There are currently 70 scheduled deliverables being worked on by 39 teams
6 deliverables are scheduled to begin work by 4 team(s) within two weeks
This report lists the actively assigned deliverables and the associated teams, along with the number of developers assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.
The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.
The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.
extra analysis (click me)
There are approximately 350 devs (out of ~512, or 68%) with 730 assignments scheduled to work on 70 observable deliverables. Of those deliverables, 37% are for SQ42 exclusively, with ~306 devs (60%) scheduled for approximately 1311 man-days. 26% of deliverables are shared between both projects.
11 deliverable(s) are not currently scheduled to continue work after this sprint:
- AR and Map Marker System Rework
- Chapter 06
- Chapter 09
- Character Creator
- Duster Faction Outfits
- Frontier Clothing
- mobiGlas Rework
- Quantum Travel Experience
- Save/Load
- Subsumption Editor Integration
- Unannounced Vehicle
- Actor Feature Team
full-time with 92 task(s) scheduled, 50% of which are for SQ42 - AI Content Team
29% part-time with 42 task(s) scheduled, 75% of which are for SQ42 - AI Tech and Feature Team
31% part-time with 39 task(s) scheduled, 75% of which are for SQ42 - Audio
full-time with 53 task(s) scheduled, all of which are for SQ42 - Character Tech Art
full-time with 3 task(s) scheduled, all of which are for SQ42 - Editor Team
full-time with 23 task(s) scheduled, 50% of which are for SQ42 - Engine Team
full-time with 11 task(s) scheduled, 50% of which are for SQ42 - EU Landing Zone 1
full-time with 14 task(s) scheduled, 50% of which are for SQ42 - EU Landing Zone 2
full-time with 17 task(s) scheduled, all of which are for SC - EU PU Gameplay Feature Team
24% part-time with 41 task(s) scheduled, all of which are for SC - EU Sandbox 1
full-time with 20 task(s) scheduled, 50% of which are for SQ42 - Facial Animation
full-time with 18 task(s) scheduled, all of which are for SQ42 - Game Services Team
31% part-time with 39 task(s) scheduled, all of which are for SC - Gameplay Story
93% part-time with 30 task(s) scheduled, 83% of which are for SQ42 - Graphics Team
full-time with 24 task(s) scheduled, 50% of which are for SQ42 - Live Tools Team
full-time with 16 task(s) scheduled, 33% of which are for SQ42 - Mission Feature Team
full-time with 49 task(s) scheduled, 17% of which are for SQ42 - Motion Capture Team
10% part-time with 21 task(s) scheduled, all of which are for SQ42 - MTL Sandbox 1
7% part-time with 88 task(s) scheduled, all of which are for SC - Narrative
15% part-time with 20 task(s) scheduled, 17% of which are for SQ42 - Network Team
full-time with 19 task(s) scheduled, all of which are for SC - Persistent Tech Team
full-time with 23 task(s) scheduled, all of which are for SC - Physics Team
full-time with 6 task(s) scheduled, 50% of which are for SQ42 - SC Character Art
full-time with 36 task(s) scheduled, all of which are for SC - SQ42 Art
6% part-time with 94 task(s) scheduled, all of which are for SQ42 - SQ42 Character Art
30% part-time with 40 task(s) scheduled, all of which are for SQ42 - SQ42 Feature Team
full-time with 14 task(s) scheduled, 67% of which are for SQ42 - SQ42 Level Design 1 - FPS
full-time with 37 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 2 - Flight
37% part-time with 38 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 3 - Social
full-time with 13 task(s) scheduled, all of which are for SQ42 - SQ42 UI Feature Team
full-time with 19 task(s) scheduled, 60% of which are for SQ42 - Systemic Services and Tools Team
full-time with 23 task(s) scheduled, 33% of which are for SQ42 - Tech Animation Team
full-time with 2 task(s) scheduled, all of which are for SQ42 - Tools Team
full-time with 24 task(s) scheduled, 50% of which are for SQ42 - UI Tech Team
full-time with 7 task(s) scheduled, 50% of which are for SQ42 - US PU Gameplay Feature Team
full-time with 33 task(s) scheduled, 25% of which are for SQ42 - Vehicle Content - EU
full-time with 87 task(s) scheduled, 17% of which are for SQ42 - Vehicle Content - US
full-time with 36 task(s) scheduled, 20% of which are for SQ42 - Vehicle Feature Team
29% part-time with 49 task(s) scheduled, 57% of which are for SQ42 - Weapon Content Team
full-time with 12 task(s) scheduled, all of which are for SQ42 - Weapon Feature Team
4% part-time with 54 task(s) scheduled, 50% of which are for SQ42
Additional Derelict Settlements
- MTL Sandbox 1
3x Art devs working on 14 tasks (43% load) thru 2023-06-29
2x Design devs working on 13 tasks (59% load) thru 2023-06-29
3x Art devs working on 14 tasks (43% load) thru 2023-06-29
2x Design devs working on 13 tasks (59% load) thru 2023-06-29
==================|===========.===============~~~~~~....................................................
==================|===========.===============~~~~~~....................................................
Aerodynamic Control Surfaces
- Vehicle Feature Team
1x Engineering dev working on 2 tasks (123% load) thru 2023-03-16
1x Engineering dev working on 2 tasks (123% load) thru 2023-03-16
======......======|===..=============...................................................................
Aopoa San'tok.yāi
- Vehicle Content - US
1x Art dev working on 6 tasks (135% load) thru 2023-03-17
1x Design dev working on 6 tasks (135% load) thru 2023-03-17
1x Art dev working on 6 tasks (135% load) thru 2023-03-17
1x Design dev working on 6 tasks (135% load) thru 2023-03-17
==================|===....~~~~~~~~~~~~~~~~~~~~~~~~......................................................
==================|===....~~~~~~~~~~~~~~~~~~~~====......................................................
