ShinyTracker

RSI "Progress Tracker" Delta Reports

by ShinyHobo RSS

Scheduled Deliverables

as of 2023-03-22

There are currently 60 scheduled deliverables being worked on by 40 teams

17 deliverables are scheduled to begin work by 10 team(s) within two weeks


This report lists the actively assigned deliverables and the associated teams, along with the number of developers assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.

The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.

The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.


extra analysis (click me)


There are approximately 314 devs (out of ~512, or 61%) with 647 assignments scheduled to work on 60 observable deliverables. Of those deliverables, 35% are for SQ42 exclusively, with ~272 devs (53%) scheduled for approximately 1668 man-days. 25% of deliverables are shared between both projects.

32 deliverable(s) are not currently scheduled to continue work after this sprint: Below are the time breakdowns for each team:

Additional Derelict Settlements

  • MTL Sandbox 1
    3x Art devs working on 17 tasks (52% load) thru 2023-06-29
    2x Design devs working on 15 tasks (69% load) thru 2023-06-29

======================|=======.===============~~~~~~....................................................
======================|=======.===============~~~~~~....................................................

Asteroid Facilities

  • EU Sandbox 1
    3x Art devs working on 13 tasks (95% load) thru 2023-05-30

........==========..==|=======.============...======....................................................

Bounty Hunter V2

  • EU Landing Zone 2
    3x Art devs working on 16 tasks (50% load) thru 2023-07-02

======================|==============================...................................................

  • Mission Feature Team
    3x Design devs working on 9 tasks (60% load) thru 2023-03-28

======================|==...............................................................................
==================....|.................................................................................

  • Vehicle Content - EU
    2x Art devs will work on 7 tasks (150% load) starting 2023-04-02 thru 2023-05-11

......................|...============..................................................................

Bug Fixing & Tech Debt

  • AI Tech and Feature Team
    11x Engineering devs working on 4 tasks (15% load) thru 2023-03-26

............==========|==...............................................................................

  • Engine Team
    5x Engineering devs working on 16 tasks (198% load) thru 2023-03-26

................======|==...............................................................................

  • EU Landing Zone 1
    5x Design devs working on 6 tasks (49% load) thru 2023-03-28
    15x Art devs working on 18 tasks (49% load) thru 2023-03-28

=...........==========|==...............=========...............=========...............................
=...........==========|==...............=========...............=========...............................

  • Graphics Team
    13x Engineering devs working on 33 tasks (212% load) thru 2023-03-26
    3x Tech Content devs working on 3 tasks (83% load) thru 2023-03-26

..................====|==...............................................................................
..................====|==...............................................................................

  • Live Tools Team
    5x Engineering devs working on 8 tasks (32% load) thru 2023-03-26

======================|==...............................................................................

  • Mission Feature Team
    3x Design devs working on 8 tasks (54% load) thru 2023-03-28

======================|==...............................................................................

  • Physics Team
    4x Engineering devs working on 9 tasks (188% load) thru 2023-03-26

..................====|==...............................................................................

  • Systemic Services and Tools Team
    6x Engineering devs working on 15 tasks (321% load) thru 2023-03-28

....................==|==...................=====.............==============............................

  • US PU Gameplay Feature Team
    5x Design devs working on 8 tasks (33% load) thru 2023-03-23
    4x Art devs working on 6 tasks (227% load) thru 2023-03-23
    5x Engineering devs working on 9 tasks (273% load) thru 2023-03-23

======================|=....~~~~~~~~~~~~~~~~~~~~~...=========================...........................
....................==|=................~~~~~~~~~...................=========...........................
....................==|=................~~~~~~~~~...................=========...........................

  • Actor Feature Team
    1x Engineering dev will work on 8 tasks (148% load) starting 2023-03-31 thru 2023-06-29

......................|.======.=====================....................................................

