on 6 tasks (56% load) thru 2023-06-04
~~~~====~~~~=========...~~~~====~~~~==|======...........................................................
- Narrative
1x Design dev will work on 4 tasks (267% load) starting 2023-05-28 thru 2023-06-22
1x Design dev will work on 4 tasks (267% load) starting 2023-05-28 thru 2023-06-22
....................=====.............|...========......................................................
Chapter 20
- SQ42 Level Design 3 - Social
1x Design dev working on 5 tasks (157% load) thru 2023-05-21
1x Design dev working on 5 tasks (157% load) thru 2023-05-21
=============...........==============|==...............................................................
- VFX Team
1x Art dev working on 2 tasks (256% load) thru 2023-05-24
1x Art dev working on 2 tasks (256% load) thru 2023-05-24
....................................==|===..............................................................
- SQ42 Level Design 1 - FPS
6x Design devs will work on 5 tasks (51% load) starting 2023-05-22 thru 2023-06-18
6x Design devs will work on 5 tasks (51% load) starting 2023-05-22 thru 2023-06-18
................=========.............|.=========.......................................................
Chapter 21
- SQ42 Art
3x Art devs working on 10 tasks (22% load) thru 2023-06-21
3x Art devs working on 10 tasks (22% load) thru 2023-06-21
............~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~......................................................
- SQ42 Character Art
1x Art dev working on 6 tasks (189% load) thru 2023-06-15
1x Art dev working on 6 tasks (189% load) thru 2023-06-15
................................======|=========........................................................
- SQ42 Level Design 3 - Social
3x Design devs working on 4 tasks (54% load) thru 2023-06-18
3x Design devs working on 4 tasks (54% load) thru 2023-06-18
....................................==|==========.......................................................
- VFX Team
1x Art dev working on 4 tasks (247% load) thru 2023-05-24
1x Art dev working on 4 tasks (247% load) thru 2023-05-24
................................======|===..............................................................
- AI Content Team
7x Design devs will work on 4 tasks (15% load) starting 2023-05-22 thru 2023-07-02
7x Design devs will work on 4 tasks (15% load) starting 2023-05-22 thru 2023-07-02
........~~~~============~~~~~~~~~~~~~.|.~~~~=========...................................................
- Vehicle Feature Team
1x Engineering dev will work on 4 tasks (247% load) starting 2023-05-23 thru 2023-06-19
1x Engineering dev will work on 4 tasks (247% load) starting 2023-05-23 thru 2023-06-19
......................................|.=========...=============.......................................
Chapter 22
- SQ42 Level Design 1 - FPS
10x Design devs working on 19 tasks (19% load) thru 2023-06-18
10x Design devs working on 19 tasks (19% load) thru 2023-06-18
======================================|==========.......................................................
- SQ42 Level Design 2 - Flight
2x Design devs working on 5 tasks (53% load) thru 2023-06-18
2x Design devs working on 5 tasks (53% load) thru 2023-06-18
........~~~~========~~~~~.......~~~~==|=====~~~~~.......................................................
Chapter 23
- SQ42 Art
3x Art devs working on 10 tasks (22% load) thru 2023-06-21
3x Art devs working on 10 tasks (22% load) thru 2023-06-21
............~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~......................................................
- SQ42 Level Design 3 - Social
2x Design devs working on 5 tasks (76% load) thru 2023-06-18
2x Design devs working on 5 tasks (76% load) thru 2023-06-18
~~~~=====.......................======|==========.......................................................
Chapter 24
- SQ42 Art
1x Art dev working on 2 tasks (256% load) thru 2023-05-24
1x Art dev working on 2 tasks (256% load) thru 2023-05-24
....................................==|===..............................................................
- SQ42 Level Design 2 - Flight
2x Design devs working on 5 tasks (45% load) thru 2023-06-18
2x Design devs working on 5 tasks (45% load) thru 2023-06-18
........~~~~~~~~~~~~=====.......~~~~~~|~~~~~=====.......................................................
- SQ42 Level Design 1 - FPS
1x Design dev will work on 3 tasks (185% load) starting 2023-05-22 thru 2023-06-18
1x Design dev will work on 3 tasks (185% load) starting 2023-05-22 thru 2023-06-18
................=========.............|.=========.......................................................
Chapter 25
- SQ42 Art
4x Art devs working on 11 tasks (55% load) thru 2023-06-21
4x Art devs working on 11 tasks (55% load) thru 2023-06-21
........................==============|===========......................................................
- SQ42 Level Design 3 - Social
1x Design dev working on 3 tasks (185% load) thru 2023-05-21
1x Design dev working on 3 tasks (185% load) thru 2023-05-21
=========.......................======|==...............................................................
