Scheduled Deliverables
as of 2022-12-21
There are currently 61 scheduled deliverables being worked on by 30 teams
10 deliverables are scheduled to begin work by 4 team(s) within two weeks
This report lists the actively assigned deliverables and the associated teams, along with the number of developers assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.
The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.
The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.
extra analysis (click me)
There are approximately 253 devs (out of ~512, or 49%) with 531 assignments scheduled to work on 61 observable deliverables. Of those deliverables, 18% are for SQ42 exclusively, with ~101 devs (20%) scheduled for approximately 657 man-days. 36% of deliverables are shared between both projects.
12 deliverable(s) are not currently scheduled to continue work after this sprint:
- Argo SRV
- Chapter 26
- FPS Devices T1
- Freight Elevators
- Gen12 - Renderer T1
- MISC Hull C
- New Player Experience
- Ocean Shader Improvements
- Physical Damage & Breakability
- Physics - Ropes Simulation
- Time Trial Race Missions
- VOLT Fresnel
- Actor Feature Team
full-time with 85 task(s) scheduled, 50% of which are for SQ42 - AI Content Team
26% part-time with 34 task(s) scheduled, 67% of which are for SQ42 - Audio
full-time with 62 task(s) scheduled, 83% of which are for SQ42 - Character Tech Art
full-time with 8 task(s) scheduled, 67% of which are for SQ42 - Editor Team
full-time with 19 task(s) scheduled, 50% of which are for SQ42 - Engine Team
full-time with 11 task(s) scheduled, 33% of which are for SQ42 - EU Landing Zone 1
7% part-time with 14 task(s) scheduled, 50% of which are for SQ42 - EU Landing Zone 2
44% part-time with 9 task(s) scheduled, all of which are for SC - EU PU Gameplay Feature Team
30% part-time with 46 task(s) scheduled, all of which are for SC - EU Sandbox 1
full-time with 58 task(s) scheduled, all of which are for SC - Game Services Team
39% part-time with 31 task(s) scheduled, all of which are for SC - Graphics Team
full-time with 26 task(s) scheduled, 50% of which are for SQ42 - Live Tools Team
full-time with 13 task(s) scheduled, 33% of which are for SQ42 - Mission Feature Team
full-time with 53 task(s) scheduled, 13% of which are for SQ42 - MTL Sandbox 1
full-time with 87 task(s) scheduled, all of which are for SC - Network Team
full-time with 18 task(s) scheduled, all of which are for SC - Persistent Tech Team
full-time with 20 task(s) scheduled, all of which are for SC - Physics Team
full-time with 7 task(s) scheduled, 50% of which are for SQ42 - SC Character Art
full-time with 26 task(s) scheduled, all of which are for SC - SQ42 Character Art
19% part-time with 32 task(s) scheduled, all of which are for SQ42 - SQ42 UI Feature Team
full-time with 11 task(s) scheduled, 67% of which are for SQ42 - Systemic Services and Tools Team
full-time with 20 task(s) scheduled, 25% of which are for SQ42 - Tools Team
full-time with 20 task(s) scheduled, 50% of which are for SQ42 - UI Tech Team
full-time with 1 task(s) scheduled, 50% of which are for SQ42 - US PU Gameplay Feature Team
full-time with 31 task(s) scheduled, 25% of which are for SQ42 - Vehicle Content - EU
full-time with 86 task(s) scheduled, 25% of which are for SQ42 - Vehicle Content - US
full-time with 34 task(s) scheduled, 20% of which are for SQ42 - Vehicle Feature Team
6% part-time with 36 task(s) scheduled, 50% of which are for SQ42 - Weapon Content Team
full-time with 16 task(s) scheduled, 50% of which are for SQ42 - Weapon Feature Team
full-time with 46 task(s) scheduled, 50% of which are for SQ42
Aopoa San'tok.yāi
- Vehicle Content - US
1x Art dev working on 6 tasks (135% load) thru 2023-03-17
1x Design dev working on 6 tasks (135% load) thru 2023-03-17
1x Art dev working on 6 tasks (135% load) thru 2023-03-17
1x Design dev working on 6 tasks (135% load) thru 2023-03-17
==============|=======....~~~~~~~~~~~~~~~~~~~~~~~~......................................................
==============|=======....~~~~~~~~~~~~~~~~~~~~====......................................................
Argo SRV
(Scheduled work ending soon!)
