Scheduled Deliverables
as of 2022-12-21
There are currently 41 scheduled deliverables being worked on by 30 teams
29 deliverables are scheduled to begin work by 13 team(s) within two weeks
This report lists the actively assigned deliverables and the associated teams, along with the number of developers assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.
The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.
The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.
extra analysis (click me)
There are approximately 255 devs (out of ~512, or 50%) with 531 assignments scheduled to work on 41 observable deliverables. Of those deliverables, 41% are for SQ42 exclusively, with ~187 devs (37%) scheduled for approximately 2746 man-days. 27% of deliverables are shared between both projects.
25 deliverable(s) are not currently scheduled to continue work after this sprint:
- AI - Untrained Combat
- Arena Commander: Classic Race Mode Overhaul
- Chapter 01
- Chapter 02
- Chapter 05
- Chapter 07
- Chapter 11
- Chapter 12
- Chapter 14
- Chapter 16
- Chapter 17
- Chapter 18
- Chapter 19
- Chapter 22
- Chapter 24
- Chapter 26
- Chapter 27
- Character Work
- Derelict Spaceships - Points of Interest
- EVA T2
- Frontier Clothing
- FS-Tech-Anim - Asset Integration
- Satellites - Points of Interest
- StarWords Improvements
- Zero G Push & Pull
- Actor Feature Team
5% part-time with 129 task(s) scheduled, 53% of which are for SQ42 - Actor Tech Team
full-time with 31 task(s) scheduled, 50% of which are for SQ42 - AI Content Team
27% part-time with 49 task(s) scheduled, 60% of which are for SQ42 - AI Tech and Feature Team
30% part-time with 30 task(s) scheduled, 60% of which are for SQ42 - Arena Commander Feature Team
11% part-time with 79 task(s) scheduled, 33% of which are for SQ42 - Audio
full-time with 25 task(s) scheduled, 50% of which are for SQ42 - Editor Team
full-time with 9 task(s) scheduled, 50% of which are for SQ42 - Engine Team
full-time with 16 task(s) scheduled, 50% of which are for SQ42 - EU Landing Zone 1
19% part-time with 32 task(s) scheduled, 50% of which are for SQ42 - Facial Animation
full-time with 33 task(s) scheduled, all of which are for SQ42 - Game Services Team
29% part-time with 41 task(s) scheduled, all of which are for SC - Graphics Team
full-time with 36 task(s) scheduled, 50% of which are for SQ42 - Location Concept Art
full-time with 57 task(s) scheduled, all of which are for SC - Mission Feature Team
7% part-time with 43 task(s) scheduled, 22% of which are for SQ42 - Motion Capture Team
5% part-time with 40 task(s) scheduled, all of which are for SQ42 - Narrative
33% part-time with 27 task(s) scheduled, 43% of which are for SQ42 - Network Team
full-time with 14 task(s) scheduled, all of which are for SC - Persistent Tech Team
full-time with 20 task(s) scheduled, all of which are for SC - Physics Team
full-time with 9 task(s) scheduled, 50% of which are for SQ42 - SC Character Art
full-time with 29 task(s) scheduled, all of which are for SC - SQ42 Art
10% part-time with 170 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 1 - FPS
full-time with 30 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 2 - Flight
full-time with 21 task(s) scheduled, all of which are for SQ42 - SQ42 UI Feature Team
full-time with 22 task(s) scheduled, 50% of which are for SQ42 - Tech Animation Team
35% part-time with 62 task(s) scheduled, 80% of which are for SQ42 - Tools Team
full-time with 30 task(s) scheduled, 50% of which are for SQ42 - US PU Gameplay Feature Team
22% part-time with 27 task(s) scheduled, 50% of which are for SQ42 - Vehicle Content - US
full-time with 63 task(s) scheduled, 50% of which are for SQ42 - Vehicle Feature Team
full-time with 11 task(s) scheduled, 50% of which are for SQ42 - Weapon Content Team
full-time with 21 task(s) scheduled, 67% of which are for SQ42 - Weapon Feature Team
8% part-time with 53 task(s) scheduled, 50% of which are for SQ42
AI - Untrained Combat
(Scheduled work ending soon!)
- AI Tech and Feature Team
2x Engineering devs working on 13 tasks (134% load) thru 2022-12-29
2x Engineering devs working on 13 tasks (134% load) thru 2022-12-29
..........==============............============................============..........................|.
..................................................................................====================|=
Arena Commander: Classic Race Mode Overhaul
(Scheduled work ending soon!)
- Arena Commander Feature Team
1x Design dev working on 15 tasks (141% load) thru 2022-12-22
1x Engineering dev working on 15 tasks (141% load) thru 2022-12-22
1x Design dev working on 15 tasks (141% load) thru 2022-12-22
1x Engineering dev working on 15 tasks (141% load) thru 2022-12-22
........................................................====================~~~~~~====================|=
........................................................====================~~~~~~====================|=
Artificial Gravity
- Narrative
1x Design dev working on 5 tasks (116% load) thru 2022-12-30
1x Design dev working on 5 tasks (116% load) thru 2022-12-30
..............................................................................................~~~~~~~~|~
- EU PU Gameplay Feature Team
1x Engineering dev will work on 4 tasks (60% load) starting 2023-01-04 thru 2023-03-01
1x Design dev will work on 4 tasks (119% load) starting 2023-01-04 thru 2023-03-01
1x Engineering dev will work on 4 tasks (60% load) starting 2023-01-04 thru 2023-03-01
1x Design dev will work on 4 tasks (119% load) starting 2023-01-04 thru 2023-03-01
..............................................................................~~~~~~~~~~~~~~~~~...~~~~|.
..............................................................................=================...====|.