Building Interiors

  • MTL Sandbox 1
    7x Design devs working on 19 tasks (17% load) thru 2023-09-10
    15x Art devs will work on 21 tasks (14% load) starting 2023-03-31 thru 2023-09-10

......................|.======.===============~~~~~~=====================...............................
======================|=======.===============~~~~~~=====================...............................

Chapter 01

  • AI Content Team
    5x Design devs working on 2 tasks (51% load) thru 2023-03-26

....=====...........==|==...............................................................................

  • Audio
    4x Audio devs working on 16 tasks (74% load) thru 2023-04-05

======================|=====............................................................................

  • Character Tech Art
    6x Tech Content devs working on 2 tasks (51% load) thru 2023-03-23

========............==|=................................................................................

  • SQ42 Feature Team
    1x Engineering dev working on 2 tasks (256% load) thru 2023-03-28

....=====...........==|==...............................................................................

  • SQ42 UI Feature Team
    3x Art devs working on 5 tasks (51% load) thru 2023-03-26

........==============|==...............................................................................

Chapter 02

(Scheduled work ending soon!)

  • SQ42 Character Art
    2x Art devs working on 3 tasks (67% load) thru 2023-03-23

................~~~~==|=................................................................................

  • SQ42 Level Design 3 - Social
    2x Design devs working on 3 tasks (96% load) thru 2023-03-28

................======|==...............................................................................

Chapter 04

(Scheduled work ending soon!)

  • AI Content Team
    6x Design devs working on 11 tasks (36% load) thru 2023-03-26

======================|==...............................................................................

  • SQ42 Art
    6x Art devs working on 4 tasks (27% load) thru 2023-03-26

............==========|==...............................................................................

  • SQ42 Character Art
    4x Art devs working on 7 tasks (36% load) thru 2023-03-23

============~~~~======|=................................................................................

  • SQ42 Level Design 1 - FPS
    1x Design dev working on 2 tasks (256% load) thru 2023-03-28

....................==|==...............................................................................

Chapter 05

  • Gameplay Story
    5x Animation devs working on 6 tasks (77% load) thru 2023-03-27

....................~~|~~...............................................................................

  • SQ42 Character Art
    5x Art devs working on 11 tasks (45% load) thru 2023-03-23

============~~~~======|=................................................................................

  • Vehicle Feature Team
    2x Engineering devs working on 6 tasks (63% load) thru 2023-04-10

........============~~|~~~~~~...........................................................................

Chapter 07

  • SQ42 Level Design 2 - Flight
    4x Design devs working on 9 tasks (40% load) thru 2023-03-28

======================|==...............................................................................

  • Vehicle Feature Team
    2x Engineering devs will work on 3 tasks (96% load) starting 2023-03-29 thru 2023-04-24

......................|.=========...=====...............................................................

Chapter 11

(Scheduled work ending soon!)

  • SQ42 Level Design 2 - Flight
    3x Design devs working on 6 tasks (44% load) thru 2023-03-28

....====~~~~==========|==...............................................................................

Chapter 12

  • Audio
    3x Audio devs working on 18 tasks (111% load) thru 2023-04-05

======================|=====............................................................................

  • Gameplay Story
    5x Animation devs working on 8 tasks (33% load) thru 2023-03-27

............~~~~~~~~~~|~~...............................................................................

  • SQ42 Character Art
    3x Art devs working on 3 tasks (44% load) thru 2023-03-23

................~~~~==|=................................................................................

  • SQ42 Level Design 1 - FPS
    5x Design devs working on 7 tasks (42% load) thru 2023-03-28

........==============|==...............................................................................

  • Vehicle Feature Team
    2x Engineering devs will work on 7 tasks (71% load) starting 2023-03-29 thru 2023-06-19

==========............|.=========================.......................................................

Chapter 14

  • Audio
    1x Audio dev working on 11 tasks (266% load) thru 2023-04-05

......================|=====............................................................................

  • SQ42 Art
    14x Art devs working on 37 tasks (17% load) thru 2023-03-26

======================|==...............................................................................
........=============.|.................................................................................