- Vehicle Content - EU
4x Art devs working on 9 tasks (71% load) thru 2023-02-23
4x Art devs working on 9 tasks (71% load) thru 2023-02-23
==============|=........................................................................................
======..====..|.........................................................................................
Asteroid Facilities
- EU Sandbox 1
3x Art devs working on 8 tasks (159% load) thru 2023-03-01
3x Art devs working on 8 tasks (159% load) thru 2023-03-01
........======|===..==========.============...======....................................................
Bounty Hunter V2
- EU Landing Zone 2
2x Art devs working on 9 tasks (70% load) thru 2023-03-28
2x Art devs working on 9 tasks (70% load) thru 2023-03-28
~~~~~~~~~~~~~~|~~~~~~~~~~...............................................................................
- Mission Feature Team
2x Engineering devs working on 5 tasks (74% load) thru 2023-03-01
3x Design devs working on 7 tasks (47% load) thru 2023-03-28
2x Engineering devs working on 5 tasks (74% load) thru 2023-03-01
3x Design devs working on 7 tasks (47% load) thru 2023-03-28
==============|===......................................................................................
==============|==========...............................................................................
Bug Fixing & Tech Debt
- EU Landing Zone 1
5x Design devs working on 4 tasks (33% load) thru 2023-03-28
15x Art devs working on 10 tasks (26% load) thru 2023-03-28
5x Design devs working on 4 tasks (33% load) thru 2023-03-28
15x Art devs working on 10 tasks (26% load) thru 2023-03-28
=...........==|==========...............................................................................
=...........==|==========...............................................................................
- Live Tools Team
5x Engineering devs working on 6 tasks (24% load) thru 2023-03-26
5x Engineering devs working on 6 tasks (24% load) thru 2023-03-26
==============|==========...............................................................................
- Mission Feature Team
3x Design devs working on 6 tasks (40% load) thru 2023-03-28
3x Design devs working on 6 tasks (40% load) thru 2023-03-28
==============|==========...............................................................................
- US PU Gameplay Feature Team
5x Design devs working on 6 tasks (25% load) thru 2023-03-23
5x Design devs working on 6 tasks (25% load) thru 2023-03-23
..............|.....====................~~~~~~~~~...................=========...........................
==============|=========....~~~~~~~~~~~~~~~~~~~~~...=========================...........................
- Engine Team
5x Engineering devs will work on 6 tasks (74% load) starting 2023-02-27 thru 2023-03-26
5x Engineering devs will work on 6 tasks (74% load) starting 2023-02-27 thru 2023-03-26
..............|.=========...............................................................................
- EU Sandbox 1
13x Art devs will work on 7 tasks (75% load) starting 2023-03-02 thru 2023-03-14
6x Design devs will work on 3 tasks (69% load) starting 2023-03-02 thru 2023-03-14
13x Art devs will work on 7 tasks (75% load) starting 2023-03-02 thru 2023-03-14
6x Design devs will work on 3 tasks (69% load) starting 2023-03-02 thru 2023-03-14
..............|.=====.....................======........................................................
..............|.=====.....................======........................................................
- Graphics Team
13x Engineering devs will work on 11 tasks (71% load) starting 2023-03-06 thru 2023-03-26
3x Tech Content devs will work on 1 task (28% load) starting 2023-03-06 thru 2023-03-26
13x Engineering devs will work on 11 tasks (71% load) starting 2023-03-06 thru 2023-03-26
3x Tech Content devs will work on 1 task (28% load) starting 2023-03-06 thru 2023-03-26
..............|...=======...............................................................................
..............|...=======...............................................................................
- Physics Team
4x Engineering devs will work on 3 tasks (63% load) starting 2023-03-06 thru 2023-03-26
4x Engineering devs will work on 3 tasks (63% load) starting 2023-03-06 thru 2023-03-26
..............|...=======...............................................................................
Building Interiors
- MTL Sandbox 1
14x Art devs working on 51 tasks (34% load) thru 2023-06-29
4x Design devs working on 27 tasks (64% load) thru 2023-06-29
14x Art devs working on 51 tasks (34% load) thru 2023-06-29
4x Design devs working on 27 tasks (64% load) thru 2023-06-29
==============|===============.=====================....................................................
==============|===============.=====================....................................................
Chapter 01
- Audio
4x Audio devs working on 14 tasks (65% load) thru 2023-04-05
4x Audio devs working on 14 tasks (65% load) thru 2023-04-05
==============|=============............................................................................
