Scheduled Deliverables
as of 2022-11-23
There are currently 83 scheduled deliverables being worked on by 43 teams
10 deliverables are scheduled to begin work by 8 team(s) within two weeks
This report lists the actively assigned deliverables and the associated teams, along with the number of developers assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.
The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.
The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.
extra analysis (click me)
There are approximately 428 devs (out of ~512, or 84%) with 906 assignments scheduled to work on 83 observable deliverables. Of those deliverables, 35% are for SQ42 exclusively, with ~348 devs (68%) scheduled for approximately 5083 man-days. 29% of deliverables are shared between both projects.
27 deliverable(s) are not currently scheduled to continue work after this sprint:
- Aciedo Station
- Anvil C8R Pisces
- AR and Map Marker System Rework
- Archon
- Bombs
- Chapter 03
- Chapter 06
- Chapter 08
- Chapter 09
- Chapter 10
- Chapter 15
- Chapter 20
- Chapter 23
- Chapter 25
- Charge/Drain T0
- Gen12 - Renderer T1
- Ladders T1
- New Missions - Orison
- Ocean Shader Improvements
- Physical Damage & Breakability
- Physics - Ropes Simulation
- RaStar
- Ship CPU
- Stanton Fashion Clothing
- Subsumption Editor Integration
- Unannounced Vehicle
- Unified Itemports - FPS
- Actor Feature Team
5% part-time with 127 task(s) scheduled, 53% of which are for SQ42 - Actor Tech Team
full-time with 27 task(s) scheduled, 50% of which are for SQ42 - AI Content Team
22% part-time with 58 task(s) scheduled, 86% of which are for SQ42 - AI Tech and Feature Team
16% part-time with 51 task(s) scheduled, 64% of which are for SQ42 - Arena Commander Feature Team
12% part-time with 75 task(s) scheduled, 33% of which are for SQ42 - Audio
full-time with 40 task(s) scheduled, 33% of which are for SQ42 - Character Tech Art
full-time with 39 task(s) scheduled, 57% of which are for SQ42 - Cinematics Team
90% part-time with 42 task(s) scheduled, all of which are for SQ42 - Editor Team
full-time with 16 task(s) scheduled, 50% of which are for SQ42 - Engine Team
full-time with 16 task(s) scheduled, 33% of which are for SQ42 - EU Landing Zone 2
100% part-time with 5 task(s) scheduled, 50% of which are for SQ42 - EU Sandbox 1
full-time with 18 task(s) scheduled, 50% of which are for SQ42 - Facial Animation
full-time with 26 task(s) scheduled, all of which are for SQ42 - Game Services Team
36% part-time with 33 task(s) scheduled, all of which are for SC - Gameplay Story
98% part-time with 62 task(s) scheduled, 88% of which are for SQ42 - Graphics Team
full-time with 17 task(s) scheduled, 40% of which are for SQ42 - Live Tools Team
71% part-time with 70 task(s) scheduled, 33% of which are for SQ42 - Location Concept Art
full-time with 50 task(s) scheduled, all of which are for SC - Mission Feature Team
11% part-time with 37 task(s) scheduled, 25% of which are for SQ42 - Motion Capture Team
7% part-time with 29 task(s) scheduled, all of which are for SQ42 - MTL Sandbox 1
full-time with 48 task(s) scheduled, all of which are for SC - Narrative
38% part-time with 24 task(s) scheduled, 63% of which are for SQ42 - Network Team
full-time with 13 task(s) scheduled, all of which are for SC - Persistent Tech Team
full-time with 17 task(s) scheduled, all of which are for SC - Physics Team
full-time with 15 task(s) scheduled, 40% of which are for SQ42 - Planet Tech Team
full-time with 6 task(s) scheduled, all of which are for SC - SC Character Art
full-time with 23 task(s) scheduled, all of which are for SC - SQ42 Art
18% part-time with 143 task(s) scheduled, all of which are for SQ42 - SQ42 Character Art
full-time with 33 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 1 - FPS
full-time with 29 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 2 - Flight
full-time with 29 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 3 - Social
22% part-time with 18 task(s) scheduled, all of which are for SQ42 - SQ42 UI Feature Team
full-time with 36 task(s) scheduled, 55% of which are for SQ42 - Systemic Services and Tools Team
full-time with 41 task(s) scheduled, 25% of which are for SQ42 - Tech Animation Team
42% part-time with 43 task(s) scheduled, all of which are for SQ42 - Tools Team
full-time with 26 task(s) scheduled, 50% of which are for SQ42 - UI Tech Team
full-time with 9 task(s) scheduled, 50% of which are for SQ42 - US PU Gameplay Feature Team
26% part-time with 19 task(s) scheduled, 50% of which are for SQ42 - Vehicle Content - EU
full-time with 162 task(s) scheduled, 20% of which are for SQ42 - Vehicle Content - US
16% part-time with 61 task(s) scheduled, 60% of which are for SQ42 - Vehicle Feature Team
full-time with 60 task(s) scheduled, 33% of which are for SQ42 - VFX Team
full-time with 36 task(s) scheduled, 40% of which are for SQ42 - Weapon Content Team
full-time with 25 task(s) scheduled, 40% of which are for SQ42 - Weapon Feature Team
7% part-time with 59 task(s) scheduled, 50% of which are for SQ42
Aciedo Station
(Scheduled work ending soon!)