Bounty Hunter V2
- Mission Feature Team
3x Design devs working on 12 tasks (34% load) thru 2022-12-22
↳ will continue 2023-01-04 with 3x devs
2x Engineering devs will work on 5 tasks (74% load) starting 2023-01-04 thru 2023-03-01
3x Design devs working on 12 tasks (34% load) thru 2022-12-22
↳ will continue 2023-01-04 with 3x devs
2x Engineering devs will work on 5 tasks (74% load) starting 2023-01-04 thru 2023-03-01
....................................................====~~~~~~~~~~~~~~~~~~~~==========================|=
............................................................................==================........|.
- Narrative
2x Design devs working on 1 task (38% load) thru 2022-12-30
2x Design devs working on 1 task (38% load) thru 2022-12-30
............................................~~~~....~~~~..........................................====|=
- EU Landing Zone 2
2x Art devs will work on 7 tasks (50% load) starting 2023-01-04 thru 2023-03-28
2x Art devs will work on 7 tasks (50% load) starting 2023-01-04 thru 2023-03-28
..............................................................................................~~~~~~~~|.
- US PU Gameplay Feature Team
2x Art devs will work on 2 tasks (67% load) starting 2023-01-01 thru 2023-01-26
2x Art devs will work on 2 tasks (67% load) starting 2023-01-01 thru 2023-01-26
......=========...=====...~~~~....................................................============........|.
Bug Fixing & Tech Debt
- AI Content Team
7x Design devs working on 15 tasks (325% load) thru 2022-12-29
7x Design devs working on 15 tasks (325% load) thru 2022-12-29
..............======....................====................====....====..............................|.
......======..======............====....====..........................................................|=
- AI Tech and Feature Team
10x Engineering devs working on 8 tasks (16% load) thru 2022-12-29
10x Engineering devs working on 8 tasks (16% load) thru 2022-12-29
..............====~~~~~~................====~~~~........========....============..====================|=
- Arena Commander Feature Team
2x Design devs working on 21 tasks (63% load) thru 2022-12-22
2x Design devs working on 21 tasks (63% load) thru 2022-12-22
..======================....================================================~~~~~~====================|=
..~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~~~~~~~~~..............................................|.
- Engine Team
5x Engineering devs working on 16 tasks (213% load) thru 2022-12-29
5x Engineering devs working on 16 tasks (213% load) thru 2022-12-29
.~================~~~~~~~~~.================~~~~~~~~~~~~~~=====================...................====|=
- Graphics Team
10x Engineering devs working on 30 tasks (250% load) thru 2022-12-25
2x Tech Content devs working on 6 tasks (250% load) thru 2022-12-25
10x Engineering devs working on 30 tasks (250% load) thru 2022-12-25
2x Tech Content devs working on 6 tasks (250% load) thru 2022-12-25
....................=======...................========................=========...................====|=
....................~~~~~~~...................========................=========...................====|=
- Mission Feature Team
4x Engineering devs working on 5 tasks (43% load) thru 2022-12-22
3x Design devs working on 4 tasks (65% load) thru 2022-12-22
↳ will continue 2023-01-04 with 3x devs
4x Engineering devs working on 5 tasks (43% load) thru 2022-12-22
3x Design devs working on 4 tasks (65% load) thru 2022-12-22
↳ will continue 2023-01-04 with 3x devs
............................................................==================..........==============|=
............................................................................................==========|=
- Physics Team
4x Engineering devs working on 9 tasks (188% load) thru 2022-12-25
4x Engineering devs working on 9 tasks (188% load) thru 2022-12-25
..====================================================..................========..................====|=
- Tools Team
5x Engineering devs working on 8 tasks (33% load) thru 2022-12-29
5x Engineering devs working on 8 tasks (33% load) thru 2022-12-29
..============================================~~~~~~~~~~~~=====================...====================|=
- US PU Gameplay Feature Team
5x Engineering devs working on 13 tasks (104% load) thru 2022-12-22
5x Design devs working on 10 tasks (104% load) thru 2022-12-22
↳ will continue 2023-01-01 with 5x devs
4x Art devs working on 4 tasks (52% load) thru 2022-12-22
5x Engineering devs working on 13 tasks (104% load) thru 2022-12-22
5x Design devs working on 10 tasks (104% load) thru 2022-12-22
↳ will continue 2023-01-01 with 5x devs
4x Art devs working on 4 tasks (52% load) thru 2022-12-22
..................~~~~~~~~~...................====....................~~~~~~~~................~~~~~~~~|~
..............========~~~~~...................====....................========................========|=
..................====~~~~~...................====....................========................========|=
- Vehicle Content - US
3x Tech Content devs working on 9 tasks (263% load) thru 2022-12-30
3x Tech Content devs working on 9 tasks (263% load) thru 2022-12-30
....====........========....................========..==================............................==|=
....................====..............................................................................|.
- Vehicle Feature Team
2x Design devs will work on 1 task (60% load) starting 2023-01-05 thru 2023-01-19
2x Design devs will work on 1 task (60% load) starting 2023-01-05 thru 2023-01-19
..........................======..............................................======..................|.
Building Interiors
- Location Concept Art
7x Art devs working on 26 tasks (35% load) thru 2022-12-30
7x Art devs working on 26 tasks (35% load) thru 2022-12-30
......................................================================================================|=
- MTL Sandbox 1
14x Art devs will work on 41 tasks (28% load) starting 2023-01-04 thru 2023-06-29
4x Design devs will work on 23 tasks (54% load) starting 2023-01-04 thru 2023-06-29
14x Art devs will work on 41 tasks (28% load) starting 2023-01-04 thru 2023-06-29
4x Design devs will work on 23 tasks (54% load) starting 2023-01-04 thru 2023-06-29
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~============........======================..======================..|.
..~~~~~~~~~~~~~~~~~~~~~...............................======================..======================..|.
Chapter 01
(Scheduled work ending soon!)
- SQ42 Art
12x Art devs working on 13 tasks (50% load) thru 2022-12-30
12x Art devs working on 13 tasks (50% load) thru 2022-12-30
..................................................................==============..............========|=
Chapter 02
(Scheduled work ending soon!)