- SQ42 UI Feature Team
3x Art devs working on 4 tasks (40% load) thru 2023-03-26
3x Art devs working on 4 tasks (40% load) thru 2023-03-26
........======|==========...............................................................................
Chapter 04
- AI Content Team
6x Design devs working on 8 tasks (25% load) thru 2023-03-26
6x Design devs working on 8 tasks (25% load) thru 2023-03-26
==============|==========...............................................................................
- SQ42 Character Art
4x Art devs working on 6 tasks (28% load) thru 2023-03-23
4x Art devs working on 6 tasks (28% load) thru 2023-03-23
============~~|~========................................................................................
Chapter 05
- Character Tech Art
4x Tech Content devs working on 3 tasks (32% load) thru 2023-03-09
4x Tech Content devs working on 3 tasks (32% load) thru 2023-03-09
........======|=====....................................................................................
- SQ42 Character Art
5x Art devs working on 8 tasks (31% load) thru 2023-03-23
5x Art devs working on 8 tasks (31% load) thru 2023-03-23
============~~|~========................................................................................
- AI Content Team
1x Design dev will work on 1 task (128% load) starting 2023-02-27 thru 2023-03-12
1x Design dev will work on 1 task (128% load) starting 2023-02-27 thru 2023-03-12
..............|.=====...................................................................................
Chapter 12
- Audio
3x Audio devs working on 15 tasks (93% load) thru 2023-04-05
3x Audio devs working on 15 tasks (93% load) thru 2023-04-05
==============|=============............................................................................
- Character Tech Art
4x Tech Content devs working on 1 task (38% load) thru 2023-02-23
4x Tech Content devs working on 1 task (38% load) thru 2023-02-23
............==|=........................................................................................
- AI Content Team
3x Design devs will work on 1 task (21% load) starting 2023-02-27 thru 2023-03-12
3x Design devs will work on 1 task (21% load) starting 2023-02-27 thru 2023-03-12
====~~~~=====.|.~~~~~...................................................................................
- SQ42 Character Art
3x Art devs will work on 2 tasks (33% load) starting 2023-02-26 thru 2023-03-23
3x Art devs will work on 2 tasks (33% load) starting 2023-02-26 thru 2023-03-23
..............|.~~~~====................................................................................
Chapter 14
- Audio
1x Audio dev working on 10 tasks (242% load) thru 2023-04-05
1x Audio dev working on 10 tasks (242% load) thru 2023-04-05
......========|=============............................................................................
- SQ42 Character Art
4x Art devs working on 6 tasks (26% load) thru 2023-03-23
4x Art devs working on 6 tasks (26% load) thru 2023-03-23
====~~~~~~~~~~|~========................................................................................
Chapter 17
- SQ42 Character Art
3x Art devs working on 4 tasks (31% load) thru 2023-03-23
3x Art devs working on 4 tasks (31% load) thru 2023-03-23
........~~~~~~|~========................................................................................
Chapter 19
- SQ42 Character Art
1x Art dev working on 3 tasks (128% load) thru 2023-03-23
1x Art dev working on 3 tasks (128% load) thru 2023-03-23
............==|=========................................................................................
Chapter 21
- AI Content Team
5x Design devs working on 4 tasks (21% load) thru 2023-03-26
5x Design devs working on 4 tasks (21% load) thru 2023-03-26
........======|==========...............................................................................
Chapter 26
(Scheduled work ending soon!)
- SQ42 Character Art
4x Art devs working on 5 tasks (31% load) thru 2023-03-09
4x Art devs working on 5 tasks (31% load) thru 2023-03-09
====~~~~~~~~==|=====....................................................................................
Character Creator
- Graphics Team
1x Engineering dev working on 3 tasks (79% load) thru 2023-03-05
1x Engineering dev working on 3 tasks (79% load) thru 2023-03-05
==============|====.....................................................................................
- SQ42 UI Feature Team
1x Art dev will work on 1 task (128% load) starting 2023-02-27 thru 2023-03-12
1x Art dev will work on 1 task (128% load) starting 2023-02-27 thru 2023-03-12
..............|.=====...................................................................................
Crusader Spirit
- Vehicle Content - EU
5x Art devs working on 28 tasks (57% load) thru 2023-06-15
5x Art devs working on 28 tasks (57% load) thru 2023-06-15
==============|=================================........................................................
======..====..|.........................................................................................
Cutting T2
- Weapon Feature Team
1x Engineering dev working on 13 tasks (124% load) thru 2023-06-29
1x Engineering dev working on 13 tasks (124% load) thru 2023-06-29
==============|===============.=====================....................................................
