Scheduled Deliverables

as of 2023-04-19

There are currently 69 scheduled deliverables being worked on by 34 teams

6 deliverables are scheduled to begin work by 5 team(s) within two weeks


This report lists the actively assigned deliverables and the associated teams, along with the number of developers assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.

The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.

The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.


extra analysis (click me)


There are approximately 332 devs (out of ~512, or 65%) with 696 assignments scheduled to work on 69 observable deliverables. Of those deliverables, 25% are for SQ42 exclusively, with ~205 devs (40%) scheduled for approximately 1754 man-days. 29% of deliverables are shared between both projects.

5 deliverable(s) are not currently scheduled to continue work after this sprint: Below are the time breakdowns for each team:

Actor Status T2

  • Actor Feature Team
    2x Engineering devs working on 6 tasks (57% load) thru 2023-06-15

........................======|=================........................................................

Additional Derelict Settlements

  • MTL Sandbox 1
    3x Art devs working on 23 tasks (71% load) thru 2023-06-29
    2x Design devs working on 19 tasks (88% load) thru 2023-06-29

==============================|===============~~~~~~....................................................
==============================|===============~~~~~~....................................................

Aerodynamic Control Surfaces

  • Vehicle Feature Team
    1x Engineering dev working on 6 tasks (250% load) thru 2023-05-08

======......==========..======|======...................................................................

Aopoa San'tok.yāi

  • Vehicle Content - US
    1x Design dev working on 6 tasks (123% load) thru 2023-06-23
    1x Art dev working on 6 tasks (123% load) thru 2023-06-23

======================....====|===================..=====================...............................
======================....====|===================......=================...............................

Asteroid Facilities

  • EU Sandbox 1
    3x Art devs working on 15 tasks (110% load) thru 2023-05-30

........==========..==========|============...======....................................................

ATC Service

  • Systemic Services and Tools Team
    2x Engineering devs working on 7 tasks (146% load) thru 2023-05-08

........................======|======.............==============........................................

Bounty Hunter V2

  • EU Landing Zone 2
    3x Art devs working on 14 tasks (43% load) thru 2023-07-02

==============================|======================...................................................

  • Mission Feature Team
    3x Engineering devs working on 7 tasks (42% load) thru 2023-06-29

....=================...======|=====================....................................................
....=================.........|.........============....................................................

  • Narrative
    2x Design devs working on 5 tasks (31% load) thru 2023-06-22

........~~~~~~~~~.............|~~~~~~~~~~~~~~~~~~~......................................................

  • Vehicle Content - EU
    2x Art devs working on 6 tasks (128% load) thru 2023-05-11

..........................====|=======..................................................................

Bug Fixing & Tech Debt

  • Actor Feature Team
    1x Engineering dev working on 6 tasks (113% load) thru 2023-06-15

........................======|=================........................................................
..............................|.....============........................................................

  • AI Tech and Feature Team
    11x Engineering devs working on 6 tasks (11% load) thru 2023-05-07

............==================|======.......=========...................................................

  • US PU Gameplay Feature Team
    5x Design devs working on 14 tasks (35% load) thru 2023-06-19

========================....~~|~~~~~~~~~~~~~~~~~~...=========================...........................
....................====......|.....~~~~~~~~~~~~~...............=============...........................

  • EU PU Gameplay Feature Team
    6x Engineering devs will work on 4 tasks (27% load) starting 2023-04-25 thru 2023-06-05
    3x Design devs will work on 3 tasks (41% load) starting 2023-04-25 thru 2023-06-05

=========================.....|.=============...........................................................
....=====================.....|.=============...................=============...........................

Building Interiors

  • MTL Sandbox 1
    15x Art devs working on 31 tasks (20% load) thru 2023-09-10
    7x Design devs working on 21 tasks (19% load) thru 2023-09-10

........................======|===============~~~~~~=====================...............................
==============================|===============~~~~~~=====================...............................