  • SQ42 Character Art
    4x Art devs working on 7 tasks (28% load) thru 2023-03-23

~~~~~~~~~~~~~~~~======|=................................................................................

  • SQ42 Level Design 1 - FPS
    8x Design devs working on 7 tasks (18% load) thru 2023-03-28

======================|==...............................................................................

  • Vehicle Feature Team
    2x Design devs working on 7 tasks (69% load) thru 2023-03-30

======================|===..............................................................................
......................|.............=============...=====...............................................

Chapter 15

(Scheduled work ending soon!)

  • SQ42 Level Design 3 - Social
    3x Design devs working on 7 tasks (47% load) thru 2023-03-28

======================|==...............................................................................

Chapter 16

(Scheduled work ending soon!)

  • SQ42 Level Design 2 - Flight
    3x Design devs working on 5 tasks (40% load) thru 2023-03-28

........~~~~==========|==...............................................................................

Chapter 17

  • SQ42 Art
    9x Art devs working on 19 tasks (13% load) thru 2023-03-26

======================|==...............................................................................

  • SQ42 Character Art
    3x Art devs working on 5 tasks (37% load) thru 2023-03-23

........~~~~~~~~======|=................................................................................

  • SQ42 Level Design 1 - FPS
    2x Design devs working on 7 tasks (70% load) thru 2023-03-28

======================|==...............................................................................

  • SQ42 Level Design 2 - Flight
    4x Design devs working on 7 tasks (33% load) thru 2023-03-28

====================~~|~~...............................................................................

  • Vehicle Feature Team
    2x Engineering devs working on 5 tasks (64% load) thru 2023-04-10

............~~~~====~~|~~~~~~...=================.......................................................

Chapter 18

  • SQ42 Art
    7x Art devs working on 19 tasks (25% load) thru 2023-03-26

======================|==...............................................................................

  • SQ42 UI Feature Team
    1x Art dev working on 2 tasks (256% load) thru 2023-03-26

....................==|==...............................................................................

Chapter 19

(Scheduled work ending soon!)

  • Narrative
    1x Design dev working on 2 tasks (256% load) thru 2023-03-26

....................==|==...............................................................................

  • SQ42 Character Art
    1x Art dev working on 4 tasks (171% load) thru 2023-03-23

............==========|=................................................................................

  • SQ42 Level Design 3 - Social
    1x Design dev working on 3 tasks (192% load) thru 2023-03-28

................======|==...............................................................................

Chapter 20

(Scheduled work ending soon!)

  • SQ42 Art
    6x Art devs working on 8 tasks (32% load) thru 2023-03-26

....==================|==...............................................................................

  • SQ42 Level Design 1 - FPS
    6x Design devs working on 5 tasks (53% load) thru 2023-03-28

................======|==...............................................................................

Chapter 21

  • AI Content Team
    5x Design devs working on 5 tasks (24% load) thru 2023-03-26

........~~~~==========|==...............................................................................

  • Gameplay Story
    4x Animation devs working on 7 tasks (54% load) thru 2023-03-27

................~~~~~~|~~...............................................................................

  • SQ42 Art
    3x Art devs working on 4 tasks (27% load) thru 2023-03-26

............~~~~~~~~~~|~~...............................................................................

  • SQ42 Level Design 2 - Flight
    1x Design dev working on 2 tasks (256% load) thru 2023-03-28

....................==|==...............................................................................

Chapter 22

(Scheduled work ending soon!)

  • AI Content Team
    2x Design devs working on 2 tasks (128% load) thru 2023-03-26

=============.......==|==...............................................................................

  • Gameplay Story
    4x Animation devs working on 11 tasks (27% load) thru 2023-03-27

~~~~~~~~~~~~~~~~~~~~~~|~~...............................................................................

  • SQ42 Level Design 1 - FPS
    10x Design devs working on 13 tasks (26% load) thru 2023-03-28

======================|==...............................................................................