AR and Map Marker System Rework
(Scheduled work ending soon!)
- SQ42 UI Feature Team
1x Design dev working on 2 tasks (256% load) thru 2023-03-12
1x Design dev working on 2 tasks (256% load) thru 2023-03-12
................==|==...................................................................................
Bounty Hunter V2
- EU Landing Zone 2
3x Art devs working on 14 tasks (43% load) thru 2023-07-02
3x Art devs working on 14 tasks (43% load) thru 2023-07-02
==================|==================================...................................................
- Mission Feature Team
3x Design devs working on 7 tasks (47% load) thru 2023-03-28
3x Design devs working on 7 tasks (47% load) thru 2023-03-28
==================|======...............................................................................
==================|.....................................................................................
Bug Fixing & Tech Debt
- AI Tech and Feature Team
11x Engineering devs working on 3 tasks (11% load) thru 2023-03-26
11x Engineering devs working on 3 tasks (11% load) thru 2023-03-26
............======|======...............................................................................
- Engine Team
5x Engineering devs working on 11 tasks (136% load) thru 2023-03-26
5x Engineering devs working on 11 tasks (136% load) thru 2023-03-26
................==|======...............................................................................
- EU Landing Zone 1
5x Design devs working on 4 tasks (33% load) thru 2023-03-28
15x Art devs working on 10 tasks (27% load) thru 2023-03-28
5x Design devs working on 4 tasks (33% load) thru 2023-03-28
15x Art devs working on 10 tasks (27% load) thru 2023-03-28
=...........======|======...............=========...............=========...............................
=...........======|======...............=========...............=========...............................
- EU Sandbox 1
13x Art devs working on 14 tasks (150% load) thru 2023-03-14
6x Design devs working on 6 tasks (139% load) thru 2023-03-14
13x Art devs working on 14 tasks (150% load) thru 2023-03-14
6x Design devs working on 6 tasks (139% load) thru 2023-03-14
................==|==.....................======........................................................
................==|==.....................======........................................................
- Graphics Team
13x Engineering devs working on 22 tasks (141% load) thru 2023-03-26
3x Tech Content devs working on 2 tasks (56% load) thru 2023-03-26
13x Engineering devs working on 22 tasks (141% load) thru 2023-03-26
3x Tech Content devs working on 2 tasks (56% load) thru 2023-03-26
..................|======...............................................................................
..................|======...............................................................................
- Live Tools Team
5x Engineering devs working on 7 tasks (28% load) thru 2023-03-26
5x Engineering devs working on 7 tasks (28% load) thru 2023-03-26
==================|======...............................................................................
- Mission Feature Team
3x Design devs working on 7 tasks (47% load) thru 2023-03-28
3x Design devs working on 7 tasks (47% load) thru 2023-03-28
==================|======...............................................................................
- Physics Team
4x Engineering devs working on 6 tasks (125% load) thru 2023-03-26
4x Engineering devs working on 6 tasks (125% load) thru 2023-03-26
..................|======...............................................................................
- US PU Gameplay Feature Team
5x Design devs working on 7 tasks (29% load) thru 2023-03-23
4x Art devs will work on 4 tasks (152% load) starting 2023-03-12 thru 2023-03-23
5x Engineering devs will work on 6 tasks (182% load) starting 2023-03-12 thru 2023-03-23
5x Design devs working on 7 tasks (29% load) thru 2023-03-23
4x Art devs will work on 4 tasks (152% load) starting 2023-03-12 thru 2023-03-23
5x Engineering devs will work on 6 tasks (182% load) starting 2023-03-12 thru 2023-03-23
..................|.====................~~~~~~~~~...................=========...........................
==================|=====....~~~~~~~~~~~~~~~~~~~~~...=========================...........................
- Systemic Services and Tools Team
6x Engineering devs will work on 10 tasks (214% load) starting 2023-03-15 thru 2023-03-28
6x Engineering devs will work on 10 tasks (214% load) starting 2023-03-15 thru 2023-03-28
..................|.=====...................=====.............==============............................
Building Interiors
- MTL Sandbox 1
7x Design devs working on 18 tasks (16% load) thru 2023-09-10
7x Design devs working on 18 tasks (16% load) thru 2023-09-10
..................|.....======.===============~~~~~~=====================...............................
==================|===========.===============~~~~~~=====================...............................
Chapter 01
- SQ42 UI Feature Team
3x Art devs working on 4 tasks (40% load) thru 2023-03-26
3x Art devs working on 4 tasks (40% load) thru 2023-03-26
........==========|======...............................................................................
- AI Content Team
5x Design devs will work on 1 task (26% load) starting 2023-03-13 thru 2023-03-26
5x Design devs will work on 1 task (26% load) starting 2023-03-13 thru 2023-03-26
....=====.........|.=====...............................................................................
- Character Tech Art
6x Tech Content devs will work on 1 task (25% load) starting 2023-03-12 thru 2023-03-23
6x Tech Content devs will work on 1 task (25% load) starting 2023-03-12 thru 2023-03-23
========..........|.====................................................................................
- SQ42 Feature Team
1x Engineering dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
1x Engineering dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
....=====.........|.=====...............................................................................
Chapter 02
- SQ42 Character Art
2x Art devs working on 2 tasks (50% load) thru 2023-03-23
2x Art devs working on 2 tasks (50% load) thru 2023-03-23
................~~|~====................................................................................
- SQ42 Level Design 3 - Social
2x Design devs working on 2 tasks (64% load) thru 2023-03-28
2x Design devs working on 2 tasks (64% load) thru 2023-03-28
................==|======...............................................................................
Chapter 04
- AI Content Team
6x Design devs working on 8 tasks (25% load) thru 2023-03-26
6x Design devs working on 8 tasks (25% load) thru 2023-03-26
==================|======...............................................................................