Cave Archetypes

(Scheduled work ending soon!)

  • VFX Team
    3x Art devs working on 2 tasks (41% load) thru 2023-04-26

....=====...............======|===......................................................................

Chapter 04

  • AI Content Team
    7x Design devs working on 14 tasks (16% load) thru 2023-07-02

==============================|=========~~~~=========...................................................

  • AI Tech and Feature Team
    3x Engineering devs working on 3 tasks (41% load) thru 2023-05-07

........................======|======...................................................................

  • SQ42 Character Art
    4x Art devs working on 12 tasks (29% load) thru 2023-06-15

============~~~~==============|=================........................................................

  • SQ42 UI Feature Team
    1x Art dev working on 6 tasks (103% load) thru 2023-07-02

........................======|======================...................................................

  • Gameplay Story
    5x Animation devs will work on 7 tasks (17% load) starting 2023-04-25 thru 2023-07-03

..............................|.~~~~~~~~~~~~~~~~~~~~~...................................................

Chapter 05

  • AI Content Team
    2x Design devs working on 1 task (64% load) thru 2023-04-23

................=====.......==|==.......=====...........................................................

  • Gameplay Story
    5x Animation devs working on 3 tasks (38% load) thru 2023-04-24

....................~~~~~...~~|~~.......................................................................

  • SQ42 Character Art
    5x Art devs working on 13 tasks (28% load) thru 2023-06-01

============~~~~==============|=====~~~~====............................................................

  • VFX Team
    1x Art dev will work on 1 task (128% load) starting 2023-04-27 thru 2023-05-10

..............................|.======..................................................................

Chapter 07

  • Vehicle Feature Team
    2x Engineering devs working on 2 tasks (64% load) thru 2023-04-24

........................======|==...=====...............................................................

  • VFX Team
    1x Art dev working on 1 task (128% load) thru 2023-04-26

............................==|===......................................................................

Chapter 11

  • AI Content Team
    1x Design dev working on 3 tasks (81% load) thru 2023-05-21

............................~~|~====~~~~~...............................................................

  • SQ42 Character Art
    1x Art dev will work on 1 task (152% load) starting 2023-04-23 thru 2023-05-04

..............................|.====....................................................................

Chapter 12

  • Facial Animation
    6x Animation devs working on 2 tasks (17% load) thru 2023-04-20

=============...........~~~~==|=........................................................................

  • Gameplay Story
    5x Animation devs working on 3 tasks (38% load) thru 2023-04-24

............~~~~~~~~~~~~~...~~|~~...~~~~~~~~~~~~~.......................................................

  • Vehicle Feature Team
    2x Engineering devs working on 6 tasks (61% load) thru 2023-06-19

==========..............======|==================.......................................................

  • VFX Team
    1x Art dev working on 2 tasks (123% load) thru 2023-04-26

........................======|===......................................................................

  • SQ42 Character Art
    5x Art devs will work on 4 tasks (22% load) starting 2023-04-23 thru 2023-06-15

................~~~~====......|.====~~~~========........................................................

Chapter 14

  • VFX Team
    2x Art devs working on 3 tasks (61% load) thru 2023-05-24

............................==|===========..............................................................

Chapter 17

  • SQ42 Character Art
    3x Art devs working on 6 tasks (34% load) thru 2023-04-20

........====~~~~==============|=........................................................................

  • Character Tech Art
    1x Tech Content dev will work on 1 task (152% load) starting 2023-04-23 thru 2023-05-04

..............................|.====....................................................................

  • Narrative
    1x Design dev will work on 3 tasks (64% load) starting 2023-04-30 thru 2023-06-08

..............................|...~~~~~~~~~~~~..........................................................

  • Vehicle Feature Team
    2x Engineering devs will work on 4 tasks (61% load) starting 2023-04-25 thru 2023-06-19

............~~~~====~~~~~~~~~.|.=================...=====...............................................