Distortion Propagation
- Vehicle Feature Team
1x Design dev working on 3 tasks (185% load) thru 2023-03-02
1x Design dev working on 3 tasks (185% load) thru 2023-03-02
........======|===......................................................................................
Duster Faction Outfits
- SC Character Art
4x Art devs working on 9 tasks (46% load) thru 2023-03-23
4x Art devs working on 9 tasks (46% load) thru 2023-03-23
==============|=========................................................................................
Dynamic Events
- Mission Feature Team
9x Design devs working on 7 tasks (16% load) thru 2023-03-28
4x Engineering devs working on 6 tasks (30% load) thru 2023-03-28
9x Design devs working on 7 tasks (16% load) thru 2023-03-28
4x Engineering devs working on 6 tasks (30% load) thru 2023-03-28
==============|==========...............................................................................
==============|==========...............................................................................
Entity Properties Plugin
- Editor Team
1x Engineering dev working on 3 tasks (122% load) thru 2023-03-26
1x Engineering dev working on 3 tasks (122% load) thru 2023-03-26
=========...==|==========...............................................................................
FPS Devices T1
(Scheduled work ending soon!)
- Weapon Content Team
3x Art devs working on 2 tasks (85% load) thru 2023-03-01
3x Art devs working on 2 tasks (85% load) thru 2023-03-01
............==|===......................................................................................
Freight Elevators
(Scheduled work ending soon!)
- Systemic Services and Tools Team
1x Engineering dev working on 1 task (119% load) thru 2023-03-01
1x Engineering dev working on 1 task (119% load) thru 2023-03-01
............==|===......................................................................................
- US PU Gameplay Feature Team
1x Art dev working on 3 tasks (128% load) thru 2023-03-09
2x Engineering devs working on 6 tasks (75% load) thru 2023-03-09
1x Art dev working on 3 tasks (128% load) thru 2023-03-09
2x Engineering devs working on 6 tasks (75% load) thru 2023-03-09
........======|=====....................................................................................
==============|=====....................................................................................
Frontier Clothing
- Character Tech Art
5x Tech Content devs working on 4 tasks (25% load) thru 2023-02-23
5x Tech Content devs working on 4 tasks (25% load) thru 2023-02-23
==============|=....====................................................................................
- SC Character Art
16x Art devs working on 17 tasks (11% load) thru 2023-03-23
16x Art devs working on 17 tasks (11% load) thru 2023-03-23
==============|=========................................................................................
Gen12 - Renderer T1
(Scheduled work ending soon!)
- Engine Team
4x Engineering devs working on 7 tasks (52% load) thru 2023-02-26
4x Engineering devs working on 7 tasks (52% load) thru 2023-02-26
==============|==.......................................................................................
- Graphics Team
9x Engineering devs working on 8 tasks (24% load) thru 2023-03-05
9x Engineering devs working on 8 tasks (24% load) thru 2023-03-05
==============|====.....................................................................................
HEX
- Live Tools Team
5x Engineering devs working on 7 tasks (28% load) thru 2023-03-26
5x Engineering devs working on 7 tasks (28% load) thru 2023-03-26
==============|==========...............................................................................
Jump Points
- Graphics Team
1x Engineering dev working on 3 tasks (79% load) thru 2023-03-05
1x Engineering dev working on 3 tasks (79% load) thru 2023-03-05
==============|====.....................................................................................
- Vehicle Feature Team
7x Engineering devs working on 8 tasks (27% load) thru 2023-03-16
7x Engineering devs working on 8 tasks (27% load) thru 2023-03-16
==============|=======..~~~~=================...........................................................
Lockable Containers
- EU PU Gameplay Feature Team
2x Design devs working on 12 tasks (45% load) thru 2023-06-19
2x Design devs working on 12 tasks (45% load) thru 2023-06-19
~~~~==========|=========~~~~~~~~~~~~~~~~~~~~~~~~~...~~~~~~~~~~~~~~~~~~~~~~~~~...........................
..............|.........=========================...=========================...........................
Lorville Cityscape
- MTL Sandbox 1
4x Art devs working on 9 tasks (45% load) thru 2023-03-28
4x Art devs working on 9 tasks (45% load) thru 2023-03-28
==============|==========...............................................................................
Map and Radar System Rework
- Graphics Team
1x Engineering dev working on 3 tasks (79% load) thru 2023-03-05
1x Engineering dev working on 3 tasks (79% load) thru 2023-03-05
==============|====.....................................................................................