Chapter 26
- Gameplay Story
4x Animation devs working on 6 tasks (23% load) thru 2023-07-03
4x Animation devs working on 6 tasks (23% load) thru 2023-07-03
~~~~~~~~~...........................~~|~~~~~~~~~~~~~~...................................................
- SQ42 Art
11x Art devs working on 8 tasks (12% load) thru 2023-06-21
11x Art devs working on 8 tasks (12% load) thru 2023-06-21
....................==================|===========......................................................
- SQ42 Level Design 1 - FPS
9x Design devs working on 13 tasks (15% load) thru 2023-06-18
9x Design devs working on 13 tasks (15% load) thru 2023-06-18
======================================|==========.......................................................
- SQ42 UI Feature Team
2x Art devs working on 5 tasks (76% load) thru 2023-07-02
2x Art devs working on 5 tasks (76% load) thru 2023-07-02
....................................==|==============...................................................
- SQ42 Level Design 3 - Social
1x Design dev will work on 3 tasks (185% load) starting 2023-05-22 thru 2023-06-18
1x Design dev will work on 3 tasks (185% load) starting 2023-05-22 thru 2023-06-18
....................=====.............|.=========.......................................................
Chapter 27
- Gameplay Story
4x Animation devs working on 10 tasks (30% load) thru 2023-07-03
4x Animation devs working on 10 tasks (30% load) thru 2023-07-03
................................~~~~~~|~~~~~~~~~~~~~~...................................................
- SQ42 Art
1x Art dev working on 5 tasks (152% load) thru 2023-06-21
1x Art dev working on 5 tasks (152% load) thru 2023-06-21
................................======|===========......................................................
- SQ42 Level Design 2 - Flight
4x Design devs working on 4 tasks (20% load) thru 2023-06-04
4x Design devs working on 4 tasks (20% load) thru 2023-06-04
........~~~~~~~~~~~~~...........~~~~~~|~~~~~~...........................................................
- Vehicle Feature Team
1x Engineering dev working on 5 tasks (152% load) thru 2023-06-05
1x Engineering dev working on 5 tasks (152% load) thru 2023-06-05
............................==========|======...........................................................
Character Work
- AI Tech and Feature Team
3x Animation devs working on 17 tasks (52% load) thru 2023-07-02
7x Engineering devs working on 26 tasks (34% load) thru 2023-07-02
1x Design dev working on 20 tasks (63% load) thru 2023-07-02
3x Animation devs working on 17 tasks (52% load) thru 2023-07-02
7x Engineering devs working on 26 tasks (34% load) thru 2023-07-02
1x Design dev working on 20 tasks (63% load) thru 2023-07-02
======================================|==============...................................................
======================================|==============...................................................
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~...................................................
- Character Tech Art
7x Tech Content devs working on 5 tasks (31% load) thru 2023-06-15
7x Tech Content devs working on 5 tasks (31% load) thru 2023-06-15
........................========....==|=========........................................................
- Cinematics Team
4x Animation devs working on 15 tasks (114% load) thru 2023-05-25
2x Design devs working on 9 tasks (136% load) thru 2023-05-25
4x Animation devs working on 15 tasks (114% load) thru 2023-05-25
2x Design devs working on 9 tasks (136% load) thru 2023-05-25
==================......==============|===..............................................................
==================......==============|===..............................................................
- Facial Animation
9x Animation devs working on 38 tasks (26% load) thru 2023-06-15
9x Animation devs working on 38 tasks (26% load) thru 2023-06-15
====================~~~~~~~~==========|=========........................................................
- Motion Capture Team
9x Animation devs working on 41 tasks (23% load) thru 2023-07-04
9x Animation devs working on 41 tasks (23% load) thru 2023-07-04
======================================|==============...................................................
- SC Character Art
1x Art dev working on 8 tasks (165% load) thru 2023-06-15
1x Art dev working on 8 tasks (165% load) thru 2023-06-15
........................==============|=========........................................................
- Tech Animation Team
12x Tech Content devs working on 32 tasks (23% load) thru 2023-07-05
12x Tech Content devs working on 32 tasks (23% load) thru 2023-07-05
======================================|===============..................................................
- SQ42 Character Art
10x Art devs will work on 3 tasks (45% load) starting 2023-05-21 thru 2023-06-01
10x Art devs will work on 3 tasks (45% load) starting 2023-05-21 thru 2023-06-01
......................................|.====............................................................
Chemline
- Actor Tech Team
1x Engineering dev working on 8 tasks (134% load) thru 2023-06-15
1x Engineering dev working on 8 tasks (134% load) thru 2023-06-15
........................==============|=========........................................................