  • VFX Team
    1x Art dev will work on 2 tasks (123% load) starting 2023-04-27 thru 2023-05-24

..............................|.==========..............................................................

Chapter 18

  • Vehicle Feature Team
    1x Engineering dev working on 2 tasks (123% load) thru 2023-05-08

............................==|======...................................................................

Chapter 20

  • Narrative
    1x Design dev working on 2 tasks (133% load) thru 2023-04-27

~~~~~~~~~.................====|===......................................................................

Chapter 21

  • AI Content Team
    7x Design devs working on 7 tasks (12% load) thru 2023-05-07

........~~~~============~~~~~~|~~~~~~...~~~~=========...................................................

  • Gameplay Story
    4x Animation devs working on 4 tasks (31% load) thru 2023-05-08

................~~~~~~~~~...~~|~~~~~~...................................................................

  • SQ42 Character Art
    1x Art dev will work on 4 tasks (126% load) starting 2023-04-23 thru 2023-06-15

..............................|.================........................................................

  • VFX Team
    1x Art dev will work on 2 tasks (123% load) starting 2023-04-27 thru 2023-05-24

..............................|.==========..............................................................

Chapter 22

  • Narrative
    2x Design devs working on 2 tasks (50% load) thru 2023-04-27

....~~~~~~~~=====.........~~~~|~~~......................................................................

  • SQ42 UI Feature Team
    1x Art dev working on 1 task (128% load) thru 2023-04-23

............................==|==.......................................................................

Chapter 27

  • Vehicle Feature Team
    1x Engineering dev working on 4 tasks (121% load) thru 2023-06-05

............................==|==============...........................................................

  • Gameplay Story
    4x Animation devs will work on 7 tasks (21% load) starting 2023-04-25 thru 2023-07-03

..............................|.~~~~~~~~~~~~~~~~~~~~~...................................................

Character Work

  • AI Tech and Feature Team
    3x Animation devs working on 13 tasks (40% load) thru 2023-07-02
    7x Engineering devs working on 16 tasks (21% load) thru 2023-07-02
    1x Design dev working on 18 tasks (56% load) thru 2023-07-02

==============================|======================...................................................
==============================|======================...................................................
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~~~~~~...................................................

  • Character Tech Art
    7x Tech Content devs working on 2 tasks (19% load) thru 2023-04-20

........................======|=....============........................................................

  • Cinematics Team
    2x Design devs working on 5 tasks (76% load) thru 2023-05-25
    4x Animation devs working on 7 tasks (53% load) thru 2023-05-25

==================......======|===========..............................................................
==================......======|===========..............................................................

  • Facial Animation
    9x Animation devs working on 24 tasks (16% load) thru 2023-06-15

====================~~~~~~~~==|=================........................................................

  • Motion Capture Team
    9x Animation devs working on 27 tasks (15% load) thru 2023-07-04

==============================|======================...................................................

  • SC Character Art
    1x Art dev working on 6 tasks (123% load) thru 2023-06-15

........................======|=================........................................................

  • Tech Animation Team
    12x Tech Content devs working on 18 tasks (13% load) thru 2023-07-05

==============================|=======================..................................................

Chemline

  • Actor Tech Team
    1x Engineering dev working on 6 tasks (113% load) thru 2023-06-15

........................======|=================........................................................

Crusader Spirit

  • Vehicle Content - EU
    5x Art devs working on 48 tasks (97% load) thru 2023-06-15