- SQ42 Art
6x Art devs working on 3 tasks (20% load) thru 2023-03-26
6x Art devs working on 3 tasks (20% load) thru 2023-03-26
............======|======...............................................................................
- SQ42 Character Art
4x Art devs working on 6 tasks (31% load) thru 2023-03-23
4x Art devs working on 6 tasks (31% load) thru 2023-03-23
============~~~~==|=====................................................................................
- SQ42 Level Design 1 - FPS
1x Design dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
1x Design dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
..................|.=====...............................................................................
Chapter 05
- AI Content Team
1x Design dev working on 1 task (128% load) thru 2023-03-12
1x Design dev working on 1 task (128% load) thru 2023-03-12
................==|==...................................................................................
- Character Tech Art
4x Tech Content devs working on 3 tasks (32% load) thru 2023-03-09
4x Tech Content devs working on 3 tasks (32% load) thru 2023-03-09
........==========|=....................................................................................
- SQ42 Character Art
5x Art devs working on 8 tasks (33% load) thru 2023-03-23
5x Art devs working on 8 tasks (33% load) thru 2023-03-23
============~~~~==|=====................................................................................
- Vehicle Feature Team
2x Engineering devs working on 5 tasks (51% load) thru 2023-04-10
2x Engineering devs working on 5 tasks (51% load) thru 2023-04-10
........~~~~======|=~~~~~~~~~...........................................................................
- Gameplay Story
5x Animation devs will work on 3 tasks (38% load) starting 2023-03-14 thru 2023-03-27
5x Animation devs will work on 3 tasks (38% load) starting 2023-03-14 thru 2023-03-27
..................|.~~~~~...............................................................................
Chapter 06
(Scheduled work ending soon!)
- SQ42 UI Feature Team
1x Design dev working on 2 tasks (256% load) thru 2023-03-12
1x Design dev working on 2 tasks (256% load) thru 2023-03-12
................==|==...................................................................................
Chapter 07
- SQ42 Character Art
2x Art devs working on 1 task (38% load) thru 2023-03-09
2x Art devs working on 1 task (38% load) thru 2023-03-09
................~~|~....................................................................................
- SQ42 Level Design 2 - Flight
4x Design devs working on 7 tasks (33% load) thru 2023-03-28
4x Design devs working on 7 tasks (33% load) thru 2023-03-28
==================|======...............................................................................
Chapter 09
(Scheduled work ending soon!)
- SQ42 Character Art
2x Art devs working on 2 tasks (76% load) thru 2023-03-09
2x Art devs working on 2 tasks (76% load) thru 2023-03-09
................~~|~....................................................................................
Chapter 11
- SQ42 Level Design 2 - Flight
3x Design devs working on 5 tasks (36% load) thru 2023-03-28
3x Design devs working on 5 tasks (36% load) thru 2023-03-28
....====~~~~======|======...............................................................................
Chapter 12
- AI Content Team
3x Design devs working on 1 task (21% load) thru 2023-03-12
3x Design devs working on 1 task (21% load) thru 2023-03-12
====~~~~=====...~~|~~...................................................................................
- Gameplay Story
5x Animation devs working on 5 tasks (20% load) thru 2023-03-27
5x Animation devs working on 5 tasks (20% load) thru 2023-03-27
............~~~~~~|~~~~~~...............................................................................
- SQ42 Character Art
3x Art devs working on 2 tasks (33% load) thru 2023-03-23
3x Art devs working on 2 tasks (33% load) thru 2023-03-23
................~~|~====................................................................................
- SQ42 Level Design 1 - FPS
5x Design devs working on 5 tasks (30% load) thru 2023-03-28
5x Design devs working on 5 tasks (30% load) thru 2023-03-28
........==========|======...............................................................................
Chapter 14
- AI Tech and Feature Team
2x Engineering devs working on 2 tasks (62% load) thru 2023-03-12
2x Engineering devs working on 2 tasks (62% load) thru 2023-03-12
=========...======|==...................................................................................
- SQ42 Art
14x Art devs working on 27 tasks (12% load) thru 2023-03-26
1x Cinematics dev working on 3 tasks (122% load) thru 2023-03-12
14x Art devs working on 27 tasks (12% load) thru 2023-03-26
1x Cinematics dev working on 3 tasks (122% load) thru 2023-03-12
==================|======...............................................................................
........==========|==...................................................................................
- SQ42 Character Art
4x Art devs working on 6 tasks (23% load) thru 2023-03-23
4x Art devs working on 6 tasks (23% load) thru 2023-03-23
~~~~~~~~~~~~~~~~==|=====................................................................................
- SQ42 Level Design 1 - FPS
8x Design devs working on 6 tasks (15% load) thru 2023-03-28
8x Design devs working on 6 tasks (15% load) thru 2023-03-28
==================|======...............................................................................
- Vehicle Feature Team
2x Design devs working on 6 tasks (60% load) thru 2023-03-30
2x Design devs working on 6 tasks (60% load) thru 2023-03-30
..................|.................=============...=====...............................................
==================|=======..............................................................................
Chapter 15
- SQ42 Level Design 3 - Social
3x Design devs working on 6 tasks (40% load) thru 2023-03-28
3x Design devs working on 6 tasks (40% load) thru 2023-03-28
==================|======...............................................................................
Chapter 16
- SQ42 Level Design 2 - Flight
3x Design devs working on 4 tasks (35% load) thru 2023-03-28
3x Design devs working on 4 tasks (35% load) thru 2023-03-28
........==========|======...............................................................................
- SQ42 Level Design 3 - Social
1x Design dev working on 3 tasks (122% load) thru 2023-03-14
1x Design dev working on 3 tasks (122% load) thru 2023-03-14
........==========|==...................................................................................
Chapter 17
- SQ42 Art
9x Art devs working on 18 tasks (13% load) thru 2023-03-26
9x Art devs working on 18 tasks (13% load) thru 2023-03-26
==================|======...............................................................................