- SQ42 Art
4x Art devs working on 11 tasks (36% load) thru 2022-12-30
4x Art devs working on 11 tasks (36% load) thru 2022-12-30
......................................................==========================......~~~~~~~~====~~~~|~
Chapter 05
(Scheduled work ending soon!)
- SQ42 Art
7x Art devs working on 20 tasks (36% load) thru 2022-12-30
7x Art devs working on 20 tasks (36% load) thru 2022-12-30
..................................................................====================================|=
- Tech Animation Team
4x Tech Content devs working on 12 tasks (45% load) thru 2022-12-22
4x Tech Content devs working on 12 tasks (45% load) thru 2022-12-22
..................................................................................~~~~~~~~~~~~~~~~====|=
Chapter 07
(Scheduled work ending soon!)
- SQ42 Art
3x Art devs working on 8 tasks (202% load) thru 2022-12-30
3x Art devs working on 8 tasks (202% load) thru 2022-12-30
......................................................................................======......====|=
- SQ42 Level Design 2 - Flight
4x Design devs working on 7 tasks (32% load) thru 2022-12-30
4x Design devs working on 7 tasks (32% load) thru 2022-12-30
.~~~~~~~..============~~~~~~..................................................========================|=
Chapter 11
(Scheduled work ending soon!)
- SQ42 Level Design 2 - Flight
3x Design devs working on 3 tasks (46% load) thru 2022-12-30
3x Design devs working on 3 tasks (46% load) thru 2022-12-30
.~~~~~~~......................................................................................========|=
Chapter 12
(Scheduled work ending soon!)
- Motion Capture Team
1x Animation dev working on 4 tasks (303% load) thru 2022-12-30
1x Animation dev working on 4 tasks (303% load) thru 2022-12-30
..................................................................................................====|=
Chapter 14
(Scheduled work ending soon!)
- Narrative
2x Design devs working on 4 tasks (152% load) thru 2022-12-30
2x Design devs working on 4 tasks (152% load) thru 2022-12-30
................................====..............................................................====|=
- SQ42 Art
11x Art devs working on 51 tasks (44% load) thru 2022-12-30
11x Art devs working on 51 tasks (44% load) thru 2022-12-30
......................................................================================================|=
..........................========....................==========================......................|.
- SQ42 Level Design 1 - FPS
7x Design devs working on 3 tasks (20% load) thru 2022-12-30
7x Design devs working on 3 tasks (20% load) thru 2022-12-30
.=====================~~~~~~~~==================================================..............========|=
- Tech Animation Team
1x Tech Content dev working on 4 tasks (513% load) thru 2022-12-22
1x Tech Content dev working on 4 tasks (513% load) thru 2022-12-22
..................................................................................................====|=
Chapter 16
(Scheduled work ending soon!)
- SQ42 Level Design 1 - FPS
2x Design devs working on 2 tasks (76% load) thru 2022-12-30
2x Design devs working on 2 tasks (76% load) thru 2022-12-30
..................................................................................................====|=
- SQ42 Level Design 2 - Flight
2x Design devs working on 2 tasks (76% load) thru 2022-12-30
2x Design devs working on 2 tasks (76% load) thru 2022-12-30
..................................................................................................====|=
Chapter 17
(Scheduled work ending soon!)
- SQ42 Art
2x Art devs working on 15 tasks (71% load) thru 2022-12-30
2x Art devs working on 15 tasks (71% load) thru 2022-12-30
......................................................================================================|=
- SQ42 Level Design 1 - FPS
1x Design dev working on 2 tasks (152% load) thru 2022-12-30
1x Design dev working on 2 tasks (152% load) thru 2022-12-30
..==========......................................................................................====|=
Chapter 18
(Scheduled work ending soon!)
- SQ42 Art
4x Art devs working on 21 tasks (95% load) thru 2022-12-30
4x Art devs working on 21 tasks (95% load) thru 2022-12-30
..............................................................................========================|=
Chapter 19
(Scheduled work ending soon!)
- SQ42 Art
6x Art devs working on 9 tasks (26% load) thru 2022-12-30
6x Art devs working on 9 tasks (26% load) thru 2022-12-30
..................................................................==============......~~~~~~~~========|=
- SQ42 Level Design 1 - FPS
5x Design devs working on 11 tasks (31% load) thru 2022-12-30
5x Design devs working on 11 tasks (31% load) thru 2022-12-30
......~~~~~~~~~~~~~~~~~~~~~~..............============................================================|=
Chapter 22
(Scheduled work ending soon!)
- SQ42 Art
2x Art devs working on 7 tasks (91% load) thru 2022-12-30
2x Art devs working on 7 tasks (91% load) thru 2022-12-30
..............................................................................==============..........|.
......................................................................................================|=
- SQ42 Level Design 1 - FPS
10x Design devs working on 9 tasks (13% load) thru 2022-12-30
10x Design devs working on 9 tasks (13% load) thru 2022-12-30
......================~~~~~~..............============................================================|=
- SQ42 Level Design 2 - Flight
2x Design devs working on 3 tasks (69% load) thru 2022-12-30
2x Design devs working on 3 tasks (69% load) thru 2022-12-30
..............................................................................................========|=
Chapter 24
(Scheduled work ending soon!)
- SQ42 Level Design 2 - Flight
2x Design devs working on 3 tasks (69% load) thru 2022-12-30
2x Design devs working on 3 tasks (69% load) thru 2022-12-30
..............................................................................................========|=
Chapter 26
(Scheduled work ending soon!)
- SQ42 Level Design 1 - FPS
9x Design devs working on 3 tasks (15% load) thru 2022-12-30
9x Design devs working on 3 tasks (15% load) thru 2022-12-30
.===========================..............============................==========..............========|=
Chapter 27
(Scheduled work ending soon!)