==============================|=================........................................................
======..====..................|.........................................................................

Cutting T2

  • Graphics Team
    1x Engineering dev working on 3 tasks (76% load) thru 2023-06-05

........................======|=======.======...........................................................

  • Weapon Feature Team
    1x Engineering dev working on 12 tasks (114% load) thru 2023-06-29

==============================|=====================....................................................

Duster Faction Outfits

  • Character Tech Art
    3x Tech Content devs working on 3 tasks (43% load) thru 2023-05-04

........................======|=====....====............................................................

  • SC Character Art
    6x Art devs working on 15 tasks (25% load) thru 2023-06-15

==============================|=================........................................................

Enemy Characters

  • SQ42 Character Art
    4x Art devs working on 5 tasks (35% load) thru 2023-05-18

........................======|=~~~~====................................................................

  • Character Tech Art
    2x Tech Content devs will work on 3 tasks (100% load) starting 2023-04-23 thru 2023-05-18

..............................|.========................................................................

Fire Hazard

  • Graphics Team
    3x Engineering devs working on 3 tasks (25% load) thru 2023-06-05

........................======|=======.======...........................................................

  • VFX Team
    3x Engineering devs working on 4 tasks (40% load) thru 2023-05-24

==================......======|===========..............................................................
=========.....................|.........................................................................

FPS Devices T1

(Scheduled work ending soon!)

  • VFX Team
    1x Art dev working on 1 task (128% load) thru 2023-04-26

............................==|===......................................................................

Freight Elevators

  • US PU Gameplay Feature Team
    3x Engineering devs working on 7 tasks (58% load) thru 2023-06-05
    3x Design devs working on 2 tasks (101% load) thru 2023-04-20
    1x Art dev working on 2 tasks (133% load) thru 2023-05-04

====================........==|=====~~~~=====.......=====================...............................
............................==|=........................................................................
........============........==|=====................=========...........................................

Frontier Clothing

  • Character Tech Art
    5x Tech Content devs working on 5 tasks (25% load) thru 2023-05-18

================....==========|=========....====........................................................

Gen12 - Renderer T1

  • Engine Team
    4x Engineering devs working on 7 tasks (39% load) thru 2023-05-18

=================.......~~~~==|=========................................................................

  • Graphics Team
    9x Engineering devs working on 4 tasks (11% load) thru 2023-06-05

===================.....======|=======.======...........................................................

Hacking T0

  • Graphics Team
    1x Engineering dev working on 3 tasks (76% load) thru 2023-06-05

........................======|=======.======...........................................................

Headhunters Faction Outfits

  • SC Character Art
    2x Art devs working on 7 tasks (72% load) thru 2023-06-15

........................======|=================........................................................

Map and Radar System Rework

(Scheduled work ending soon!)

  • SQ42 UI Feature Team
    2x Design devs working on 1 task (64% load) thru 2023-04-23

=============================.|.........................................................................
....=====...........=====...==|==.......................................................................

MFD Rework

  • Vehicle Feature Team
    8x Engineering devs working on 4 tasks (15% load) thru 2023-05-22

======================..======|==========...=====...=========...........................................
~~~~~~~~~~~~~~~~~~~~~~........|.........................................................................