- SQ42 Character Art
3x Art devs working on 4 tasks (31% load) thru 2023-03-23
3x Art devs working on 4 tasks (31% load) thru 2023-03-23
........~~~~~~~~==|=====................................................................................
- SQ42 Level Design 1 - FPS
2x Design devs working on 6 tasks (60% load) thru 2023-03-28
2x Design devs working on 6 tasks (60% load) thru 2023-03-28
==================|======...............................................................................
- SQ42 Level Design 2 - Flight
4x Design devs working on 6 tasks (28% load) thru 2023-03-28
4x Design devs working on 6 tasks (28% load) thru 2023-03-28
==================|=~~~~~...............................................................................
- Vehicle Feature Team
2x Engineering devs working on 4 tasks (48% load) thru 2023-04-10
2x Engineering devs working on 4 tasks (48% load) thru 2023-04-10
............~~~~==|=~~~~~~~~~...=================.......................................................
Chapter 18
- SQ42 Art
7x Art devs working on 15 tasks (20% load) thru 2023-03-26
7x Art devs working on 15 tasks (20% load) thru 2023-03-26
==================|======...............................................................................
- SQ42 UI Feature Team
1x Art dev will work on 1 task (128% load) starting 2023-03-13 thru 2023-03-26
1x Art dev will work on 1 task (128% load) starting 2023-03-13 thru 2023-03-26
..................|.=====...............................................................................
Chapter 19
- SQ42 Character Art
1x Art dev working on 3 tasks (128% load) thru 2023-03-23
1x Art dev working on 3 tasks (128% load) thru 2023-03-23
............======|=====................................................................................
- SQ42 Level Design 2 - Flight
2x Design devs working on 5 tasks (48% load) thru 2023-03-14
2x Design devs working on 5 tasks (48% load) thru 2023-03-14
~~~~====~~~~======|==...................................................................................
- SQ42 Level Design 3 - Social
1x Design dev working on 2 tasks (128% load) thru 2023-03-28
1x Design dev working on 2 tasks (128% load) thru 2023-03-28
................==|======...............................................................................
- Narrative
1x Design dev will work on 1 task (128% load) starting 2023-03-13 thru 2023-03-26
1x Design dev will work on 1 task (128% load) starting 2023-03-13 thru 2023-03-26
..................|.=====...............................................................................
Chapter 20
- SQ42 Art
6x Art devs working on 6 tasks (24% load) thru 2023-03-26
6x Art devs working on 6 tasks (24% load) thru 2023-03-26
....==============|======...............................................................................
- SQ42 Level Design 1 - FPS
6x Design devs working on 3 tasks (32% load) thru 2023-03-28
6x Design devs working on 3 tasks (32% load) thru 2023-03-28
................==|======...............................................................................
Chapter 21
- AI Content Team
5x Design devs working on 4 tasks (21% load) thru 2023-03-26
5x Design devs working on 4 tasks (21% load) thru 2023-03-26
........==========|======...............................................................................
- Gameplay Story
4x Animation devs working on 4 tasks (31% load) thru 2023-03-27
4x Animation devs working on 4 tasks (31% load) thru 2023-03-27
................~~|~~~~~~...............................................................................
- SQ42 Art
3x Art devs working on 3 tasks (20% load) thru 2023-03-26
3x Art devs working on 3 tasks (20% load) thru 2023-03-26
............~~~~~~|~~~~~~...............................................................................
- SQ42 Level Design 2 - Flight
1x Design dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
1x Design dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
..................|.=====...............................................................................
Chapter 22
- Gameplay Story
4x Animation devs working on 8 tasks (20% load) thru 2023-03-27
4x Animation devs working on 8 tasks (20% load) thru 2023-03-27
~~~~~~~~~~~~~~~~~~|~~~~~~...............................................................................
- SQ42 Art
2x Art devs working on 4 tasks (61% load) thru 2023-03-12
2x Art devs working on 4 tasks (61% load) thru 2023-03-12
....==============|==...................................................................................
- SQ42 Character Art
1x Art dev working on 1 task (76% load) thru 2023-03-09
1x Art dev working on 1 task (76% load) thru 2023-03-09
====............~~|~....................................................................................
- SQ42 Level Design 1 - FPS
10x Design devs working on 9 tasks (18% load) thru 2023-03-28
10x Design devs working on 9 tasks (18% load) thru 2023-03-28
==================|======...............................................................................
- SQ42 Level Design 2 - Flight
2x Design devs working on 4 tasks (45% load) thru 2023-03-28
2x Design devs working on 4 tasks (45% load) thru 2023-03-28
........~~~~======|=~~~~~...............................................................................
- Tech Animation Team
1x Tech Content dev working on 2 tasks (128% load) thru 2023-03-28
1x Tech Content dev working on 2 tasks (128% load) thru 2023-03-28
................==|======...............................................................................
- AI Content Team
2x Design devs will work on 1 task (64% load) starting 2023-03-13 thru 2023-03-26
2x Design devs will work on 1 task (64% load) starting 2023-03-13 thru 2023-03-26
=============.....|.=====...............................................................................
- SQ42 Level Design 3 - Social
1x Design dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
1x Design dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
..................|.=====...............................................................................
Chapter 23
- Gameplay Story
5x Animation devs working on 7 tasks (17% load) thru 2023-03-13
5x Animation devs working on 7 tasks (17% load) thru 2023-03-13
~~~~~~~~~~~~~~~~~~|~~...................................................................................
- SQ42 Art
3x Art devs working on 3 tasks (20% load) thru 2023-03-26
3x Art devs working on 3 tasks (20% load) thru 2023-03-26
............~~~~~~|~~~~~~...............................................................................
Chapter 24
- SQ42 Level Design 1 - FPS
1x Design dev working on 2 tasks (128% load) thru 2023-03-28
1x Design dev working on 2 tasks (128% load) thru 2023-03-28
................==|======...............................................................................