  • SQ42 Level Design 2 - Flight
    2x Design devs working on 5 tasks (53% load) thru 2023-03-28

........~~~~========~~|~~...............................................................................

  • SQ42 Level Design 3 - Social
    1x Design dev working on 2 tasks (256% load) thru 2023-03-28

....................==|==...............................................................................

  • Tech Animation Team
    1x Tech Content dev working on 3 tasks (192% load) thru 2023-03-28

................======|==...............................................................................

Chapter 23

(Scheduled work ending soon!)

  • SQ42 Art
    3x Art devs working on 4 tasks (27% load) thru 2023-03-26

............~~~~~~~~~~|~~...............................................................................

Chapter 24

(Scheduled work ending soon!)

  • SQ42 Level Design 1 - FPS
    1x Design dev working on 3 tasks (192% load) thru 2023-03-28

................======|==...............................................................................

  • SQ42 Level Design 2 - Flight
    2x Design devs working on 5 tasks (45% load) thru 2023-03-28

........~~~~~~~~~~~~==|==...............................................................................

Chapter 26

(Scheduled work ending soon!)

  • SQ42 Art
    10x Art devs working on 2 tasks (26% load) thru 2023-03-26

....................==|==...............................................................................

  • SQ42 Level Design 1 - FPS
    9x Design devs working on 7 tasks (16% load) thru 2023-03-28

======================|==...............................................................................

  • SQ42 Level Design 3 - Social
    1x Design dev working on 2 tasks (256% load) thru 2023-03-28

....................==|==...............................................................................

  • Tech Animation Team
    1x Tech Content dev working on 2 tasks (256% load) thru 2023-03-28

....................==|==...............................................................................

Character Work

(Scheduled work ending soon!)

  • AI Tech and Feature Team
    7x Engineering devs working on 15 tasks (43% load) thru 2023-03-26
    1x Design dev working on 13 tasks (64% load) thru 2023-03-26
    3x Animation devs working on 9 tasks (60% load) thru 2023-03-26

======================|==...............................................................................
~~~~~~~~~~~~~~~~~~~~~~|~~...............................................................................
======================|==...............................................................................

  • Facial Animation
    9x Animation devs working on 25 tasks (26% load) thru 2023-03-26

======================|==...............................................................................

  • Motion Capture Team
    9x Animation devs working on 28 tasks (22% load) thru 2023-03-26

======================|==...............................................................................

Crusader Spirit

  • Vehicle Content - EU
    5x Art devs working on 38 tasks (77% load) thru 2023-06-15

======================|=========================........................................................
======..====..........|.................................................................................

Cutting T2

  • Weapon Feature Team
    1x Engineering dev working on 15 tasks (143% load) thru 2023-06-29

======================|=======.=====================....................................................

Duster Faction Outfits

(Scheduled work ending soon!)

  • SC Character Art
    4x Art devs working on 17 tasks (87% load) thru 2023-03-23

======================|=................................................................................

Dynamic Events

(Scheduled work ending soon!)

  • Mission Feature Team
    9x Design devs working on 11 tasks (25% load) thru 2023-03-28
    4x Engineering devs working on 8 tasks (40% load) thru 2023-03-28

======================|==...............................................................................
======================|==...............................................................................

Entity Properties Plugin

(Scheduled work ending soon!)

  • Editor Team
    1x Engineering dev working on 5 tasks (203% load) thru 2023-03-26

=========...==========|==...............................................................................

Freight Elevators

(Scheduled work ending soon!)

  • EU Landing Zone 2
    1x Art dev working on 4 tasks (163% load) thru 2023-03-28

............==========|==...............................................................................

Frontier Clothing

(Scheduled work ending soon!)

  • Character Tech Art
    5x Tech Content devs working on 3 tasks (91% load) thru 2023-03-23

================....==|=................................................................................

  • SC Character Art
    16x Art devs working on 29 tasks (18% load) thru 2023-03-23

======================|=................................................................................

Hacking T0

(Scheduled work ending soon!)

  • SQ42 UI Feature Team
    1x Design dev working on 3 tasks (385% load) thru 2023-03-26

....=========.......==|==...............................................................................
....=====.............|.................................................................................

HEX

(Scheduled work ending soon!)

  • Live Tools Team
    5x Engineering devs working on 11 tasks (44% load) thru 2023-03-26

======================|==...............................................................................

Lockable Containers

  • EU PU Gameplay Feature Team
    2x Design devs working on 14 tasks (55% load) thru 2023-06-19
    1x Engineering dev will work on 8 tasks (163% load) starting 2023-03-29 thru 2023-06-19