- SQ42 UI Feature Team
3x Art devs working on 7 tasks (47% load) thru 2023-03-26
3x Art devs working on 7 tasks (47% load) thru 2023-03-26
==============|==========...............................................................................
....=====.....|.....=====...............................................................................
MISC Hull C
(Scheduled work ending soon!)
- Audio
2x Audio devs working on 9 tasks (121% load) thru 2023-03-08
2x Audio devs working on 9 tasks (121% load) thru 2023-03-08
==============|=====....................................................................................
- Vehicle Content - EU
6x Art devs working on 2 tasks (51% load) thru 2023-02-23
6x Art devs working on 2 tasks (51% load) thru 2023-02-23
............==|=........................................................................................
Miscellaneous Support
- Actor Feature Team
3x Design devs working on 14 tasks (44% load) thru 2023-06-29
4x Animation devs working on 12 tasks (29% load) thru 2023-06-29
2x Engineering devs working on 12 tasks (57% load) thru 2023-06-29
3x Design devs working on 14 tasks (44% load) thru 2023-06-29
4x Animation devs working on 12 tasks (29% load) thru 2023-06-29
2x Engineering devs working on 12 tasks (57% load) thru 2023-06-29
==============|===============.=====================....................................................
==============|===============.=====================....................................................
==============|===============.=====================....................................................
- AI Content Team
2x Tech Content devs working on 13 tasks (47% load) thru 2023-03-26
4x Animation devs working on 9 tasks (45% load) thru 2023-03-26
2x Tech Content devs working on 13 tasks (47% load) thru 2023-03-26
4x Animation devs working on 9 tasks (45% load) thru 2023-03-26
==============|==========...............................................................................
==============|==========...............................................................................
- Editor Team
4x Engineering devs working on 4 tasks (41% load) thru 2023-03-26
1x Design dev working on 12 tasks (119% load) thru 2023-03-26
4x Engineering devs working on 4 tasks (41% load) thru 2023-03-26
1x Design dev working on 12 tasks (119% load) thru 2023-03-26
=========...==|==========...............................................................................
==============|==========...............................................................................
- Graphics Team
2x Tech Content devs working on 3 tasks (40% load) thru 2023-03-05
5x Engineering devs working on 3 tasks (16% load) thru 2023-03-05
2x Tech Content devs working on 3 tasks (40% load) thru 2023-03-05
5x Engineering devs working on 3 tasks (16% load) thru 2023-03-05
==============|====.....................................................................................
==============|====.....................................................................................
- Systemic Services and Tools Team
4x Engineering devs working on 5 tasks (30% load) thru 2023-03-14
4x Engineering devs working on 5 tasks (30% load) thru 2023-03-14
==============|======...=====================.....................======................................
- Vehicle Feature Team
13x Engineering devs working on 9 tasks (8% load) thru 2023-06-19
13x Engineering devs working on 9 tasks (8% load) thru 2023-06-19
....======....|.....~~~~~~..............................................................................
............==|=====~~~~~~~~=====================.......................................................
- Weapon Feature Team
5x Design devs working on 16 tasks (30% load) thru 2023-06-29
5x Design devs working on 16 tasks (30% load) thru 2023-06-29
==============|===============.=====================....................................................
- UI Tech Team
4x Engineering devs will work on 4 tasks (62% load) starting 2023-02-27 thru 2023-03-26
4x Engineering devs will work on 4 tasks (62% load) starting 2023-02-27 thru 2023-03-26
..............|.=========...............................................................................
New Player Experience
(Scheduled work ending soon!)
- US PU Gameplay Feature Team
1x Engineering dev working on 5 tasks (124% load) thru 2023-03-09
1x Engineering dev working on 5 tasks (124% load) thru 2023-03-09
==============|=====....................................................................................
Ocean Shader Improvements
(Scheduled work ending soon!)
- Graphics Team
2x Engineering devs working on 3 tasks (40% load) thru 2023-03-05
2x Engineering devs working on 3 tasks (40% load) thru 2023-03-05
==============|====.....................................................................................
Outpost Homestead - Independent & Outlaw
- EU Sandbox 1
12x Art devs working on 33 tasks (82% load) thru 2023-03-01
4x Design devs working on 13 tasks (97% load) thru 2023-03-01
12x Art devs working on 33 tasks (82% load) thru 2023-03-01
4x Design devs working on 13 tasks (97% load) thru 2023-03-01
==============|===..==========.============...======....................................................