- Narrative
1x Design dev working on 4 tasks (303% load) thru 2022-12-30
1x Design dev working on 4 tasks (303% load) thru 2022-12-30
..................................................................................................====|=
- SQ42 Level Design 2 - Flight
3x Design devs working on 3 tasks (46% load) thru 2022-12-30
3x Design devs working on 3 tasks (46% load) thru 2022-12-30
..............................................................................................========|=
Character Work
(Scheduled work ending soon!)
- Actor Feature Team
1x Engineering dev working on 6 tasks (109% load) thru 2022-12-30
1x Engineering dev working on 6 tasks (109% load) thru 2022-12-30
..............................................................==========......========================|=
..................................................................................==========..........|.
- AI Content Team
6x Animation devs working on 21 tasks (72% load) thru 2022-12-29
6x Animation devs working on 21 tasks (72% load) thru 2022-12-29
..======================....====================........================..........====================|=
..................======....................====......................................................|.
- AI Tech and Feature Team
1x Design dev working on 9 tasks (93% load) thru 2022-12-29
1x Design dev working on 9 tasks (93% load) thru 2022-12-29
..==========................========....................========......................................|.
..................................................................................~~~~~~~~~~~~~~~~~~~~|~
- Audio
6x Audio devs working on 9 tasks (227% load) thru 2022-12-22
6x Audio devs working on 9 tasks (227% load) thru 2022-12-22
....================..........================================================================......==|=
- Facial Animation
9x Animation devs working on 33 tasks (66% load) thru 2022-12-30
9x Animation devs working on 33 tasks (66% load) thru 2022-12-30
....==========================================~~~~~~~~~~==============================================|=
- Motion Capture Team
9x Animation devs working on 36 tasks (47% load) thru 2022-12-30
9x Animation devs working on 36 tasks (47% load) thru 2022-12-30
......=========.......====~~~~~~~~~~~~~~~~........................========~~~~~~~~====================|=
- Tech Animation Team
11x Tech Content devs working on 41 tasks (62% load) thru 2022-12-22
11x Tech Content devs working on 41 tasks (62% load) thru 2022-12-22
..........~~~~~~~~~~~~~~~~~...~~~~=====...~~~~========~~~~~~~~=============...========================|=
Cutting T2
- Weapon Feature Team
1x Engineering dev working on 6 tasks (109% load) thru 2022-12-30
↳ will continue 2023-01-05 with 1x dev
1x Engineering dev working on 6 tasks (109% load) thru 2022-12-30
↳ will continue 2023-01-05 with 1x dev
..............................................................................========================|=
Derelict Spaceships - Points of Interest
(Scheduled work ending soon!)
- Audio
4x Audio devs working on 2 tasks (76% load) thru 2022-12-22
4x Audio devs working on 2 tasks (76% load) thru 2022-12-22
..............................~~~~~~~~~~~~~~~~~~~~~~~~~~~~==......==========................======..==|=
Distortion Propagation
(Recently started!)
- Weapon Content Team
1x Art dev working on 5 tasks (758% load) thru 2022-12-22
1x Art dev working on 5 tasks (758% load) thru 2022-12-22
....................................................................................................==|=
Dynamic Events
- Mission Feature Team
4x Engineering devs working on 8 tasks (37% load) thru 2022-12-22
↳ will continue 2023-01-04 with 4x devs
9x Design devs working on 3 tasks (43% load) thru 2022-12-22
↳ will continue 2023-01-04 with 9x devs
4x Engineering devs working on 8 tasks (37% load) thru 2022-12-22
↳ will continue 2023-01-04 with 4x devs
9x Design devs working on 3 tasks (43% load) thru 2022-12-22
↳ will continue 2023-01-04 with 9x devs
..========================..................................................==========================|=
..================================================..~~~~~~~~~~~~~~~~~~~~~~~~~~....................====|=
EVA T2
(Scheduled work ending soon!)
- Actor Tech Team
2x Engineering devs working on 9 tasks (93% load) thru 2022-12-29
2x Engineering devs working on 9 tasks (93% load) thru 2022-12-29
............................====================~~~~~~~~~~====================....====================|=
Freight Elevators
- Audio
1x Audio dev working on 4 tasks (606% load) thru 2022-12-22
1x Audio dev working on 4 tasks (606% load) thru 2022-12-22
............................................................................................======..==|=
- US PU Gameplay Feature Team
2x Engineering devs will work on 10 tasks (124% load) starting 2023-01-01 thru 2023-03-09
2x Engineering devs will work on 10 tasks (124% load) starting 2023-01-01 thru 2023-03-09
..............................................................................~~~~~~~~~~~~~~~~........|.
Frontier Clothing
(Scheduled work ending soon!)
- SC Character Art
15x Art devs working on 29 tasks (40% load) thru 2022-12-29
15x Art devs working on 29 tasks (40% load) thru 2022-12-29
.=================================================....========================....====================|=
FS-Tech-Anim - Asset Integration
(Scheduled work ending soon!)
- Tech Animation Team
7x Tech Content devs working on 5 tasks (44% load) thru 2022-12-22
7x Tech Content devs working on 5 tasks (44% load) thru 2022-12-22
..=========...................=====...=====.......=====...........=========...................========|=
Miscellaneous Support
- Actor Feature Team
3x Design devs working on 31 tasks (46% load) thru 2022-12-30
↳ will continue 2023-01-05 with 3x devs
2x Engineering devs working on 27 tasks (60% load) thru 2022-12-30
↳ will continue 2023-01-05 with 2x devs
4x Animation devs working on 31 tasks (35% load) thru 2022-12-30
↳ will continue 2023-01-05 with 4x devs
3x Design devs working on 31 tasks (46% load) thru 2022-12-30
↳ will continue 2023-01-05 with 3x devs
2x Engineering devs working on 27 tasks (60% load) thru 2022-12-30
↳ will continue 2023-01-05 with 2x devs
4x Animation devs working on 31 tasks (35% load) thru 2022-12-30
↳ will continue 2023-01-05 with 4x devs
..==============================================~~~~~~~~~~============================================|=
..==============================================~~~~~~~~~~============================================|=
..==============================================~~~~~~~~~~============================================|=
..==========================..........................................................................|.