  • SQ42 UI Feature Team
    1x Design dev will work on 1 task (128% load) starting 2023-04-24 thru 2023-05-07

..............................|.=====...................................................................

Miscellaneous Support

  • Actor Feature Team
    3x Design devs working on 14 tasks (45% load) thru 2023-06-15
    4x Animation devs working on 12 tasks (28% load) thru 2023-06-15
    2x Engineering devs working on 12 tasks (57% load) thru 2023-06-15

====================~~~~~~~~==|=================........................................................
====================~~~~~~~~==|=================........................................................
====================~~~~~~~~==|=================........................................................

  • Actor Tech Team
    5x Engineering devs working on 12 tasks (23% load) thru 2023-06-15

====================~~~~~~~~==|=================........................................................

  • AI Content Team
    2x Tech Content devs working on 19 tasks (30% load) thru 2023-07-02
    4x Animation devs working on 15 tasks (34% load) thru 2023-07-02

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~~~~~~...................................................
==============================|======================...................................................

  • Gameplay Story
    1x Tech Content dev working on 6 tasks (60% load) thru 2023-07-03

~~~~~~~~~~~~~~~~~~~~~~~~~...~~|~~~~~~~~~~~~~~~~~~~~~~...................................................

  • Graphics Team
    2x Tech Content devs working on 3 tasks (38% load) thru 2023-06-05
    5x Engineering devs working on 3 tasks (15% load) thru 2023-06-05

===================.....======|=======.======...........................................................
===================.....======|=======.======...........................................................

  • Mission Feature Team
    9x Design devs working on 5 tasks (17% load) thru 2023-05-22
    6x Engineering devs working on 7 tasks (21% load) thru 2023-06-29

........................======|==========.........................======................................
........................======|=====================..............======................................

  • Narrative
    2x Design devs working on 6 tasks (62% load) thru 2023-06-22

=========================.====|===================......................................................

  • Systemic Services and Tools Team
    4x Engineering devs working on 9 tasks (55% load) thru 2023-06-05

=====================...======|==============.....................======................................

  • US PU Gameplay Feature Team
    2x Art devs working on 19 tasks (184% load) thru 2023-05-22

............................~~|~~~~~~~~~~...........=================...................................

  • Weapon Feature Team
    5x Design devs working on 36 tasks (63% load) thru 2023-06-29

==============================|=====================....................................................

Mission Manager App

  • Mission Feature Team
    1x Art dev working on 6 tasks (54% load) thru 2023-06-29
    1x Engineering dev working on 6 tasks (109% load) thru 2023-06-29

........................~~~~~~|~~~~~~~~~~~~~~~~~~~~~....................................................
........................======|=====================....................................................

  • US PU Gameplay Feature Team
    2x Art devs working on 3 tasks (32% load) thru 2023-05-18

............................~~|~~~~~~~~~............=============.......................................

mobiGlas Rework

  • SQ42 UI Feature Team
    1x Art dev working on 1 task (128% load) thru 2023-04-23
    2x Design devs working on 1 task (64% load) thru 2023-04-23

............................==|==...........=========...................................................
............................==|==...........=========...................................................

Mop & Bucket

(Scheduled work ending soon!)

  • Actor Feature Team
    1x Engineering dev working on 3 tasks (107% load) thru 2023-05-04

........................======|=====....................................................................

New Missions - Data Download

  • Mission Feature Team
    1x Design dev working on 4 tasks (123% load) thru 2023-05-22

........................======|==========...========....................................................

  • Narrative
    1x Design dev working on 6 tasks (123% load) thru 2023-06-22

..........................====|===================......................................................

  • VFX Team
    1x Art dev will work on 1 task (128% load) starting 2023-04-27 thru 2023-05-10

..............................|.======..................................................................

New Missions - Mining Resource Rush

  • Mission Feature Team
    1x Design dev working on 6 tasks (109% load) thru 2023-06-29

....==============......======|=====================....................................................

New Missions - Package Extraction

  • Mission Feature Team
    1x Design dev working on 4 tasks (123% load) thru 2023-05-22

........................======|==========...............................................................

  • Narrative
    1x Design dev working on 6 tasks (123% load) thru 2023-06-22

..........................====|===================......................................................

Outpost Homestead - Independent & Outlaw

  • EU Sandbox 1
    12x Art devs working on 49 tasks (90% load) thru 2023-05-30