Crusader Spirit
- Vehicle Content - EU
5x Art devs working on 58 tasks (117% load) thru 2023-06-15
5x Art devs working on 58 tasks (117% load) thru 2023-06-15
======================================|=========........................................................
======..====..........................|.................................................................
Cutting T2
- Graphics Team
1x Engineering dev working on 5 tasks (126% load) thru 2023-06-05
1x Engineering dev working on 5 tasks (126% load) thru 2023-06-05
........................==============|======...........................................................
- Weapon Feature Team
1x Engineering dev working on 14 tasks (133% load) thru 2023-06-29
1x Engineering dev working on 14 tasks (133% load) thru 2023-06-29
==============================.=======|=============....................................................
Derelict Spaceships - Points of Interest
(Scheduled work ending soon!)
- VFX Team
2x Art devs working on 2 tasks (62% load) thru 2023-05-24
2x Art devs working on 2 tasks (62% load) thru 2023-05-24
................................======|===..............................................................
Distortion Propagation
- Weapon Feature Team
1x Engineering dev working on 9 tasks (250% load) thru 2023-06-29
1x Engineering dev working on 9 tasks (250% load) thru 2023-06-29
..................................====|=============....................................................
Duster Faction Outfits
- SC Character Art
6x Art devs working on 23 tasks (39% load) thru 2023-06-15
6x Art devs working on 23 tasks (39% load) thru 2023-06-15
======================================|=========........................................................
- Character Tech Art
3x Tech Content devs will work on 3 tasks (152% load) starting 2023-05-21 thru 2023-06-01
3x Tech Content devs will work on 3 tasks (152% load) starting 2023-05-21 thru 2023-06-01
........................============..|.====............................................................
Enemy Characters
(Scheduled work ending soon!)
- Character Tech Art
2x Tech Content devs working on 7 tasks (233% load) thru 2023-05-18
2x Tech Content devs working on 7 tasks (233% load) thru 2023-05-18
................................======|=................................................................
- SQ42 Character Art
4x Art devs working on 9 tasks (67% load) thru 2023-05-18
4x Art devs working on 9 tasks (67% load) thru 2023-05-18
........................========~~~~==|=................................................................
Entity Properties Plugin
- Editor Team
1x Engineering dev working on 4 tasks (121% load) thru 2023-07-02
1x Engineering dev working on 4 tasks (121% load) thru 2023-07-02
=========...=====================...==|==============...................................................
Fire Hazard
- Graphics Team
3x Engineering devs working on 5 tasks (42% load) thru 2023-06-05
3x Engineering devs working on 5 tasks (42% load) thru 2023-06-05
........................==============|======...........................................................
- VFX Team
3x Engineering devs working on 6 tasks (61% load) thru 2023-05-24
3x Engineering devs working on 6 tasks (61% load) thru 2023-05-24
==================......==============|===..............................................................
=========.............................|.................................................................
Flak Ammunition
(Scheduled work ending soon!)
- Weapon Feature Team
1x Engineering dev working on 12 tasks (667% load) thru 2023-05-30
1x Engineering dev working on 12 tasks (667% load) thru 2023-05-30
..................................====|====.............................................................
Freight Elevators
- US PU Gameplay Feature Team
3x Engineering devs working on 13 tasks (117% load) thru 2023-06-05
3x Engineering devs working on 13 tasks (117% load) thru 2023-06-05
====================........========~~|~=====.......=====================...............................
............................====......|.................................................................
........============........========..|.............=========...........................................
Frontier Clothing
- Character Tech Art
5x Tech Content devs working on 7 tasks (35% load) thru 2023-05-18
5x Tech Content devs working on 7 tasks (35% load) thru 2023-05-18
================....==================|=....====........................................................
- SC Character Art
16x Art devs will work on 4 tasks (17% load) starting 2023-05-21 thru 2023-06-15
16x Art devs will work on 4 tasks (17% load) starting 2023-05-21 thru 2023-06-15
========================..............|.========........................................................
Gen12 - Renderer T1
- Engine Team
4x Engineering devs working on 15 tasks (71% load) thru 2023-05-18
4x Engineering devs working on 15 tasks (71% load) thru 2023-05-18
=================.......~~~~==========|=................................................................
- Graphics Team
9x Engineering devs working on 8 tasks (22% load) thru 2023-06-05
9x Engineering devs working on 8 tasks (22% load) thru 2023-06-05
===================.....==============|======...........................................................
Hacking T0
- Graphics Team
1x Engineering dev working on 5 tasks (126% load) thru 2023-06-05
1x Engineering dev working on 5 tasks (126% load) thru 2023-06-05
........................==============|======...........................................................
- VFX Team
4x Art devs working on 3 tasks (96% load) thru 2023-05-24
4x Art devs working on 3 tasks (96% load) thru 2023-05-24
....................................==|===..............................................................