~~~~==================|=~~~~~~~~~~~~~~~~~~~~~~~~~...~~~~~~~~~~~~~~~~~~~~~~~~~...........................
......................|.=========================...=========================...........................

Lorville Cityscape

(Scheduled work ending soon!)

  • MTL Sandbox 1
    5x Art devs working on 10 tasks (40% load) thru 2023-03-28
    1x Design dev working on 6 tasks (120% load) thru 2023-03-28

======================|==...............................................................................
======================|==...............................................................................

  • Narrative
    2x Design devs working on 2 tasks (46% load) thru 2023-03-26

=========.......~~~~==|==...............................................................................

Map and Radar System Rework

(Scheduled work ending soon!)

  • SQ42 Feature Team
    1x Engineering dev working on 6 tasks (145% load) thru 2023-03-28

....==================|==...............................................................................

  • SQ42 UI Feature Team
    3x Art devs working on 9 tasks (60% load) thru 2023-03-26
    1x Design dev working on 2 tasks (256% load) thru 2023-03-26

======================|==...............................................................................
....=====...........==|==...............................................................................

  • Vehicle Feature Team
    2x Engineering devs working on 9 tasks (89% load) thru 2023-03-30

======================|===..............................................................................

Miscellaneous Support

  • Actor Feature Team
    3x Design devs working on 20 tasks (63% load) thru 2023-06-29
    4x Animation devs working on 14 tasks (33% load) thru 2023-06-29
    2x Engineering devs working on 14 tasks (67% load) thru 2023-06-29

======================|=======.=====================....................................................
======================|=======.=====================....................................................
======================|=======.=====================....................................................

  • AI Content Team
    2x Tech Content devs working on 17 tasks (57% load) thru 2023-03-26
    4x Animation devs working on 17 tasks (84% load) thru 2023-03-26

======================|==...............................................................................
======================|==...............................................................................

  • Editor Team
    4x Engineering devs working on 8 tasks (81% load) thru 2023-03-26
    1x Design dev working on 14 tasks (139% load) thru 2023-03-26

=========...==========|==...............................................................................
======================|==...............................................................................