- SQ42 Level Design 2 - Flight
2x Design devs working on 4 tasks (38% load) thru 2023-03-28
2x Design devs working on 4 tasks (38% load) thru 2023-03-28
........~~~~~~~~~~|~=====...............................................................................
Chapter 26
- SQ42 Character Art
4x Art devs working on 5 tasks (28% load) thru 2023-03-09
4x Art devs working on 5 tasks (28% load) thru 2023-03-09
====~~~~~~~~======|=....................................................................................
- SQ42 Level Design 1 - FPS
9x Design devs working on 6 tasks (13% load) thru 2023-03-28
9x Design devs working on 6 tasks (13% load) thru 2023-03-28
==================|======...............................................................................
- SQ42 Art
10x Art devs will work on 1 task (13% load) starting 2023-03-13 thru 2023-03-26
10x Art devs will work on 1 task (13% load) starting 2023-03-13 thru 2023-03-26
..................|.=====...............................................................................
- SQ42 Level Design 3 - Social
1x Design dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
1x Design dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
..................|.=====...............................................................................
- Tech Animation Team
1x Tech Content dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
1x Tech Content dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
..................|.=====...............................................................................
Chapter 27
- SQ42 Level Design 2 - Flight
4x Design devs working on 3 tasks (15% load) thru 2023-03-14
4x Design devs working on 3 tasks (15% load) thru 2023-03-14
........~~~~~~~~~~|~~...................................................................................
Character Creator
(Scheduled work ending soon!)
- SQ42 Feature Team
1x Engineering dev working on 1 task (139% load) thru 2023-03-14
1x Engineering dev working on 1 task (139% load) thru 2023-03-14
................==|==...................................................................................
- SQ42 UI Feature Team
1x Art dev working on 1 task (128% load) thru 2023-03-12
1x Art dev working on 1 task (128% load) thru 2023-03-12
................==|==...................................................................................
Character Work
- AI Tech and Feature Team
7x Engineering devs working on 10 tasks (28% load) thru 2023-03-26
3x Animation devs working on 7 tasks (46% load) thru 2023-03-26
1x Design dev working on 12 tasks (60% load) thru 2023-03-26
7x Engineering devs working on 10 tasks (28% load) thru 2023-03-26
3x Animation devs working on 7 tasks (46% load) thru 2023-03-26
1x Design dev working on 12 tasks (60% load) thru 2023-03-26
==================|======...............................................................................
==================|======...............................................................................
~~~~~~~~~~~~~~~~~~|~~~~~~...............................................................................
- Facial Animation
9x Animation devs working on 18 tasks (19% load) thru 2023-03-26
9x Animation devs working on 18 tasks (19% load) thru 2023-03-26
==================|======...............................................................................
- Motion Capture Team
9x Animation devs working on 21 tasks (17% load) thru 2023-03-26
9x Animation devs working on 21 tasks (17% load) thru 2023-03-26
==================|======...............................................................................
Crusader Spirit
- Vehicle Content - EU
5x Art devs working on 33 tasks (67% load) thru 2023-06-15
5x Art devs working on 33 tasks (67% load) thru 2023-06-15
==================|=============================........................................................
======..====......|.....................................................................................
Cutting T2
- Weapon Feature Team
1x Engineering dev working on 14 tasks (133% load) thru 2023-06-29
1x Engineering dev working on 14 tasks (133% load) thru 2023-06-29
==================|===========.=====================....................................................
Duster Faction Outfits
(Scheduled work ending soon!)
- SC Character Art
4x Art devs working on 13 tasks (67% load) thru 2023-03-23
4x Art devs working on 13 tasks (67% load) thru 2023-03-23
==================|=====................................................................................
Dynamic Events
- Mission Feature Team
9x Design devs working on 9 tasks (20% load) thru 2023-03-28
4x Engineering devs working on 7 tasks (35% load) thru 2023-03-28
9x Design devs working on 9 tasks (20% load) thru 2023-03-28
4x Engineering devs working on 7 tasks (35% load) thru 2023-03-28
==================|======...............................................................................
==================|======...............................................................................
Entity Properties Plugin
- Editor Team
1x Engineering dev working on 4 tasks (163% load) thru 2023-03-26
1x Engineering dev working on 4 tasks (163% load) thru 2023-03-26
=========...======|======...............................................................................
Freight Elevators
- EU Landing Zone 2
1x Art dev working on 3 tasks (122% load) thru 2023-03-28
1x Art dev working on 3 tasks (122% load) thru 2023-03-28
............======|======...............................................................................
- US PU Gameplay Feature Team
2x Engineering devs working on 6 tasks (75% load) thru 2023-03-09
1x Art dev working on 3 tasks (128% load) thru 2023-03-09
2x Engineering devs working on 6 tasks (75% load) thru 2023-03-09
1x Art dev working on 3 tasks (128% load) thru 2023-03-09
==================|=....................................................................................
........==========|=....................................................................................
Frontier Clothing
(Scheduled work ending soon!)
- SC Character Art
16x Art devs working on 23 tasks (15% load) thru 2023-03-23
16x Art devs working on 23 tasks (15% load) thru 2023-03-23
==================|=====................................................................................
- Character Tech Art
5x Tech Content devs will work on 2 tasks (61% load) starting 2023-03-12 thru 2023-03-23
5x Tech Content devs will work on 2 tasks (61% load) starting 2023-03-12 thru 2023-03-23
================..|.====................................................................................
HEX
- Live Tools Team
5x Engineering devs working on 9 tasks (36% load) thru 2023-03-26
5x Engineering devs working on 9 tasks (36% load) thru 2023-03-26
==================|======...............................................................................
Lockable Containers
- EU PU Gameplay Feature Team
2x Design devs working on 13 tasks (50% load) thru 2023-06-19
2x Design devs working on 13 tasks (50% load) thru 2023-06-19
~~~~==============|=====~~~~~~~~~~~~~~~~~~~~~~~~~...~~~~~~~~~~~~~~~~~~~~~~~~~...........................