- SQ42 UI Feature Team
2x Design devs will work on 3 tasks (192% load) starting 2023-05-22 thru 2023-06-04
2x Design devs will work on 3 tasks (192% load) starting 2023-05-22 thru 2023-06-04
....=========.......=====.............|.=====...........................................................
Headhunters Faction Outfits
- SC Character Art
2x Art devs working on 11 tasks (113% load) thru 2023-06-15
2x Art devs working on 11 tasks (113% load) thru 2023-06-15
........................==============|=========........................................................
HEX
- Live Tools Team
5x Engineering devs working on 15 tasks (27% load) thru 2023-07-02
5x Engineering devs working on 15 tasks (27% load) thru 2023-07-02
======================================|==============...................................................
Map and Radar System Rework
- SQ42 Feature Team
1x Engineering dev working on 12 tasks (132% load) thru 2023-06-18
1x Engineering dev working on 12 tasks (132% load) thru 2023-06-18
....==================================|==========.......................................................
MFD Rework
- Vehicle Feature Team
8x Engineering devs working on 6 tasks (23% load) thru 2023-05-22
8x Engineering devs working on 6 tasks (23% load) thru 2023-05-22
======================..==============|==...=====...=========...........................................
~~~~~~~~~~~~~~~~~~~~~~................|.................................................................
Military Multi-Tool
(Scheduled work ending soon!)
- SQ42 UI Feature Team
1x Design dev working on 3 tasks (385% load) thru 2023-05-21
1x Design dev working on 3 tasks (385% load) thru 2023-05-21
....................................==|==...............................................................
Miscellaneous Support
- Actor Feature Team
3x Design devs working on 20 tasks (66% load) thru 2023-06-15
4x Animation devs working on 14 tasks (34% load) thru 2023-06-15
2x Engineering devs working on 14 tasks (67% load) thru 2023-06-15
3x Design devs working on 20 tasks (66% load) thru 2023-06-15
4x Animation devs working on 14 tasks (34% load) thru 2023-06-15
2x Engineering devs working on 14 tasks (67% load) thru 2023-06-15
====================~~~~~~~~==========|=========........................................................
====================~~~~~~~~==========|=========........................................................
====================~~~~~~~~==========|=========........................................................
- Actor Tech Team
5x Engineering devs working on 14 tasks (27% load) thru 2023-06-15
5x Engineering devs working on 14 tasks (27% load) thru 2023-06-15
====================~~~~~~~~==========|=========........................................................
- AI Content Team
2x Tech Content devs working on 23 tasks (36% load) thru 2023-07-02
4x Animation devs working on 23 tasks (53% load) thru 2023-07-02
2x Tech Content devs working on 23 tasks (36% load) thru 2023-07-02
4x Animation devs working on 23 tasks (53% load) thru 2023-07-02
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~...................................................
======================================|==============...................................................
- AI Tech and Feature Team
4x Engineering devs working on 4 tasks (62% load) thru 2023-06-04
4x Engineering devs working on 4 tasks (62% load) thru 2023-06-04
....................................==|======...........................................................
- Editor Team
4x Engineering devs working on 6 tasks (45% load) thru 2023-07-02
1x Design dev working on 19 tasks (119% load) thru 2023-07-02
4x Engineering devs working on 6 tasks (45% load) thru 2023-07-02
1x Design dev working on 19 tasks (119% load) thru 2023-07-02
=========...=====================...==|==============...................................................
======================================|==============...................................................
- Gameplay Story
1x Tech Content dev working on 8 tasks (80% load) thru 2023-07-03
1x Tech Content dev working on 8 tasks (80% load) thru 2023-07-03
~~~~~~~~~~~~~~~~~~~~~~~~~...~~~~~~~~~~|~~~~~~~~~~~~~~...................................................
- Graphics Team
2x Tech Content devs working on 5 tasks (63% load) thru 2023-06-05
5x Engineering devs working on 5 tasks (25% load) thru 2023-06-05
2x Tech Content devs working on 5 tasks (63% load) thru 2023-06-05
5x Engineering devs working on 5 tasks (25% load) thru 2023-06-05
===================.....==============|======...........................................................
===================.....==============|======...........................................................
- Mission Feature Team
9x Design devs working on 7 tasks (24% load) thru 2023-05-22
6x Engineering devs working on 9 tasks (27% load) thru 2023-06-29
9x Design devs working on 7 tasks (24% load) thru 2023-05-22
6x Engineering devs working on 9 tasks (27% load) thru 2023-06-29
........................==============|==.........................======................................
........................==============|=============..............======................................