  • Gameplay Story
    1x Tech Content dev working on 7 tasks (89% load) thru 2023-03-27

~~~~~~~~~~~~~~~~======|==...............................................................................

  • Narrative
    2x Design devs working on 13 tasks (61% load) thru 2023-03-26

======================|==...............................................................................

  • UI Tech Team
    4x Engineering devs working on 10 tasks (154% load) thru 2023-03-26

................======|==...............................................................................

  • Weapon Feature Team
    5x Design devs working on 26 tasks (48% load) thru 2023-06-29

======================|=======.=====================....................................................

  • Systemic Services and Tools Team
    4x Engineering devs will work on 7 tasks (43% load) starting 2023-03-29 thru 2023-06-05

=====================.|.=====================.....................======................................

New Player Experience

(Scheduled work ending soon!)

  • Narrative
    1x Design dev working on 2 tasks (123% load) thru 2023-03-26

................======|==...............................................................................

Outpost Homestead - Independent & Outlaw

  • EU Sandbox 1
    12x Art devs working on 39 tasks (71% load) thru 2023-05-30
    4x Design devs working on 25 tasks (137% load) thru 2023-05-30

==================..==|=======.============...======....................................................
==================..==|=======.============...======....................................................

Persistent Hangars

  • US PU Gameplay Feature Team
    2x Design devs working on 7 tasks (72% load) thru 2023-03-23

......................|.....~~~~~~~~~~~~~...............................................................
======================|=................................................................................

Persistent Streaming and Server Meshing

  • Game Services Team
    10x Engineering devs working on 47 tasks (26% load) thru 2023-03-26

======================|==...............................................................................

  • Mission Feature Team
    3x Engineering devs working on 20 tasks (43% load) thru 2023-09-20

======================|=====================================================............................

  • Network Team
    9x Engineering devs working on 20 tasks (14% load) thru 2023-03-26

======================|==...............................................................................

  • Persistent Tech Team
    4x Engineering devs working on 26 tasks (41% load) thru 2023-03-26

======================|==...............................................................................

Physicalized Weapon Handling

(Scheduled work ending soon!)

  • Weapon Feature Team
    1x Engineering dev working on 6 tasks (244% load) thru 2023-03-30

............==========|===..............................................................................

Player Interaction Experience T0 - Hints & Interactions

(Scheduled work ending soon!)

  • SQ42 UI Feature Team
    1x Design dev working on 3 tasks (385% load) thru 2023-03-26

=====.................|.................................................................................
....................==|==...............................................................................

Player Interaction Experience T2 - Visor HUD & Helmet

(Scheduled work ending soon!)

  • Actor Feature Team
    2x Engineering devs working on 8 tasks (97% load) thru 2023-03-30

....==================|===..............................................................................

Player/Machine Physical Interaction

(Scheduled work ending soon!)

  • Actor Feature Team
    1x Engineering dev working on 12 tasks (238% load) thru 2023-03-30

======================|===..............................................................................
==========............|.................................................................................

Prone T1

(Scheduled work ending soon!)

  • Actor Feature Team
    1x Engineering dev working on 10 tasks (198% load) thru 2023-03-30
    1x Animation dev working on 14 tasks (278% load) thru 2023-03-30

======================|===..............................................................................
======================|===..............................................................................

Pyro System, Planet, and Mission Setup

(Scheduled work ending soon!)

  • EU Sandbox 1
    1x Art dev working on 2 tasks (256% load) thru 2023-03-28

............======..==|==...............................................................................

Quantum Simulation

  • Systemic Services and Tools Team
    6x Engineering devs working on 20 tasks (33% load) thru 2023-06-19

======================|==========================.==========================............................

Resource Management

  • EU PU Gameplay Feature Team
    3x Design devs working on 9 tasks (26% load) thru 2023-06-19
    2x Engineering devs working on 12 tasks (72% load) thru 2023-05-22

~~~~~~~~~~~~~~~~~~..~~|~~~~~~~~~~~~~~~~~~~~~~~~~~...~~~~~~~~~~~~~~~~~~~~~~~~~...........................
======================|==================...=====...=========================...........................

RSI Lynx

(Scheduled work ending soon!)

  • Audio
    1x Audio dev working on 4 tasks (247% load) thru 2023-04-05

..................====|=====............................................................................

  • Vehicle Content - EU
    3x Art devs working on 15 tasks (95% load) thru 2023-03-30

======================|===..............................................................................
==========............|.................................................................................

Salvage - Vehicle Munching

(Scheduled work ending soon!)

  • EU PU Gameplay Feature Team
    1x Engineering dev working on 1 task (128% load) thru 2023-03-28

....==============..==|==...............................................................................

Seated Item Handling

  • Actor Feature Team
    2x Animation devs working on 9 tasks (58% load) thru 2023-05-14

======================|=======.========.................................................................

SQ42 - Vehicle Support

  • Audio
    5x Audio devs working on 16 tasks (59% load) thru 2023-04-05

======================|=====............................................................................