..................|.....=========================...=========================...........................
Lorville Cityscape
- MTL Sandbox 1
5x Art devs working on 10 tasks (40% load) thru 2023-03-28
1x Design dev working on 6 tasks (120% load) thru 2023-03-28
5x Art devs working on 10 tasks (40% load) thru 2023-03-28
1x Design dev working on 6 tasks (120% load) thru 2023-03-28
==================|======...............................................................................
==================|======...............................................................................
- Narrative
2x Design devs working on 2 tasks (46% load) thru 2023-03-26
2x Design devs working on 2 tasks (46% load) thru 2023-03-26
=========.......~~|~=====...............................................................................
Map and Radar System Rework
- SQ42 Feature Team
1x Engineering dev working on 5 tasks (121% load) thru 2023-03-28
1x Engineering dev working on 5 tasks (121% load) thru 2023-03-28
....==============|======...............................................................................
- SQ42 UI Feature Team
3x Art devs working on 7 tasks (47% load) thru 2023-03-26
1x Design dev will work on 1 task (128% load) starting 2023-03-13 thru 2023-03-26
3x Art devs working on 7 tasks (47% load) thru 2023-03-26
1x Design dev will work on 1 task (128% load) starting 2023-03-13 thru 2023-03-26
==================|======...............................................................................
....=====.........|.=====...............................................................................
- Vehicle Feature Team
2x Engineering devs working on 7 tasks (69% load) thru 2023-03-30
2x Engineering devs working on 7 tasks (69% load) thru 2023-03-30
==================|=======..............................................................................
MFD Rework
- SQ42 UI Feature Team
1x Art dev working on 2 tasks (256% load) thru 2023-03-12
1x Art dev working on 2 tasks (256% load) thru 2023-03-12
................==|==...................................................................................
- Vehicle Feature Team
8x Engineering devs working on 5 tasks (15% load) thru 2023-03-16
1x Design dev working on 5 tasks (60% load) thru 2023-03-16
8x Engineering devs working on 5 tasks (15% load) thru 2023-03-16
1x Design dev working on 5 tasks (60% load) thru 2023-03-16
==================|===..=================...=====.......................................................
~~~~~~~~~~~~~~~~~~|~~~..................................................................................
Miscellaneous Support
- Actor Feature Team
3x Design devs working on 17 tasks (54% load) thru 2023-06-29
4x Animation devs working on 13 tasks (31% load) thru 2023-06-29
2x Engineering devs working on 13 tasks (62% load) thru 2023-06-29
3x Design devs working on 17 tasks (54% load) thru 2023-06-29
4x Animation devs working on 13 tasks (31% load) thru 2023-06-29
2x Engineering devs working on 13 tasks (62% load) thru 2023-06-29
==================|===========.=====================....................................................
==================|===========.=====================....................................................
==================|===========.=====================....................................................
- AI Content Team
2x Tech Content devs working on 15 tasks (52% load) thru 2023-03-26
4x Animation devs working on 13 tasks (64% load) thru 2023-03-26
2x Tech Content devs working on 15 tasks (52% load) thru 2023-03-26
4x Animation devs working on 13 tasks (64% load) thru 2023-03-26
==================|======...............................................................................
==================|======...............................................................................
- Editor Team
4x Engineering devs working on 6 tasks (61% load) thru 2023-03-26
1x Design dev working on 13 tasks (129% load) thru 2023-03-26
4x Engineering devs working on 6 tasks (61% load) thru 2023-03-26
1x Design dev working on 13 tasks (129% load) thru 2023-03-26
=========...======|======...............................................................................
==================|======...............................................................................
- Gameplay Story
1x Tech Content dev working on 6 tasks (79% load) thru 2023-03-27
1x Tech Content dev working on 6 tasks (79% load) thru 2023-03-27
~~~~~~~~~~~~~~~~==|======...............................................................................
- Narrative
2x Design devs working on 12 tasks (56% load) thru 2023-03-26
2x Design devs working on 12 tasks (56% load) thru 2023-03-26
==================|======...............................................................................
- Systemic Services and Tools Team
4x Engineering devs working on 6 tasks (36% load) thru 2023-03-14
4x Engineering devs working on 6 tasks (36% load) thru 2023-03-14
==================|==...=====================.....................======................................
- UI Tech Team
4x Engineering devs working on 7 tasks (108% load) thru 2023-03-26
4x Engineering devs working on 7 tasks (108% load) thru 2023-03-26
................==|======...............................................................................
- Weapon Feature Team
5x Design devs working on 21 tasks (38% load) thru 2023-06-29
5x Design devs working on 21 tasks (38% load) thru 2023-06-29
==================|===========.=====================....................................................
mobiGlas Rework
(Scheduled work ending soon!)
- SQ42 Feature Team
2x Engineering devs working on 3 tasks (93% load) thru 2023-03-14
2x Engineering devs working on 3 tasks (93% load) thru 2023-03-14
=====.......======|==...................................................................................
New Player Experience
- Narrative
1x Design dev working on 2 tasks (123% load) thru 2023-03-26
1x Design dev working on 2 tasks (123% load) thru 2023-03-26
................==|======...............................................................................
- US PU Gameplay Feature Team
1x Engineering dev working on 5 tasks (124% load) thru 2023-03-09
1x Engineering dev working on 5 tasks (124% load) thru 2023-03-09
==================|=....................................................................................
Persistent Hangars
- US PU Gameplay Feature Team
2x Design devs working on 6 tasks (62% load) thru 2023-03-23
2x Design devs working on 6 tasks (62% load) thru 2023-03-23
..................|.........~~~~~~~~~~~~~...............................................................
==================|=====................................................................................