- Narrative
2x Design devs working on 8 tasks (82% load) thru 2023-06-22
2x Design devs working on 8 tasks (82% load) thru 2023-06-22
=========================.============|===========......................................................
- Systemic Services and Tools Team
4x Engineering devs working on 11 tasks (67% load) thru 2023-06-05
4x Engineering devs working on 11 tasks (67% load) thru 2023-06-05
=====================...==============|======.....................======................................
- US PU Gameplay Feature Team
2x Art devs working on 19 tasks (184% load) thru 2023-05-22
2x Art devs working on 19 tasks (184% load) thru 2023-05-22
............................~~~~~~~~~~|~~...........=================...................................
- Weapon Feature Team
5x Design devs working on 46 tasks (79% load) thru 2023-06-29
5x Design devs working on 46 tasks (79% load) thru 2023-06-29
==============================.=======|=============....................................................
- UI Tech Team
4x Engineering devs will work on 7 tasks (71% load) starting 2023-05-22 thru 2023-07-02
4x Engineering devs will work on 7 tasks (71% load) starting 2023-05-22 thru 2023-07-02
................=========.............|.=============...................................................
Mission Manager App
- Mission Feature Team
1x Art dev working on 7 tasks (63% load) thru 2023-06-29
1x Engineering dev working on 7 tasks (127% load) thru 2023-06-29
1x Art dev working on 7 tasks (63% load) thru 2023-06-29
1x Engineering dev working on 7 tasks (127% load) thru 2023-06-29
........................~~~~~~~~~~~~~~|~~~~~~~~~~~~~....................................................
........................==============|=============....................................................
- US PU Gameplay Feature Team
2x Art devs working on 5 tasks (53% load) thru 2023-05-18
2x Art devs working on 5 tasks (53% load) thru 2023-05-18
............................~~~~~~~~~~|~............=============.......................................
mobiGlas Rework
- SQ42 Feature Team
2x Engineering devs working on 4 tasks (81% load) thru 2023-06-18
2x Engineering devs working on 4 tasks (81% load) thru 2023-06-18
=====.......=========...=====.......==|==========.......................................................
New Interdiction Scenarios
- EU Sandbox 1
1x Design dev working on 2 tasks (222% load) thru 2023-05-30
1x Design dev working on 2 tasks (222% load) thru 2023-05-30
=============.........................|====...~~~~~~........=====...=====...............................
New Missions - Data Heist
- Mission Feature Team
1x Design dev working on 5 tasks (154% load) thru 2023-05-22
1x Design dev working on 5 tasks (154% load) thru 2023-05-22
........................==============|==...========....................................................
- Narrative
1x Design dev working on 8 tasks (165% load) thru 2023-06-22
1x Design dev working on 8 tasks (165% load) thru 2023-06-22
..........................============|===========......................................................
New Missions - Mining Resource Rush
- Mission Feature Team
1x Design dev working on 7 tasks (127% load) thru 2023-06-29
1x Design dev working on 7 tasks (127% load) thru 2023-06-29
....==============......==============|=============....................................................
New Missions - Package Extraction
- Mission Feature Team
1x Design dev working on 5 tasks (154% load) thru 2023-05-22
1x Design dev working on 5 tasks (154% load) thru 2023-05-22
........................==============|==...............................................................
- Narrative
1x Design dev working on 8 tasks (165% load) thru 2023-06-22
1x Design dev working on 8 tasks (165% load) thru 2023-06-22
..........................============|===========......................................................
New Missions - Retreive Consignment
- Mission Feature Team
1x Design dev working on 6 tasks (109% load) thru 2023-06-29
1x Design dev working on 6 tasks (109% load) thru 2023-06-29
........................==============|=============....................................................
New Missions - Salvage Contracts
- Mission Feature Team
1x Design dev working on 6 tasks (109% load) thru 2023-06-29
1x Design dev working on 6 tasks (109% load) thru 2023-06-29
........................==============|=============....................................................
........................=====.........|.................................................................
Outpost Homestead - Independent & Outlaw
- EU Sandbox 1
12x Art devs working on 14 tasks (26% load) thru 2023-05-30
4x Design devs working on 10 tasks (55% load) thru 2023-05-30
12x Art devs working on 14 tasks (26% load) thru 2023-05-30
4x Design devs working on 10 tasks (55% load) thru 2023-05-30
==================..==========.=======|====...~~~~~~=============...=====...............................
==================..==========.=======|====...~~~~~~=============...=====...............................
Persistent Habs
(Scheduled work ending soon!)
- US PU Gameplay Feature Team
3x Design devs working on 3 tasks (76% load) thru 2023-05-18
3x Design devs working on 3 tasks (76% load) thru 2023-05-18
............============............~~|~................................................................