  • SQ42 Art
    4x Art devs working on 13 tasks (30% load) thru 2023-03-26

======================|==...............................................................................

  • Weapon Content Team
    5x Art devs working on 13 tasks (52% load) thru 2023-04-05

..====================|=====............................................................................

  • Vehicle Content - EU
    4x Design devs will work on 16 tasks (90% load) starting 2023-04-02 thru 2023-06-15
    5x Art devs will work on 12 tasks (54% load) starting 2023-04-02 thru 2023-06-15

======================|...======================....======================..............................
......................|...======================....======================..............................

  • Vehicle Content - US
    3x Tech Content devs will work on 9 tasks (58% load) starting 2023-04-03 thru 2023-06-23

==============........|...====~~~~================......................................................

  • Vehicle Feature Team
    7x Engineering devs will work on 9 tasks (26% load) starting 2023-03-29 thru 2023-06-19

======================|.=========================...=========================...........................

StarWords Improvements

(Scheduled work ending soon!)

  • Tools Team
    2x Engineering devs working on 17 tasks (84% load) thru 2023-03-26

======================|==...............................................................................

TestRunner Improvements

(Scheduled work ending soon!)

  • Tools Team
    3x Engineering devs working on 11 tasks (73% load) thru 2023-03-26

======================|==...............................................................................

Unannounced Vehicle

  • Audio
    2x Audio devs working on 5 tasks (154% load) thru 2023-04-05

..................====|=====............................................................................

  • Vehicle Concept Art
    1x Art dev will work on 4 tasks (267% load) starting 2023-04-02 thru 2023-04-27

========..............|...========......................................................................

Underground Facilities

  • MTL Sandbox 1
    4x Art devs working on 19 tasks (44% load) thru 2023-06-29
    1x Design dev working on 13 tasks (118% load) thru 2023-06-29

======================|=======.===============~~~~~~....................................................
======================|=======.===============~~~~~~....................................................

  • EU Sandbox 2
    3x Design devs will work on 6 tasks (238% load) starting 2023-03-31 thru 2023-04-14
    4x Art devs will work on 8 tasks (238% load) starting 2023-03-31 thru 2023-04-14

=====.................|.======..................=====...................................................
=====.................|.======..................=====...................................................

Vehicle Tractor Beams

  • EU PU Gameplay Feature Team
    2x Engineering devs working on 12 tasks (60% load) thru 2023-06-19
    1x Design dev working on 5 tasks (72% load) thru 2023-03-28

======================|==========================.......................................................
....~~~~~~~~~~~~====~~|~~...............................................................................

  • Narrative
    1x Design dev working on 2 tasks (123% load) thru 2023-03-26

................======|==...............................................................................

Weapon Misfire & Wear

  • Weapon Feature Team
    3x Engineering devs working on 15 tasks (48% load) thru 2023-06-29

======================|=======.=====================....................................................

  • Weapon Content Team
    5x Art devs will work on 13 tasks (333% load) starting 2023-03-23 thru 2023-04-05

......................|=====............................................................................


The following deliverables are scheduled to begin (or continue) work within two weeks

Actor Status T2

(Starting soon!)

  • Actor Feature Team
    2x Engineering devs will work on 13 tasks (120% load) starting 2023-03-31 thru 2023-06-29

......................|.======.=====================....................................................

Aerodynamic Control Surfaces

  • Vehicle Feature Team
    1x Engineering dev will work on 4 tasks (167% load) starting 2023-03-29 thru 2023-05-08

======......==========|.=============...................................................................

Aopoa San'tok.yāi

  • Vehicle Content - US
    1x Art dev will work on 6 tasks (62% load) starting 2023-04-03 thru 2023-06-23
    1x Design dev will work on 7 tasks (82% load) starting 2023-04-03 thru 2023-06-23

======================|...~~~~~~~~~~~~~~~~~~~~~~~~......................................................
======================|...~~~~~~~~~~~~~~~~~~~~====......................................................