Persistent Streaming and Server Meshing
- Game Services Team
10x Engineering devs working on 39 tasks (21% load) thru 2023-03-26
10x Engineering devs working on 39 tasks (21% load) thru 2023-03-26
==================|======...............................................................................
- Mission Feature Team
3x Engineering devs working on 19 tasks (41% load) thru 2023-09-20
3x Engineering devs working on 19 tasks (41% load) thru 2023-09-20
==================|=========================================================............................
- Network Team
9x Engineering devs working on 19 tasks (13% load) thru 2023-03-26
9x Engineering devs working on 19 tasks (13% load) thru 2023-03-26
==================|======...............................................................................
- Persistent Tech Team
4x Engineering devs working on 23 tasks (37% load) thru 2023-03-26
4x Engineering devs working on 23 tasks (37% load) thru 2023-03-26
==================|======...............................................................................
Physicalized Weapon Handling
- Weapon Feature Team
1x Engineering dev working on 5 tasks (203% load) thru 2023-03-30
1x Engineering dev working on 5 tasks (203% load) thru 2023-03-30
............======|=======..............................................................................
Player Interaction Experience T0 - Hints & Interactions
- US PU Gameplay Feature Team
1x Art dev working on 6 tasks (149% load) thru 2023-03-09
1x Art dev working on 6 tasks (149% load) thru 2023-03-09
==================|=....................................................................................
- SQ42 UI Feature Team
1x Design dev will work on 2 tasks (256% load) starting 2023-03-13 thru 2023-03-26
1x Design dev will work on 2 tasks (256% load) starting 2023-03-13 thru 2023-03-26
..................|.=====...............................................................................
Player Interaction Experience T2 - Visor HUD & Helmet
- Actor Feature Team
2x Engineering devs working on 6 tasks (72% load) thru 2023-03-30
2x Engineering devs working on 6 tasks (72% load) thru 2023-03-30
....==============|=======..............................................................................
- Vehicle Feature Team
1x Design dev working on 5 tasks (60% load) thru 2023-03-16
1x Design dev working on 5 tasks (60% load) thru 2023-03-16
~~~~~~~~~~~~~~~~~~|~~~..................................................................................
Player/Machine Physical Interaction
- Actor Feature Team
1x Engineering dev working on 11 tasks (218% load) thru 2023-03-30
1x Engineering dev working on 11 tasks (218% load) thru 2023-03-30
==================|=======..............................................................................
==========........|.....................................................................................
Prone T1
- Actor Feature Team
1x Engineering dev working on 10 tasks (198% load) thru 2023-03-30
1x Animation dev working on 13 tasks (258% load) thru 2023-03-30
1x Engineering dev working on 10 tasks (198% load) thru 2023-03-30
1x Animation dev working on 13 tasks (258% load) thru 2023-03-30
==================|=======..............................................................................
==================|=======..............................................................................
Pyro Space Stations
- Narrative
2x Design devs working on 2 tasks (31% load) thru 2023-03-12
2x Design devs working on 2 tasks (31% load) thru 2023-03-12
............~~~~~~|~~...................................................................................
Quantum Simulation
- Systemic Services and Tools Team
6x Engineering devs working on 17 tasks (28% load) thru 2023-06-19
6x Engineering devs working on 17 tasks (28% load) thru 2023-06-19
==================|==============================.==========================............................
Quantum Travel Experience
(Scheduled work ending soon!)
- SQ42 UI Feature Team
1x Design dev working on 1 task (128% load) thru 2023-03-12
1x Design dev working on 1 task (128% load) thru 2023-03-12
................==|==...................................................................................
- Vehicle Feature Team
3x Engineering devs working on 3 tasks (41% load) thru 2023-03-16
3x Engineering devs working on 3 tasks (41% load) thru 2023-03-16
........==========|===..................................................................................
Resource Management
- EU PU Gameplay Feature Team
2x Engineering devs working on 11 tasks (66% load) thru 2023-05-22
3x Design devs will work on 8 tasks (23% load) starting 2023-03-15 thru 2023-06-19
2x Engineering devs working on 11 tasks (66% load) thru 2023-05-22
3x Design devs will work on 8 tasks (23% load) starting 2023-03-15 thru 2023-06-19
~~~~~~~~~~~~~~~~~~|.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~...~~~~~~~~~~~~~~~~~~~~~~~~~...........................
==================|======================...=====...=========================...........................
- Vehicle Content - EU
4x Art devs working on 12 tasks (68% load) thru 2023-03-16
4x Art devs working on 12 tasks (68% load) thru 2023-03-16
==================|===..................................................................................
RSI Lynx
- Vehicle Content - EU
3x Art devs working on 18 tasks (114% load) thru 2023-03-30
3x Art devs working on 18 tasks (114% load) thru 2023-03-30
==================|=======..............................................................................
==========........|.....................................................................................
- Audio
1x Audio dev will work on 5 tasks (309% load) starting 2023-03-09 thru 2023-04-05
1x Audio dev will work on 5 tasks (309% load) starting 2023-03-09 thru 2023-04-05
..................|=========............................................................................
Save/Load
(Scheduled work ending soon!)
- SQ42 Feature Team
2x Engineering devs working on 5 tasks (60% load) thru 2023-03-14
2x Engineering devs working on 5 tasks (60% load) thru 2023-03-14
==================|==...................................................................................
Seated Item Handling
- Actor Feature Team
2x Animation devs working on 9 tasks (58% load) thru 2023-05-14
2x Animation devs working on 9 tasks (58% load) thru 2023-05-14
==================|===========.========.................................................................
SQ42 - Vehicle Support
- SQ42 Art
4x Art devs working on 12 tasks (28% load) thru 2023-03-26
4x Art devs working on 12 tasks (28% load) thru 2023-03-26
==================|======...............................................................................