==============|===..==========.============...======....................................................
Persistent Hangars
- US PU Gameplay Feature Team
2x Design devs working on 6 tasks (62% load) thru 2023-03-23
2x Design devs working on 6 tasks (62% load) thru 2023-03-23
==============|=========................................................................................
..............|.............~~~~~~~~~~~~~...............................................................
Persistent Streaming and Server Meshing
- Engine Team
1x Engineering dev working on 4 tasks (119% load) thru 2023-02-26
1x Engineering dev working on 4 tasks (119% load) thru 2023-02-26
==============|==.......................................................................................
- Game Services Team
10x Engineering devs working on 31 tasks (16% load) thru 2023-03-26
10x Engineering devs working on 31 tasks (16% load) thru 2023-03-26
==============|==========...............................................................................
- Mission Feature Team
3x Engineering devs working on 18 tasks (39% load) thru 2023-09-20
3x Engineering devs working on 18 tasks (39% load) thru 2023-09-20
==============|=============================================================............................
- Network Team
9x Engineering devs working on 18 tasks (13% load) thru 2023-03-26
9x Engineering devs working on 18 tasks (13% load) thru 2023-03-26
==============|==========...............................................................................
- Persistent Tech Team
4x Engineering devs working on 20 tasks (32% load) thru 2023-03-26
4x Engineering devs working on 20 tasks (32% load) thru 2023-03-26
==============|==========...............................................................................
- Vehicle Feature Team
5x Engineering devs working on 5 tasks (24% load) thru 2023-03-16
5x Engineering devs working on 5 tasks (24% load) thru 2023-03-16
==============|=======..........=====...................................................................
Physical Damage & Breakability
(Scheduled work ending soon!)
- Physics Team
3x Engineering devs working on 4 tasks (35% load) thru 2023-03-05
3x Engineering devs working on 4 tasks (35% load) thru 2023-03-05
==============|====.....................................................................................
Physicalized Weapon Handling
(Recently started!)
- Weapon Feature Team
1x Engineering dev working on 4 tasks (163% load) thru 2023-03-30
1x Engineering dev working on 4 tasks (163% load) thru 2023-03-30
............==|===========..............................................................................
Physics - Ropes Simulation
(Scheduled work ending soon!)
- Physics Team
1x Engineering dev working on 3 tasks (79% load) thru 2023-03-05
1x Engineering dev working on 3 tasks (79% load) thru 2023-03-05
==============|====.....................................................................................
Player Interaction Experience T0 - Hints & Interactions
- US PU Gameplay Feature Team
1x Art dev working on 5 tasks (124% load) thru 2023-03-09
1x Art dev working on 5 tasks (124% load) thru 2023-03-09
==============|=====....................................................................................
Player Interaction Experience T2 - Visor HUD & Helmet
- Actor Feature Team
2x Engineering devs working on 6 tasks (72% load) thru 2023-03-30
2x Engineering devs working on 6 tasks (72% load) thru 2023-03-30
....==========|===========..............................................................................
- UI Tech Team
1x Engineering dev working on 1 task (128% load) thru 2023-02-26
1x Engineering dev working on 1 task (128% load) thru 2023-02-26
............==|==.......................................................................................
Player/Machine Physical Interaction
- Actor Feature Team
1x Engineering dev working on 10 tasks (198% load) thru 2023-03-30
1x Engineering dev working on 10 tasks (198% load) thru 2023-03-30
==============|===========..............................................................................
==========....|.........................................................................................
Prone T1
- Actor Feature Team
1x Engineering dev working on 10 tasks (198% load) thru 2023-03-30
1x Animation dev working on 12 tasks (238% load) thru 2023-03-30
1x Engineering dev working on 10 tasks (198% load) thru 2023-03-30
1x Animation dev working on 12 tasks (238% load) thru 2023-03-30
==============|===========..............................................................................
==============|===========..............................................................................
Pyro System, Planet, and Mission Setup
- EU Sandbox 1
1x Art dev working on 4 tasks (476% load) thru 2023-03-01
1x Art dev working on 4 tasks (476% load) thru 2023-03-01
............==|===..=====...............................................................................
Quantum Simulation
- Systemic Services and Tools Team
6x Engineering devs working on 14 tasks (23% load) thru 2023-06-19
6x Engineering devs working on 14 tasks (23% load) thru 2023-06-19
==============|==================================.==========================............................