- Actor Tech Team
5x Engineering devs working on 13 tasks (53% load) thru 2022-12-29
5x Engineering devs working on 13 tasks (53% load) thru 2022-12-29
..~~~~~~~~~~~~~~~~~~~~======~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~====================....====================|=
- AI Content Team
2x Tech Content devs working on 13 tasks (67% load) thru 2022-12-29
2x Tech Content devs working on 13 tasks (67% load) thru 2022-12-29
..~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~........~~~~~~~~~~~~~~~~~~~~~~~~..~~~~~~~~~~~~~~~~~~~~|~
..................======....................====......................................................|.
- Arena Commander Feature Team
3x Engineering devs working on 28 tasks (42% load) thru 2022-12-22
3x Engineering devs working on 28 tasks (42% load) thru 2022-12-22
........................================================..............................................|.
....====================~~~~================================================~~~~~~====================|=
- Audio
6x Audio devs working on 5 tasks (126% load) thru 2022-12-22
6x Audio devs working on 5 tasks (126% load) thru 2022-12-22
................................................................................==================..==|=
- Editor Team
1x Design dev working on 9 tasks (185% load) thru 2022-12-29
1x Design dev working on 9 tasks (185% load) thru 2022-12-29
..============================================~~~~~~~~~~~~=====================...====================|=
......................................................~~~~=====...=========.......========....========|.
- Narrative
1x Design dev working on 9 tasks (163% load) thru 2022-12-30
1x Design dev working on 9 tasks (163% load) thru 2022-12-30
..............................................................................========================|=
- SQ42 UI Feature Team
3x Engineering devs working on 6 tasks (85% load) thru 2022-12-29
3x Art devs working on 12 tasks (606% load) thru 2022-12-29
1x Design dev working on 4 tasks (606% load) thru 2022-12-29
3x Engineering devs working on 6 tasks (85% load) thru 2022-12-29
3x Art devs working on 12 tasks (606% load) thru 2022-12-29
1x Design dev working on 4 tasks (606% load) thru 2022-12-29
..............................................................................................========|=
........................................................................========......................|=
......................................................................................................|=
- Tools Team
2x Engineering devs working on 9 tasks (93% load) thru 2022-12-29
2x Engineering devs working on 9 tasks (93% load) thru 2022-12-29
..============================================~~~~~~~~~~~~=====================...====================|=
- Vehicle Feature Team
13x Engineering devs working on 9 tasks (89% load) thru 2022-12-22
3x Design devs working on 2 tasks (85% load) thru 2022-12-22
13x Engineering devs working on 9 tasks (89% load) thru 2022-12-22
3x Design devs working on 2 tasks (85% load) thru 2022-12-22
..............======================================..==========================..................====|=
..............................======================..............................................====|=
- Weapon Feature Team
5x Design devs working on 43 tasks (38% load) thru 2022-12-30
↳ will continue 2023-01-05 with 5x devs
2x Engineering devs working on 4 tasks (152% load) thru 2022-12-30
5x Design devs working on 43 tasks (38% load) thru 2022-12-30
↳ will continue 2023-01-05 with 5x devs
2x Engineering devs working on 4 tasks (152% load) thru 2022-12-30
..==============================================~~~~~~~~~~============================================|=
..........................................................................======..................====|=
- Systemic Services and Tools Team
4x Engineering devs will work on 8 tasks (48% load) starting 2023-01-04 thru 2023-03-14
4x Engineering devs will work on 8 tasks (48% load) starting 2023-01-04 thru 2023-03-14
..............................................................................======================..|.
New Player Experience
- Narrative
1x Design dev working on 4 tasks (93% load) thru 2022-12-30
1x Design dev working on 4 tasks (93% load) thru 2022-12-30
........................................................====================......==========..~~~~~~~~|~
- US PU Gameplay Feature Team
1x Engineering dev will work on 7 tasks (174% load) starting 2023-01-01 thru 2023-03-09
1x Engineering dev will work on 7 tasks (174% load) starting 2023-01-01 thru 2023-03-09
..............................................................................================........|.
Persistent Streaming and Server Meshing
- Game Services Team
10x Engineering devs working on 41 tasks (33% load) thru 2022-12-29
10x Engineering devs working on 41 tasks (33% load) thru 2022-12-29
..====================~~~~~~~~================================================~~~~~~~~~~~~~~~~~~~~~~~~|~
- Mission Feature Team
3x Engineering devs working on 5 tasks (58% load) thru 2022-12-22
↳ will continue 2023-01-04 with 3x devs
3x Engineering devs working on 5 tasks (58% load) thru 2022-12-22
↳ will continue 2023-01-04 with 3x devs
.~========================~~~~~~~~~~~~~~~~~~~~~~~~......................................==============|=
- Network Team
9x Engineering devs working on 14 tasks (15% load) thru 2022-12-30
9x Engineering devs working on 14 tasks (15% load) thru 2022-12-30
..=====.......============....................========================================================|=
- Persistent Tech Team
4x Engineering devs working on 20 tasks (47% load) thru 2022-12-30
4x Engineering devs working on 20 tasks (47% load) thru 2022-12-30
..====================~~~~~~~~========================================================================|=
- Vehicle Feature Team
5x Engineering devs will work on 5 tasks (24% load) starting 2023-01-05 thru 2023-03-16
5x Engineering devs will work on 5 tasks (24% load) starting 2023-01-05 thru 2023-03-16
......................................==============..==============================================..|.