- Vehicle Content - EU
4x Design devs working on 12 tasks (68% load) thru 2023-03-16
4x Design devs working on 12 tasks (68% load) thru 2023-03-16
==================|===....======================....======================..............................
..................|.......======================....======================..............................
- Vehicle Content - US
1x Design dev working on 12 tasks (120% load) thru 2023-03-17
1x Design dev working on 12 tasks (120% load) thru 2023-03-17
==============....|.......====~~~~================......................................................
==================|===..................................................................................
- Vehicle Feature Team
7x Engineering devs working on 7 tasks (24% load) thru 2023-03-16
7x Engineering devs working on 7 tasks (24% load) thru 2023-03-16
==================|===..=========================...=========================...........................
StarWords Improvements
- Tools Team
2x Engineering devs working on 15 tasks (74% load) thru 2023-03-26
2x Engineering devs working on 15 tasks (74% load) thru 2023-03-26
==================|======...............................................................................
Subsumption Editor Integration
(Scheduled work ending soon!)
- AI Tech and Feature Team
1x Engineering dev working on 5 tasks (119% load) thru 2023-03-12
1x Engineering dev working on 5 tasks (119% load) thru 2023-03-12
==================|==...................................................................................
TestRunner Improvements
- Tools Team
3x Engineering devs working on 9 tasks (60% load) thru 2023-03-26
3x Engineering devs working on 9 tasks (60% load) thru 2023-03-26
==================|======...............................................................................
Unannounced Vehicle
(Scheduled work ending soon!)
- Vehicle Content - US
2x Tech Content devs working on 3 tasks (100% load) thru 2023-03-17
2x Tech Content devs working on 3 tasks (100% load) thru 2023-03-17
..............====|===..................................................................................
Unannounced Vehicle
- Vehicle Content - US
3x Art devs working on 9 tasks (68% load) thru 2023-03-17
3x Art devs working on 9 tasks (68% load) thru 2023-03-17
..................|...........~~~~......................................................................
==================|===....~~~~~~~~~~~~~~~~~~~~~~~~......................................................
Unannounced Vehicle
(Recently started!)
- Vehicle Content - EU
2x Design devs working on 6 tasks (278% load) thru 2023-03-16
5x Art devs working on 6 tasks (111% load) thru 2023-03-16
2x Design devs working on 6 tasks (278% load) thru 2023-03-16
5x Art devs working on 6 tasks (111% load) thru 2023-03-16
................==|===....======================........................................................
................==|===....======================....======================..............................
Underground Facilities
- MTL Sandbox 1
4x Art devs working on 15 tasks (34% load) thru 2023-06-29
1x Design dev working on 12 tasks (109% load) thru 2023-06-29
4x Art devs working on 15 tasks (34% load) thru 2023-06-29
1x Design dev working on 12 tasks (109% load) thru 2023-06-29
==================|===========.===============~~~~~~....................................................
==================|===========.===============~~~~~~....................................................
Vehicle Tractor Beams
- EU PU Gameplay Feature Team
1x Design dev working on 5 tasks (72% load) thru 2023-03-28
2x Engineering devs working on 12 tasks (60% load) thru 2023-06-19
1x Design dev working on 5 tasks (72% load) thru 2023-03-28
2x Engineering devs working on 12 tasks (60% load) thru 2023-06-19
....~~~~~~~~~~~~==|=~~~~~...............................................................................
==================|==============================.......................................................
- Narrative
1x Design dev working on 2 tasks (123% load) thru 2023-03-26
1x Design dev working on 2 tasks (123% load) thru 2023-03-26
................==|======...............................................................................
Weapon Misfire & Wear
- Weapon Feature Team
3x Engineering devs working on 14 tasks (44% load) thru 2023-06-29
3x Engineering devs working on 14 tasks (44% load) thru 2023-06-29
==================|===========.=====================....................................................
- Weapon Content Team
5x Art devs will work on 9 tasks (231% load) starting 2023-03-23 thru 2023-04-05
5x Art devs will work on 9 tasks (231% load) starting 2023-03-23 thru 2023-04-05
..................|...======............................................................................
The following deliverables are scheduled to begin (or continue) work within two weeks
Asteroid Facilities
- EU Sandbox 1
3x Art devs will work on 12 tasks (88% load) starting 2023-03-15 thru 2023-05-30
3x Art devs will work on 12 tasks (88% load) starting 2023-03-15 thru 2023-05-30
........==========|.==========.============...======....................................................
Hacking T0
- SQ42 UI Feature Team
1x Design dev will work on 2 tasks (256% load) starting 2023-03-13 thru 2023-03-26
1x Design dev will work on 2 tasks (256% load) starting 2023-03-13 thru 2023-03-26
....=========.....|.=====...............................................................................
Outpost Homestead - Independent & Outlaw
- EU Sandbox 1
12x Art devs will work on 34 tasks (62% load) starting 2023-03-15 thru 2023-05-30
4x Design devs will work on 22 tasks (121% load) starting 2023-03-15 thru 2023-05-30
12x Art devs will work on 34 tasks (62% load) starting 2023-03-15 thru 2023-05-30
4x Design devs will work on 22 tasks (121% load) starting 2023-03-15 thru 2023-05-30
==================|.==========.============...======....................................................
==================|.==========.============...======....................................................
Pyro System, Planet, and Mission Setup
- EU Sandbox 1
1x Art dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
1x Art dev will work on 1 task (128% load) starting 2023-03-15 thru 2023-03-28
............======|.=====...............................................................................
Salvage - Vehicle Munching
- EU PU Gameplay Feature Team
1x Engineering dev will work on 2 tasks (256% load) starting 2023-03-15 thru 2023-03-28
1x Engineering dev will work on 2 tasks (256% load) starting 2023-03-15 thru 2023-03-28
....==============|.=====...............................................................................
Unannounced Vehicle
- Audio
2x Audio devs will work on 7 tasks (216% load) starting 2023-03-09 thru 2023-04-05