Persistent Hangars
- US PU Gameplay Feature Team
4x Engineering devs working on 21 tasks (102% load) thru 2023-05-22
4x Engineering devs working on 21 tasks (102% load) thru 2023-05-22
............................~~~~~~~~~~|~~...............................................................
========================....========..|.................................................................
Persistent Streaming and Server Meshing
- Engine Team
1x Engineering dev working on 5 tasks (126% load) thru 2023-05-18
1x Engineering dev working on 5 tasks (126% load) thru 2023-05-18
=================.......~~~~==========|=................................................................
- Game Services Team
10x Engineering devs working on 45 tasks (18% load) thru 2023-07-02
10x Engineering devs working on 45 tasks (18% load) thru 2023-07-02
======================================|==============...................................................
- Network Team
9x Engineering devs working on 25 tasks (13% load) thru 2023-06-15
9x Engineering devs working on 25 tasks (13% load) thru 2023-06-15
====================~~~~~~~~==========|=========........................................................
- Persistent Tech Team
4x Engineering devs working on 29 tasks (34% load) thru 2023-06-15
4x Engineering devs working on 29 tasks (34% load) thru 2023-06-15
====================~~~~~~~~==========|=========........................................................
Physical Damage & Breakability
- Physics Team
3x Engineering devs working on 8 tasks (67% load) thru 2023-06-05
3x Engineering devs working on 8 tasks (67% load) thru 2023-06-05
===================.....==============|======...........................................................
Physics - Ropes Simulation
- Physics Team
1x Engineering dev working on 5 tasks (126% load) thru 2023-06-05
1x Engineering dev working on 5 tasks (126% load) thru 2023-06-05
===================.....==============|======...........................................................
Player Interaction Experience T2 - Visor HUD & Helmet
- Graphics Team
1x Engineering dev working on 5 tasks (126% load) thru 2023-06-05
1x Engineering dev working on 5 tasks (126% load) thru 2023-06-05
........................==============|======...........................................................
- SQ42 UI Feature Team
3x Design devs working on 11 tasks (63% load) thru 2023-07-02
3x Design devs working on 11 tasks (63% load) thru 2023-07-02
........=====...........==============|==============...................................................
........................=========.....|.................................................................
- UI Tech Team
1x Engineering dev working on 2 tasks (256% load) thru 2023-05-21
1x Engineering dev working on 2 tasks (256% load) thru 2023-05-21
............=====...................==|==...............................................................
Pyro Space Stations
- EU Landing Zone 1
3x Design devs working on 9 tasks (94% load) thru 2023-05-21
14x Art devs working on 27 tasks (61% load) thru 2023-05-21
3x Design devs working on 9 tasks (94% load) thru 2023-05-21
14x Art devs working on 27 tasks (61% load) thru 2023-05-21
=============...........==============|==.......=================.......................................
=============...........==============|==.......=================.......................................
Pyro System, Planet, and Mission Setup
- US PU Gameplay Feature Team
3x Design devs working on 8 tasks (134% load) thru 2023-05-22
3x Design devs working on 8 tasks (134% load) thru 2023-05-22
................................====~~|~~...........=================...................................
- Mission Feature Team
1x Design dev will work on 3 tasks (135% load) starting 2023-05-23 thru 2023-06-29
1x Design dev will work on 3 tasks (135% load) starting 2023-05-23 thru 2023-06-29
......................................|.============....................................................
Quantum Simulation
- Systemic Services and Tools Team
6x Engineering devs working on 32 tasks (54% load) thru 2023-06-19
6x Engineering devs working on 32 tasks (54% load) thru 2023-06-19
======================================|==========.==========================............................
RaStar
(Scheduled work ending soon!)
- Planet Tech Team
4x Engineering devs working on 10 tasks (62% load) thru 2023-06-01
4x Engineering devs working on 10 tasks (62% load) thru 2023-06-01
=====================...==============|=====............................................................
Rough and Ready Faction Outfits
(Recently started!)
- SC Character Art
1x Art dev working on 5 tasks (214% load) thru 2023-06-15
1x Art dev working on 5 tasks (214% load) thru 2023-06-15
....................................==|=========........................................................
RSI Polaris
- Vehicle Content - EU
7x Art devs working on 38 tasks (122% load) thru 2023-06-15
7x Art devs working on 38 tasks (122% load) thru 2023-06-15
..........................============|=========....======================..............................
Ship Trespass
- Mission Feature Team
1x Engineering dev working on 6 tasks (109% load) thru 2023-06-29
1x Engineering dev working on 6 tasks (109% load) thru 2023-06-29
........................==============|=============....................................................