Resource Management
- EU PU Gameplay Feature Team
3x Design devs working on 4 tasks (20% load) thru 2023-03-01
2x Engineering devs working on 10 tasks (60% load) thru 2023-05-22
3x Design devs working on 4 tasks (20% load) thru 2023-03-01
2x Engineering devs working on 10 tasks (60% load) thru 2023-05-22
~~~~~~~~~~~~~~|~~~..~~~~~~~~~~~~~~~~~~~~~~~~~~~~~...~~~~~~~~~~~~~~~~~~~~~~~~~...........................
==============|==========================...=====...=========================...........................
- Vehicle Content - EU
4x Art devs working on 11 tasks (62% load) thru 2023-03-16
4x Art devs working on 11 tasks (62% load) thru 2023-03-16
==============|=======..................................................................................
RSI Lynx
- Vehicle Content - EU
3x Art devs working on 15 tasks (95% load) thru 2023-03-30
3x Art devs working on 15 tasks (95% load) thru 2023-03-30
==============|===========..............................................................................
==========....|.........................................................................................
- Audio
1x Audio dev will work on 4 tasks (247% load) starting 2023-03-09 thru 2023-04-05
1x Audio dev will work on 4 tasks (247% load) starting 2023-03-09 thru 2023-04-05
..............|...==========............................................................................
Salvage - Vehicle Munching
- EU PU Gameplay Feature Team
1x Engineering dev working on 3 tasks (119% load) thru 2023-03-01
1x Engineering dev working on 3 tasks (119% load) thru 2023-03-01
....==========|===..=====...............................................................................
Seated Item Handling
- Actor Feature Team
2x Animation devs working on 9 tasks (58% load) thru 2023-05-14
2x Animation devs working on 9 tasks (58% load) thru 2023-05-14
==============|===============.========.................................................................
SQ42 - Vehicle Support
- Audio
5x Audio devs working on 14 tasks (52% load) thru 2023-04-05
5x Audio devs working on 14 tasks (52% load) thru 2023-04-05
==============|=============............................................................................
- Vehicle Content - EU
4x Design devs working on 12 tasks (68% load) thru 2023-03-16
4x Design devs working on 12 tasks (68% load) thru 2023-03-16
..............|...........======================....======================..............................
==============|=======....======================....======================..............................
- Vehicle Content - US
1x Design dev working on 12 tasks (120% load) thru 2023-03-17
1x Design dev working on 12 tasks (120% load) thru 2023-03-17
==============|=======..................................................................................
==============|...........====~~~~================......................................................
- Vehicle Feature Team
9x Engineering devs working on 7 tasks (19% load) thru 2023-03-16
9x Engineering devs working on 7 tasks (19% load) thru 2023-03-16
==============|=======..=========================.......................................................
..............|.........=========================.......................................................
- Weapon Content Team
5x Art devs working on 12 tasks (48% load) thru 2023-04-05
5x Art devs working on 12 tasks (48% load) thru 2023-04-05
..============|=============............................................................................
StarWords Improvements
- Tools Team
2x Engineering devs working on 13 tasks (64% load) thru 2023-03-26
2x Engineering devs working on 13 tasks (64% load) thru 2023-03-26
==============|==========...............................................................................
TestRunner Improvements
- Tools Team
3x Engineering devs working on 7 tasks (46% load) thru 2023-03-26
3x Engineering devs working on 7 tasks (46% load) thru 2023-03-26
==============|==========...............................................................................
Third Person Camera V2
- Vehicle Feature Team
1x Design dev working on 4 tasks (163% load) thru 2023-03-16
1x Design dev working on 4 tasks (163% load) thru 2023-03-16
........======|=======..................................................................................
Time Trial Race Missions
(Scheduled work ending soon!)
- Mission Feature Team
1x Design dev working on 4 tasks (119% load) thru 2023-03-01
1x Design dev working on 4 tasks (119% load) thru 2023-03-01
==============|===......................................................................................
Unannounced Vehicle
- Vehicle Content - US
3x Art devs working on 7 tasks (53% load) thru 2023-03-17
3x Art devs working on 7 tasks (53% load) thru 2023-03-17
..............|...............~~~~......................................................................
==============|=======....~~~~~~~~~~~~~~~~~~~~~~~~......................................................
Unannounced Vehicle
- Vehicle Content - EU
2x Art devs working on 9 tasks (142% load) thru 2023-02-23
2x Art devs working on 9 tasks (142% load) thru 2023-02-23
==============|=........................................................................................