    4x Design devs working on 31 tasks (170% load) thru 2023-05-30

==================..==========|============...======....................................................
==================..==========|============...======....................................................

Persistent Hangars

  • US PU Gameplay Feature Team
    4x Engineering devs working on 21 tasks (102% load) thru 2023-05-22
    3x Design devs working on 2 tasks (44% load) thru 2023-05-04

............................~~|~~~~~~~~~~...............................................................
========================....==|=====....................................................................

Persistent Streaming and Server Meshing

  • Engine Team
    1x Engineering dev working on 4 tasks (110% load) thru 2023-05-18

=================.......======|=========................................................................

  • Network Team
    9x Engineering devs working on 24 tasks (12% load) thru 2023-06-15

====================~~~~~~~~==|=================........................................................

  • Persistent Tech Team
    4x Engineering devs working on 26 tasks (30% load) thru 2023-06-15

====================~~~~~~~~==|=================........................................................

Physical Damage & Breakability

  • Physics Team
    3x Engineering devs working on 4 tasks (34% load) thru 2023-06-05

===================.....======|=======.======...........................................................

Physics - Ropes Simulation

  • Physics Team
    1x Engineering dev working on 3 tasks (76% load) thru 2023-06-05

===================.....======|=======.======...........................................................

Player Interaction Experience T2 - Visor HUD & Helmet

  • Graphics Team
    1x Engineering dev working on 3 tasks (76% load) thru 2023-06-05

........................======|=======.======...........................................................

  • SQ42 UI Feature Team
    2x Art devs working on 2 tasks (62% load) thru 2023-04-23
    3x Design devs working on 7 tasks (40% load) thru 2023-07-02

........................======|==.......................................................................
........=====...........======|======================...................................................

Pyro Space Stations

  • EU Landing Zone 1
    3x Design devs working on 5 tasks (52% load) thru 2023-05-21
    14x Art devs working on 11 tasks (25% load) thru 2023-05-21

=============...........======|==========.......=================.......................................
=============...........======|==========.......=================.......................................

Quantum Simulation

  • Systemic Services and Tools Team
    6x Engineering devs working on 26 tasks (44% load) thru 2023-06-19

==============================|==================.==========================............................

Refinery Ships

  • EU PU Gameplay Feature Team
    2x Engineering devs working on 1 task (64% load) thru 2023-04-24
    2x Design devs working on 3 tasks (64% load) thru 2023-04-24

............................==|==.......=========...=========================...........................
........................~~~~~~|~~...................~~~~~~~~~~~~~.......................................

Resource Management

  • EU PU Gameplay Feature Team
    3x Engineering devs working on 5 tasks (41% load) thru 2023-05-08
    3x Design devs working on 2 tasks (21% load) thru 2023-04-24

=====...........==============|======...=========...=================...=====...........................
=========...............~~~~~~|~~.......====~~~~~...~~~~~~~~~~~~~.......................................

  • Vehicle Feature Team
    4x Engineering devs working on 5 tasks (77% load) thru 2023-05-08

............................==|======...................................................................

RSI Lynx

  • Audio
    1x Audio dev working on 4 tasks (247% load) thru 2023-05-10

..................============|=======..................................................................

RSI Polaris

  • Vehicle Content - EU
    7x Art devs working on 30 tasks (97% load) thru 2023-06-15

..........................====|=================....======================..............................

Salvage - Vehicle Munching

  • EU PU Gameplay Feature Team
    1x Engineering dev working on 2 tasks (128% load) thru 2023-04-24

........................======|==...........=====...=================...=====...........................
........................~~~~~.|.............~~~~~...~~~~~~~~~~~~~.......................................

Seated Item Handling

(Scheduled work ending soon!)

  • Actor Feature Team
    2x Animation devs working on 9 tasks (60% load) thru 2023-05-04

====================~~~~~~~~==|=====....................................................................

Sliding

  • Actor Feature Team
    1x Engineering dev working on 6 tasks (113% load) thru 2023-06-15

........................======|=================........................................................
........................~~~~..|.....============........................................................

SQ42 - Vehicle Support

  • Graphics Team
    1x Engineering dev working on 3 tasks (76% load) thru 2023-06-05

........................======|=======.======...........................................................

  • SQ42 UI Feature Team
    2x Art devs working on 5 tasks (50% load) thru 2023-07-02

............................==|======================...................................................

  • Vehicle Content - EU