Player/Machine Physical Interaction
- Actor Feature Team
1x Engineering dev working on 6 tasks (109% load) thru 2022-12-30
↳ will continue 2023-01-05 with 1x dev
1x Animation dev working on 9 tasks (163% load) thru 2022-12-30
↳ will continue 2023-01-05 with 1x dev
1x Engineering dev working on 6 tasks (109% load) thru 2022-12-30
↳ will continue 2023-01-05 with 1x dev
1x Animation dev working on 9 tasks (163% load) thru 2022-12-30
↳ will continue 2023-01-05 with 1x dev
..............................................................................========================|=
..............................................................................========================|=
Prone T1
- Actor Feature Team
1x Engineering dev working on 8 tasks (145% load) thru 2022-12-30
↳ will continue 2023-01-05 with 1x dev
1x Animation dev working on 11 tasks (199% load) thru 2022-12-30
↳ will continue 2023-01-05 with 1x dev
1x Engineering dev working on 8 tasks (145% load) thru 2022-12-30
↳ will continue 2023-01-05 with 1x dev
1x Animation dev working on 11 tasks (199% load) thru 2022-12-30
↳ will continue 2023-01-05 with 1x dev
..............................................................................========================|=
..............................................................................========================|=
Resource Management
- Vehicle Content - US
1x Design dev working on 9 tasks (169% load) thru 2022-12-30
1x Art dev working on 11 tasks (167% load) thru 2023-01-20
1x Design dev working on 9 tasks (169% load) thru 2022-12-30
1x Art dev working on 11 tasks (167% load) thru 2023-01-20
................................................................................======================|=
........................................................................................~~~~~~........|.
................................................................................======================|=
- EU PU Gameplay Feature Team
2x Design devs will work on 7 tasks (52% load) starting 2023-01-04 thru 2023-03-01
2x Engineering devs will work on 7 tasks (104% load) starting 2023-01-04 thru 2023-03-01
2x Design devs will work on 7 tasks (52% load) starting 2023-01-04 thru 2023-03-01
2x Engineering devs will work on 7 tasks (104% load) starting 2023-01-04 thru 2023-03-01
..........................~~~~~~~~~~~~~~~~~...~~~~~...~~~~~~~~~~~~~~~~~~..~~~~~~~~~~~~~~~~~~~~~...~~~~|.
..........~~~~~~~~~.......=========================...=========================================...====|.
- Vehicle Content - EU
4x Art devs will work on 11 tasks (62% load) starting 2023-01-01 thru 2023-03-16
4x Art devs will work on 11 tasks (62% load) starting 2023-01-01 thru 2023-03-16
......................................................==============..................................|.
Satellites - Points of Interest
(Scheduled work ending soon!)
- Location Concept Art
2x Art devs working on 31 tasks (281% load) thru 2022-12-30
2x Art devs working on 31 tasks (281% load) thru 2022-12-30
......................................================........................========================|=
SQ42 - Vehicle Support
- Audio
3x Audio devs working on 5 tasks (253% load) thru 2022-12-22
3x Audio devs working on 5 tasks (253% load) thru 2022-12-22
................................................................................==================..==|=
- SQ42 Art
1x Cinematics dev working on 6 tasks (200% load) thru 2022-12-30
1x Art dev working on 9 tasks (163% load) thru 2022-12-30
1x Cinematics dev working on 6 tasks (200% load) thru 2022-12-30
1x Art dev working on 9 tasks (163% load) thru 2022-12-30
..........................................................................................============|=
..............................................................................========================|=
- Vehicle Content - US
1x Design dev working on 15 tasks (151% load) thru 2023-03-17
2x Art devs working on 19 tasks (95% load) thru 2023-03-17
3x Tech Content devs will work on 17 tasks (128% load) starting 2023-01-02 thru 2023-03-17
1x Design dev working on 15 tasks (151% load) thru 2023-03-17
2x Art devs working on 19 tasks (95% load) thru 2023-03-17
3x Tech Content devs will work on 17 tasks (128% load) starting 2023-01-02 thru 2023-03-17
................................====................................................~~~~~~~~==========|.
................................................................................======================|=
................................................................................======================|=
- Weapon Content Team
5x Art devs working on 16 tasks (137% load) thru 2022-12-22
5x Art devs working on 16 tasks (137% load) thru 2022-12-22
........................................................................====........======..==========|=
- Vehicle Content - EU
4x Design devs will work on 12 tasks (68% load) starting 2023-01-01 thru 2023-03-16
4x Design devs will work on 12 tasks (68% load) starting 2023-01-01 thru 2023-03-16
......................................................====================........====================|.
- Vehicle Feature Team
9x Engineering devs will work on 7 tasks (19% load) starting 2023-01-05 thru 2023-03-16
9x Engineering devs will work on 7 tasks (19% load) starting 2023-01-05 thru 2023-03-16
..........................======......======..................................======================..|.
StarWords Improvements
(Scheduled work ending soon!)
- Tools Team
2x Engineering devs working on 13 tasks (134% load) thru 2022-12-29
2x Engineering devs working on 13 tasks (134% load) thru 2022-12-29
..=========...=========...=========...========~~~~~~~~~~~~~...=========...=====...====================|=
Time Trial Race Missions
- Mission Feature Team
1x Design dev working on 6 tasks (111% load) thru 2022-12-22
↳ will continue 2023-01-04 with 1x dev
1x Design dev working on 6 tasks (111% load) thru 2022-12-22
↳ will continue 2023-01-04 with 1x dev
............................................................................==========================|=
Zero G Push & Pull
(Scheduled work ending soon!)
- Actor Tech Team
1x Engineering dev working on 9 tasks (185% load) thru 2022-12-29
1x Engineering dev working on 9 tasks (185% load) thru 2022-12-29
......................................................~~~~====================....====================|=
The following deliverables are scheduled to begin (or continue) work within two weeks
Aerodynamic Control Surfaces
- Vehicle Feature Team
1x Engineering dev will work on 3 tasks (119% load) starting 2023-01-05 thru 2023-02-16
1x Engineering dev will work on 3 tasks (119% load) starting 2023-01-05 thru 2023-02-16
..................................................................==========..======================..|.
Aopoa San’tok.yāi
(Starting soon!)