Sliding
- Actor Feature Team
1x Engineering dev working on 8 tasks (134% load) thru 2023-06-15
2x Animation devs working on 5 tasks (107% load) thru 2023-06-15
1x Engineering dev working on 8 tasks (134% load) thru 2023-06-15
2x Animation devs working on 5 tasks (107% load) thru 2023-06-15
........................==============|=========........................................................
........................~~~~........==|=========........................................................
SQ42 - Vehicle Support
- Audio
6x Audio devs working on 10 tasks (51% load) thru 2023-07-05
6x Audio devs working on 10 tasks (51% load) thru 2023-07-05
============================........==|===============..................................................
- Graphics Team
1x Engineering dev working on 5 tasks (126% load) thru 2023-06-05
1x Engineering dev working on 5 tasks (126% load) thru 2023-06-05
........................==============|======...........................................................
- SQ42 Art
4x Art devs working on 19 tasks (30% load) thru 2023-06-21
4x Art devs working on 19 tasks (30% load) thru 2023-06-21
======================================|===========......................................................
- SQ42 UI Feature Team
2x Art devs working on 7 tasks (70% load) thru 2023-07-02
2x Art devs working on 7 tasks (70% load) thru 2023-07-02
............................==========|==============...................................................
- Vehicle Content - EU
5x Art devs working on 13 tasks (59% load) thru 2023-06-15
4x Design devs working on 19 tasks (107% load) thru 2023-06-15
5x Art devs working on 13 tasks (59% load) thru 2023-06-15
4x Design devs working on 19 tasks (107% load) thru 2023-06-15
..........................============|=========....======================..............................
======================....============|=========....======================..............................
- Vehicle Content - US
3x Tech Content devs working on 11 tasks (75% load) thru 2023-06-23
3x Tech Content devs working on 11 tasks (75% load) thru 2023-06-23
==============............============|===========......................................................
======================................|.................................................................
- Vehicle Feature Team
7x Engineering devs working on 11 tasks (32% load) thru 2023-06-19
7x Engineering devs working on 11 tasks (32% load) thru 2023-06-19
======================..==============|==========...=========================...........................
- AI Tech and Feature Team
1x Engineering dev will work on 4 tasks (163% load) starting 2023-05-22 thru 2023-07-02
1x Engineering dev will work on 4 tasks (163% load) starting 2023-05-22 thru 2023-07-02
......................................|.=============...................................................
StarWords Improvements
- Tools Team
2x Engineering devs working on 21 tasks (66% load) thru 2023-07-02
2x Engineering devs working on 21 tasks (66% load) thru 2023-07-02
======================================|==============...................................................
Subsumption Editor Integration
- AI Tech and Feature Team
1x Engineering dev working on 8 tasks (137% load) thru 2023-07-02
1x Engineering dev working on 8 tasks (137% load) thru 2023-07-02
=====================...==============|==============...................................................
Swimming T0
- Actor Feature Team
1x Engineering dev working on 8 tasks (165% load) thru 2023-06-15
1x Engineering dev working on 8 tasks (165% load) thru 2023-06-15
............................========..|.................................................................
........................==============|=========........................................................
- Actor Tech Team
1x Engineering dev working on 8 tasks (134% load) thru 2023-06-15
1x Engineering dev working on 8 tasks (134% load) thru 2023-06-15
........................==============|=========........................................................
TestRunner Improvements
- Tools Team
3x Engineering devs working on 15 tasks (46% load) thru 2023-07-02
3x Engineering devs working on 15 tasks (46% load) thru 2023-07-02
======================================|==============...................................................
Unannounced Vehicle
- Vehicle Content - MTL
2x Art devs working on 11 tasks (90% load) thru 2023-06-15
2x Art devs working on 11 tasks (90% load) thru 2023-06-15
..........................~~====~~~~~~|~~~~~~~~~....~~~~~~..............................................
Unannounced Vehicle
- Vehicle Content - MTL
2x Art devs working on 8 tasks (145% load) thru 2023-06-15
2x Art devs working on 8 tasks (145% load) thru 2023-06-15
..................................====|=========....==========..........................................
Unannounced Vehicle
(Scheduled work ending soon!)
- VFX Team
2x Art devs working on 3 tasks (192% load) thru 2023-05-24
2x Art devs working on 3 tasks (192% load) thru 2023-05-24
........==========..................==|===..............................................................
Unannounced Vehicle
- Vehicle Concept Art
2x Art devs working on 10 tasks (181% load) thru 2023-05-18
2x Art devs working on 10 tasks (181% load) thru 2023-05-18
==============............============|=................................................................
- Vehicle Content - US
1x Design dev working on 9 tasks (185% load) thru 2023-06-23
3x Art devs working on 13 tasks (89% load) thru 2023-06-23
1x Design dev working on 9 tasks (185% load) thru 2023-06-23
3x Art devs working on 13 tasks (89% load) thru 2023-06-23
..........................============|===========..=====...............................................