    4x Design devs working on 13 tasks (73% load) thru 2023-06-15
    5x Art devs working on 11 tasks (50% load) thru 2023-06-15

======================....====|=================....======================..............................
..........................====|=================....======================..............................

  • Vehicle Content - US
    3x Tech Content devs working on 7 tasks (48% load) thru 2023-06-23

==============............====|===================......................................................

  • Vehicle Feature Team
    7x Engineering devs working on 7 tasks (20% load) thru 2023-06-19

======================..======|==================...=========================...........................

Subsumption Editor Integration

  • AI Tech and Feature Team
    1x Engineering dev working on 6 tasks (103% load) thru 2023-07-02

=====================...======|======================...................................................

Swimming T0

  • Actor Feature Team
    1x Engineering dev working on 6 tasks (123% load) thru 2023-06-15
    1x Animation dev working on 2 tasks (133% load) thru 2023-05-04

........................======|=================........................................................
............................==|=====....................................................................

  • Actor Tech Team
    1x Engineering dev working on 6 tasks (113% load) thru 2023-06-15

........................======|=================........................................................

Unannounced Vehicle

  • Audio
    2x Audio devs working on 5 tasks (154% load) thru 2023-05-10

..................============|=======..................................................................

  • Vehicle Concept Art
    1x Art dev working on 4 tasks (267% load) thru 2023-04-27

========..................====|===......................................................................

Unannounced Vehicle

  • Vehicle Concept Art
    2x Art devs working on 8 tasks (145% load) thru 2023-05-18

==============............====|=========................................................................

  • Vehicle Content - US
    1x Design dev working on 7 tasks (144% load) thru 2023-06-23
    3x Art devs working on 9 tasks (62% load) thru 2023-06-23

..........................====|===================..=====...............................................
======================....====|===================..=====...............................................
..............................|.........................=====...........................................

Unannounced Vehicle

  • Vehicle Content - EU
    2x Design devs working on 15 tasks (169% load) thru 2023-06-15
    5x Art devs working on 25 tasks (113% load) thru 2023-06-15

................======....====|=================........................................................
................======....====|=================....======================..............................

Unannounced Vehicle

  • Vehicle Concept Art
    1x Art dev working on 13 tasks (471% load) thru 2023-05-18

==============............====|=========................................................................

Underground Facilities

  • MTL Sandbox 1
    4x Art devs working on 27 tasks (63% load) thru 2023-06-29
    1x Design dev working on 15 tasks (137% load) thru 2023-06-29

==============================|===============~~~~~~....................................................
==============================|===============~~~~~~....................................................

Vehicle Tractor Beams

  • EU PU Gameplay Feature Team
    2x Engineering devs working on 7 tasks (61% load) thru 2023-04-24

....==========================|==...........=====.......................................................
........==========............|.........................................................................

Weapon Misfire & Wear

  • Weapon Feature Team
    3x Engineering devs working on 17 tasks (54% load) thru 2023-06-29

==============================|=====================....................................................


The following deliverables are scheduled to begin (or continue) work within two weeks

Chapter 01

  • Vehicle Feature Team
    1x Design dev will work on 7 tasks (212% load) starting 2023-04-25 thru 2023-06-19

..............................|.=================.......................................................

Chapter 02

  • SQ42 Character Art
    3x Art devs will work on 1 task (25% load) starting 2023-04-23 thru 2023-05-04

................~~~~====......|.~~~~........====........................................................

Derelict Spaceships - Points of Interest

  • VFX Team
    2x Art devs will work on 2 tasks (62% load) starting 2023-04-27 thru 2023-05-24

..............................|.==========..............................................................

Distortion Propagation

  • Weapon Feature Team
    1x Engineering dev will work on 7 tasks (194% load) starting 2023-04-30 thru 2023-06-29

..............................|...==================....................................................

Flak Ammunition

  • Weapon Feature Team
    1x Engineering dev will work on 10 tasks (556% load) starting 2023-04-30 thru 2023-05-30

..............................|...=========.............................................................

Pyro System, Planet, and Mission Setup

  • US PU Gameplay Feature Team
    3x Design devs will work on 4 tasks (57% load) starting 2023-04-23 thru 2023-05-22

..............................|.~~~~~~~~~...........=================...................................