ATC Service

  • Systemic Services and Tools Team
    2x Engineering devs will work on 5 tasks (104% load) starting 2023-03-29 thru 2023-05-08

......................|.=============.............==============........................................

Cave Archetypes

  • EU Sandbox 2
    5x Art devs will work on 10 tasks (238% load) starting 2023-03-31 thru 2023-04-14
    1x Tech Content dev will work on 2 tasks (238% load) starting 2023-03-31 thru 2023-04-14

......................|.======..........................................................................
......................|.======..........................................................................

Life Support T0

  • EU PU Gameplay Feature Team
    1x Design dev will work on 6 tasks (93% load) starting 2023-03-29 thru 2023-05-22

~~~~~.................|.~~~~~~~~~~~~~~~~~...~~~~~.......................................................

MFD Rework

  • Vehicle Feature Team
    8x Engineering devs will work on 5 tasks (19% load) starting 2023-03-29 thru 2023-05-22

======================|.=================...=====.......................................................

Mop & Bucket

  • Actor Feature Team
    1x Engineering dev will work on 11 tasks (417% load) starting 2023-03-31 thru 2023-05-14

......................|.======.========.................................................................

New Missions - Salvage Contracts

(Starting soon!)

  • Mission Feature Team
    1x Design dev will work on 12 tasks (114% load) starting 2023-03-29 thru 2023-09-20

......................|.====================================================............................

Pyro Space Stations

  • EU Landing Zone 1
    14x Art devs will work on 19 tasks (43% load) starting 2023-03-29 thru 2023-05-21
    3x Design devs will work on 7 tasks (73% load) starting 2023-03-29 thru 2023-05-21

=============.........|.=================.......=================.......................................
=============.........|.=================.......=================.......................................

RSI Polaris

(Starting soon!)

  • Vehicle Content - EU
    7x Art devs will work on 22 tasks (71% load) starting 2023-04-02 thru 2023-06-15

......................|...======================....======================..............................

Security Network V1

  • Mission Feature Team
    3x Engineering devs will work on 17 tasks (54% load) starting 2023-03-29 thru 2023-09-20
    1x Design dev will work on 14 tasks (133% load) starting 2023-03-29 thru 2023-09-20

......................|.====================================================............................
......................|.====================================================............................

Sliding

(Starting soon!)

  • Actor Feature Team
    1x Engineering dev will work on 14 tasks (259% load) starting 2023-03-31 thru 2023-06-29
    2x Animation devs will work on 9 tasks (536% load) starting 2023-03-31 thru 2023-04-14

......................|.======.=====================....................................................
......................|.======........==============....................................................

Swimming T0

(Starting soon!)

  • Actor Feature Team
    1x Engineering dev will work on 14 tasks (259% load) starting 2023-03-31 thru 2023-06-29

......................|.======.=====================....................................................

Unannounced Vehicle

  • Vehicle Concept Art
    2x Art devs will work on 9 tasks (163% load) starting 2023-04-02 thru 2023-05-18

==============........|...==============................................................................

  • Vehicle Content - US
    3x Art devs will work on 20 tasks (79% load) starting 2023-04-03 thru 2023-06-23
    1x Design dev will work on 11 tasks (123% load) starting 2023-04-03 thru 2023-06-23

======================|...~~~~~~~~~~~~~~~~~~~~~~~~......................................................
......................|...~~~~~~~~~~~~~~~~~~~~====......................................................

Unannounced Vehicle

  • Vehicle Content - EU
    2x Design devs will work on 13 tasks (146% load) starting 2023-04-02 thru 2023-06-15
    5x Art devs will work on 19 tasks (86% load) starting 2023-04-02 thru 2023-06-15

................======|...======================........................................................
................======|...======================....======================..............................

Unannounced Vehicle

  • Vehicle Concept Art
    1x Art dev will work on 11 tasks (399% load) starting 2023-04-02 thru 2023-05-18

==============........|...==============................................................................