- Vehicle Content - US
2x Art devs will work on 6 tasks (68% load) starting 2023-01-02 thru 2023-03-17
1x Design dev will work on 6 tasks (135% load) starting 2023-01-02 thru 2023-03-17
2x Art devs will work on 6 tasks (68% load) starting 2023-01-02 thru 2023-03-17
1x Design dev will work on 6 tasks (135% load) starting 2023-01-02 thru 2023-03-17
......................................................................................................|.
......................................................................................................|.
Argo SRV
- Vehicle Content - EU
3x Design devs will work on 3 tasks (93% load) starting 2023-01-01 thru 2023-01-19
4x Art devs will work on 9 tasks (71% load) starting 2023-01-01 thru 2023-02-23
3x Design devs will work on 3 tasks (93% load) starting 2023-01-01 thru 2023-01-19
4x Art devs will work on 9 tasks (71% load) starting 2023-01-01 thru 2023-02-23
................................~~~~~~~~~~~~~~~~~~....======================....~~~~~~..~~~~~~~~~~~~~~|.
................................======================================================================|.
Crusader Spirit
- Vehicle Content - EU
5x Art devs will work on 28 tasks (57% load) starting 2023-01-01 thru 2023-06-15
1x Design dev will work on 3 tasks (278% load) starting 2023-01-01 thru 2023-01-19
5x Art devs will work on 28 tasks (57% load) starting 2023-01-01 thru 2023-06-15
1x Design dev will work on 3 tasks (278% load) starting 2023-01-01 thru 2023-01-19
................................................................................======================|.
................................................................................~~~~~~..~~~~~~~~~~~~~~|.
Jump Points
- EU Sandbox 1
1x Art dev will work on 8 tasks (325% load) starting 2023-01-04 thru 2023-02-14
1x Art dev will work on 8 tasks (325% load) starting 2023-01-04 thru 2023-02-14
..............~~~~~...................====....=======.......................=========.................|.
- Vehicle Feature Team
7x Engineering devs will work on 6 tasks (20% load) starting 2023-01-05 thru 2023-03-16
7x Engineering devs will work on 6 tasks (20% load) starting 2023-01-05 thru 2023-03-16
......=====...........................................................................................|.
Life Support T0
- EU PU Gameplay Feature Team
1x Design dev will work on 9 tasks (134% load) starting 2023-01-04 thru 2023-03-01
1x Engineering dev will work on 6 tasks (89% load) starting 2023-01-04 thru 2023-03-01
1x Design dev will work on 9 tasks (134% load) starting 2023-01-04 thru 2023-03-01
1x Engineering dev will work on 6 tasks (89% load) starting 2023-01-04 thru 2023-03-01
..~~~~~~~~~~~~~~~~~...~~~~~~~~~~~~~~~~~~~~~...~~~~~...~~~~~~~~~~~~~~~~~~..~~~~~~~~~~~~~~~~~~~~~...~~~~|.
..=================...=================...............==================..~~~~~~~~~~~~~~~~~~~~~...~~~~|.
Lockable Containers
- EU PU Gameplay Feature Team
2x Design devs will work on 8 tasks (80% load) starting 2023-01-04 thru 2023-03-28
2x Design devs will work on 8 tasks (80% load) starting 2023-01-04 thru 2023-03-28
..........................=====.......=====...=====...................................................|.
Lorville Cityscape
- MTL Sandbox 1
4x Art devs will work on 17 tasks (85% load) starting 2023-01-04 thru 2023-03-28
4x Art devs will work on 17 tasks (85% load) starting 2023-01-04 thru 2023-03-28
......................................................======================..======================..|.
MFD Rework
- Vehicle Feature Team
9x Engineering devs will work on 3 tasks (13% load) starting 2023-01-05 thru 2023-02-16
9x Engineering devs will work on 3 tasks (13% load) starting 2023-01-05 thru 2023-02-16
......................................................======================..======================..|.
New Interdiction Scenarios
- EU Sandbox 1
1x Design dev will work on 5 tasks (203% load) starting 2023-01-04 thru 2023-02-14
1x Design dev will work on 5 tasks (203% load) starting 2023-01-04 thru 2023-02-14
....................................................=================.......=========.................|.
Origin X1
- Vehicle Feature Team
1x Design dev will work on 2 tasks (119% load) starting 2023-01-05 thru 2023-02-02
1x Design dev will work on 2 tasks (119% load) starting 2023-01-05 thru 2023-02-02
......................................................................................................|.
Outpost Homestead - Independent & Outlaw
- EU Sandbox 1
12x Art devs will work on 27 tasks (67% load) starting 2023-01-04 thru 2023-03-01
4x Design devs will work on 11 tasks (82% load) starting 2023-01-04 thru 2023-03-01
12x Art devs will work on 27 tasks (67% load) starting 2023-01-04 thru 2023-03-01
4x Design devs will work on 11 tasks (82% load) starting 2023-01-04 thru 2023-03-01
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========....===========================...=================...======|.
.~~~~~~~~~~.~~~~~~~~~~~~~~~.~~~~~~..................=====================.............................|.
Persistent Hangars
- US PU Gameplay Feature Team
2x Design devs will work on 8 tasks (82% load) starting 2023-01-01 thru 2023-03-23
2x Design devs will work on 8 tasks (82% load) starting 2023-01-01 thru 2023-03-23
......................................................................................................|.
Player Interaction Experience T0 - Hints & Interactions
- Actor Feature Team
3x Engineering devs will work on 2 tasks (79% load) starting 2023-01-05 thru 2023-01-19
3x Engineering devs will work on 2 tasks (79% load) starting 2023-01-05 thru 2023-01-19
............................................====~~~~~~~~~~==================================..........|.
- US PU Gameplay Feature Team
1x Art dev will work on 7 tasks (174% load) starting 2023-01-01 thru 2023-03-09
1x Art dev will work on 7 tasks (174% load) starting 2023-01-01 thru 2023-03-09
......................................................................................................|.