========......|.........................................................................................
- Vehicle Content - US
2x Tech Content devs working on 3 tasks (100% load) thru 2023-03-17
2x Tech Content devs working on 3 tasks (100% load) thru 2023-03-17
..............|=======..................................................................................
Vehicle Tractor Beams
- EU PU Gameplay Feature Team
2x Engineering devs working on 12 tasks (60% load) thru 2023-06-19
1x Design dev working on 5 tasks (72% load) thru 2023-03-28
2x Engineering devs working on 12 tasks (60% load) thru 2023-06-19
1x Design dev working on 5 tasks (72% load) thru 2023-03-28
==============|==================================.......................................................
....~~~~~~~~~~|~====~~~~~...............................................................................
VOLT Fresnel
(Scheduled work ending soon!)
- Weapon Content Team
2x Art devs working on 2 tasks (128% load) thru 2023-02-22
2x Art devs working on 2 tasks (128% load) thru 2023-02-22
======....====|=........................................................................................
Weapon Misfire & Wear
- Weapon Feature Team
3x Engineering devs working on 13 tasks (41% load) thru 2023-06-29
3x Engineering devs working on 13 tasks (41% load) thru 2023-06-29
==============|===============.=====================....................................................
The following deliverables are scheduled to begin (or continue) work within two weeks
AR and Map Marker System Rework
- SQ42 UI Feature Team
1x Design dev will work on 1 task (128% load) starting 2023-02-27 thru 2023-03-12
1x Design dev will work on 1 task (128% load) starting 2023-02-27 thru 2023-03-12
..............|.=====...................................................................................
Chapter 02
- SQ42 Character Art
2x Art devs will work on 2 tasks (50% load) starting 2023-02-26 thru 2023-03-23
2x Art devs will work on 2 tasks (50% load) starting 2023-02-26 thru 2023-03-23
..............|.~~~~====................................................................................
Chapter 06
- SQ42 UI Feature Team
1x Design dev will work on 1 task (128% load) starting 2023-02-27 thru 2023-03-12
1x Design dev will work on 1 task (128% load) starting 2023-02-27 thru 2023-03-12
..............|.=====...................................................................................
Chapter 07
(Scheduled work ending soon!)
- SQ42 Character Art
2x Art devs will work on 1 task (38% load) starting 2023-02-26 thru 2023-03-09
2x Art devs will work on 1 task (38% load) starting 2023-02-26 thru 2023-03-09
..............|.~~~~....................................................................................
Chapter 09
(Scheduled work ending soon!)
- SQ42 Character Art
2x Art devs will work on 1 task (38% load) starting 2023-02-26 thru 2023-03-09
2x Art devs will work on 1 task (38% load) starting 2023-02-26 thru 2023-03-09
..............|.~~~~....................................................................................
Chapter 22
- SQ42 Character Art
1x Art dev will work on 1 task (76% load) starting 2023-02-26 thru 2023-03-09
1x Art dev will work on 1 task (76% load) starting 2023-02-26 thru 2023-03-09
====..........|.~~~~....................................................................................
MFD Rework
- SQ42 UI Feature Team
1x Art dev will work on 1 task (128% load) starting 2023-02-27 thru 2023-03-12
1x Art dev will work on 1 task (128% load) starting 2023-02-27 thru 2023-03-12
..............|.=====...................................................................................
Quantum Travel Experience
- SQ42 UI Feature Team
1x Design dev will work on 1 task (128% load) starting 2023-02-27 thru 2023-03-12
1x Design dev will work on 1 task (128% load) starting 2023-02-27 thru 2023-03-12
..............|.=====...................................................................................
Unannounced Vehicle
(Starting soon!)
- Vehicle Content - EU
2x Design devs will work on 4 tasks (185% load) starting 2023-02-26 thru 2023-03-16
5x Art devs will work on 4 tasks (74% load) starting 2023-02-26 thru 2023-03-16
2x Design devs will work on 4 tasks (185% load) starting 2023-02-26 thru 2023-03-16
5x Art devs will work on 4 tasks (74% load) starting 2023-02-26 thru 2023-03-16
..............|.======....======================........................................................
..............|.======....======================....======================..............................
Unannounced Vehicle
- Audio
2x Audio devs will work on 5 tasks (154% load) starting 2023-03-09 thru 2023-04-05
2x Audio devs will work on 5 tasks (154% load) starting 2023-03-09 thru 2023-04-05
..............|...==========............................................................................