======================....============|===========..=====...............................................
......................................|.................=====...........................................
Unannounced Vehicle
- Vehicle Content - EU
2x Design devs working on 17 tasks (191% load) thru 2023-06-15
5x Art devs working on 31 tasks (140% load) thru 2023-06-15
2x Design devs working on 17 tasks (191% load) thru 2023-06-15
5x Art devs working on 31 tasks (140% load) thru 2023-06-15
................======....============|=========........................................................
................======....============|=========....======================..............................
Unannounced Vehicle
(Scheduled work ending soon!)
- Vehicle Concept Art
1x Art dev working on 15 tasks (543% load) thru 2023-05-18
1x Art dev working on 15 tasks (543% load) thru 2023-05-18
==============............============|=................................................................
Unannounced Vehicle
(Scheduled work ending soon!)
- Vehicle Concept Art
1x Art dev working on 11 tasks (1667% load) thru 2023-05-18
1x Art dev working on 11 tasks (1667% load) thru 2023-05-18
..........====......................==|=................................................................
Underground Facilities
- Location Concept Art
5x Art devs working on 21 tasks (40% load) thru 2023-06-15
5x Art devs working on 21 tasks (40% load) thru 2023-06-15
====================~~~~~~~~==========|=========........................................................
- MTL Sandbox 1
4x Art devs working on 35 tasks (82% load) thru 2023-06-29
1x Design dev working on 17 tasks (156% load) thru 2023-06-29
4x Art devs working on 35 tasks (82% load) thru 2023-06-29
1x Design dev working on 17 tasks (156% load) thru 2023-06-29
==============================.=======|=======~~~~~~....................................................
==============================.=======|=======~~~~~~....................................................
Weapon Misfire & Wear
- Weapon Feature Team
3x Engineering devs working on 19 tasks (60% load) thru 2023-06-29
3x Engineering devs working on 19 tasks (60% load) thru 2023-06-29
==============================.=======|=============....................................................
The following deliverables are scheduled to begin (or continue) work within two weeks
Chapter 28
(Scheduled work ending soon!)
- Character Tech Art
1x Tech Content dev will work on 3 tasks (455% load) starting 2023-05-21 thru 2023-06-01
1x Tech Content dev will work on 3 tasks (455% load) starting 2023-05-21 thru 2023-06-01
......................................|.====............................................................
Disarray Ammunition
(Starting soon!)
- Weapon Feature Team
1x Engineering dev will work on 14 tasks (402% load) starting 2023-05-31 thru 2023-06-29
1x Engineering dev will work on 14 tasks (402% load) starting 2023-05-31 thru 2023-06-29
......................................|...~~~~~~~~~~....................................................
Greycat Industrial Salvage Tool
- SQ42 UI Feature Team
1x Design dev will work on 3 tasks (385% load) starting 2023-05-22 thru 2023-06-04
1x Design dev will work on 3 tasks (385% load) starting 2023-05-22 thru 2023-06-04
......................................|.=====...........................................................
Incendiary Ammunition
(Starting soon!)
- Weapon Feature Team
1x Engineering dev will work on 14 tasks (402% load) starting 2023-05-31 thru 2023-06-29
1x Engineering dev will work on 14 tasks (402% load) starting 2023-05-31 thru 2023-06-29
......................................|...~~~~~~~~~~....................................................
Plasma Ammunition
(Starting soon!)
- Weapon Feature Team
1x Engineering dev will work on 14 tasks (402% load) starting 2023-05-31 thru 2023-06-29
1x Engineering dev will work on 14 tasks (402% load) starting 2023-05-31 thru 2023-06-29
......................................|...~~~~~~~~~~....................................................
Refinery Ships
- EU PU Gameplay Feature Team
2x Engineering devs will work on 4 tasks (123% load) starting 2023-05-23 thru 2023-06-19
2x Engineering devs will work on 4 tasks (123% load) starting 2023-05-23 thru 2023-06-19
............................=====.....|.=========...=========================...........................
Resource Management
- EU PU Gameplay Feature Team
3x Engineering devs will work on 4 tasks (82% load) starting 2023-05-23 thru 2023-06-19
3x Design devs will work on 4 tasks (72% load) starting 2023-05-23 thru 2023-06-19
3x Engineering devs will work on 4 tasks (82% load) starting 2023-05-23 thru 2023-06-19
3x Design devs will work on 4 tasks (72% load) starting 2023-05-23 thru 2023-06-19
=====...........=====================.|.=========...=================...=====...........................
=========...............~~~~~~~~~.....|.====~~~~~...~~~~~~~~~~~~~.......................................