Player Interaction Experience T2 - Visor HUD & Helmet
- Actor Feature Team
2x Engineering devs will work on 11 tasks (109% load) starting 2023-01-05 thru 2023-03-30
2x Engineering devs will work on 11 tasks (109% load) starting 2023-01-05 thru 2023-03-30
......................................................................................................|.
Pyro Space Stations
- EU Landing Zone 1
14x Art devs will work on 58 tasks (164% load) starting 2023-01-04 thru 2023-02-14
3x Design devs will work on 16 tasks (217% load) starting 2023-01-04 thru 2023-02-14
14x Art devs will work on 58 tasks (164% load) starting 2023-01-04 thru 2023-02-14
3x Design devs will work on 16 tasks (217% load) starting 2023-01-04 thru 2023-02-14
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========....==========================..======..=================...|.
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========....==========================..======......=============...|.
Pyro System, Planet, and Mission Setup
- EU Sandbox 2
5x Art devs will work on 15 tasks (385% load) starting 2023-01-04 thru 2023-01-17
1x Tech Content dev will work on 3 tasks (385% load) starting 2023-01-04 thru 2023-01-17
1x Design dev will work on 3 tasks (385% load) starting 2023-01-04 thru 2023-01-17
5x Art devs will work on 15 tasks (385% load) starting 2023-01-04 thru 2023-01-17
1x Tech Content dev will work on 3 tasks (385% load) starting 2023-01-04 thru 2023-01-17
1x Design dev will work on 3 tasks (385% load) starting 2023-01-04 thru 2023-01-17
......................................................................................................|.
......................................................................................................|.
......................................................................................................|.
Quantum Simulation
- Systemic Services and Tools Team
5x Engineering devs will work on 35 tasks (70% load) starting 2023-01-04 thru 2023-06-19
5x Engineering devs will work on 35 tasks (70% load) starting 2023-01-04 thru 2023-06-19
.=================================================....================================================|.
Quantum Travel Experience
- Vehicle Feature Team
3x Engineering devs will work on 2 tasks (40% load) starting 2023-01-05 thru 2023-02-02
3x Engineering devs will work on 2 tasks (40% load) starting 2023-01-05 thru 2023-02-02
......................................==============..======================..======================..|.
RSI Lynx
- Vehicle Content - EU
3x Art devs will work on 15 tasks (95% load) starting 2023-01-01 thru 2023-03-30
1x Design dev will work on 5 tasks (260% load) starting 2023-01-01 thru 2023-02-02
3x Art devs will work on 15 tasks (95% load) starting 2023-01-01 thru 2023-03-30
1x Design dev will work on 5 tasks (260% load) starting 2023-01-01 thru 2023-02-02
........................................................................................==============|.
........................................................................................============..|.
Salvage - Vehicle Munching
- EU PU Gameplay Feature Team
1x Engineering dev will work on 9 tasks (268% load) starting 2023-01-04 thru 2023-03-01
1x Engineering dev will work on 9 tasks (268% load) starting 2023-01-04 thru 2023-03-01
..................................................................................=============.......|.
Seated Item Handling
(Starting soon!)
- Actor Feature Team
2x Animation devs will work on 9 tasks (58% load) starting 2023-01-05 thru 2023-05-14
2x Animation devs will work on 9 tasks (58% load) starting 2023-01-05 thru 2023-05-14
......................................................................................................|.
Unannounced Vehicle
- Vehicle Concept Art
2x Art devs will work on 7 tasks (127% load) starting 2023-01-01 thru 2023-02-16
2x Art devs will work on 7 tasks (127% load) starting 2023-01-01 thru 2023-02-16
............====......................................................................................|.
Unannounced Vehicle
- Vehicle Content - EU
2x Art devs will work on 9 tasks (142% load) starting 2023-01-01 thru 2023-02-23
1x Design dev will work on 4 tasks (267% load) starting 2023-01-01 thru 2023-01-26
2x Art devs will work on 9 tasks (142% load) starting 2023-01-01 thru 2023-02-23
1x Design dev will work on 4 tasks (267% load) starting 2023-01-01 thru 2023-01-26
................................................................................................======|.
..............................................................................................~~~~~~~~|.
Unannounced Vehicle
- Vehicle Concept Art
1x Art dev will work on 8 tasks (290% load) starting 2023-01-01 thru 2023-02-16
1x Art dev will work on 8 tasks (290% load) starting 2023-01-01 thru 2023-02-16
..........................................................................................====........|.
Unannounced Vehicle
- Vehicle Concept Art
1x Art dev will work on 6 tasks (400% load) starting 2023-01-01 thru 2023-01-26
1x Art dev will work on 6 tasks (400% load) starting 2023-01-01 thru 2023-01-26
..................................................................==............==============........|.
Underground Facilities
- EU Sandbox 2
4x Art devs will work on 3 tasks (96% load) starting 2023-01-04 thru 2023-01-17
3x Design devs will work on 6 tasks (256% load) starting 2023-01-04 thru 2023-01-17
4x Art devs will work on 3 tasks (96% load) starting 2023-01-04 thru 2023-01-17
3x Design devs will work on 6 tasks (256% load) starting 2023-01-04 thru 2023-01-17
.=============================......................=====...................=====.....................|.
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~......................=====...................=====.....................|.
Vehicle Tractor Beams
- EU PU Gameplay Feature Team
2x Engineering devs will work on 12 tasks (60% load) starting 2023-01-04 thru 2023-05-22
2x Engineering devs will work on 12 tasks (60% load) starting 2023-01-04 thru 2023-05-22
..................................................................................................====|.
Weapon Misfire & Wear
- Weapon Feature Team
3x Engineering devs will work on 12 tasks (38% load) starting 2023-01-05 thru 2023-06-29
3x Engineering devs will work on 12 tasks (38% load) starting 2023-01-05 thru 2023-06-29
......................................................................................................|.