- SQ42 Art
4x Art devs working on 4 tasks (62% load) thru 2022-11-23
4x Art devs working on 4 tasks (62% load) thru 2022-11-23
......................................................................................========|=........
Aerodynamic Control Surfaces
- Vehicle Feature Team
1x Engineering dev working on 9 tasks (214% load) thru 2022-12-08
1x Engineering dev working on 9 tasks (214% load) thru 2022-12-08
..................................................................==========..================|=====....
AI - Untrained Combat
- AI Tech and Feature Team
2x Engineering devs working on 11 tasks (113% load) thru 2022-12-29
2x Engineering devs working on 11 tasks (113% load) thru 2022-12-29
..................................................................................============|=========
..........==============............============................============..................|.........
AI - Vehicle Perception
- AI Tech and Feature Team
2x Engineering devs working on 7 tasks (87% load) thru 2022-12-15
2x Engineering devs working on 7 tasks (87% load) thru 2022-12-15
................................................................================..============|=======..
Anvil C8R Pisces
(Scheduled work ending soon!)
- Vehicle Feature Team
1x Design dev working on 1 task (128% load) thru 2022-11-24
1x Design dev working on 1 task (128% load) thru 2022-11-24
..........................................................................................====|=........
AR and Map Marker System Rework
(Scheduled work ending soon!)
- UI Tech Team
2x Engineering devs working on 3 tasks (227% load) thru 2022-12-01
2x Engineering devs working on 3 tasks (227% load) thru 2022-12-01
..................................==================....================..............====....|===......
Archon
(Scheduled work ending soon!)
- SQ42 Art
15x Art devs working on 3 tasks (26% load) thru 2022-11-23
15x Art devs working on 3 tasks (26% load) thru 2022-11-23
.==========================...........================........................==========..====|=........
Arena Commander: Classic Race Mode Overhaul
- Arena Commander Feature Team
1x Design dev working on 14 tasks (131% load) thru 2022-12-22
1x Engineering dev working on 14 tasks (131% load) thru 2022-12-22
1x Design dev working on 14 tasks (131% load) thru 2022-12-22
1x Engineering dev working on 14 tasks (131% load) thru 2022-12-22
........................................................====================~~~~~~============|=========
........................................................====================~~~~~~============|=========
Argo SRV
- Vehicle Content - EU
4x Art devs working on 46 tasks (66% load) thru 2023-02-02
4x Art devs working on 46 tasks (66% load) thru 2023-02-02
................................==============================================================|=========
................................~~~~~~~~~~~~~~~~~~....======================....==............|.........
Banu Merchantman
- Vehicle Content - EU
10x Art devs working on 28 tasks (28% load) thru 2023-03-16
10x Art devs working on 28 tasks (28% load) thru 2023-03-16
..============~~~~~~~~==~~................======~~....~~~~~~~~~~~~~~~~~~~~~~..................|.........
..================================================..............................==============|=========
Bombs
(Scheduled work ending soon!)
- Weapon Content Team
2x Art devs working on 3 tasks (139% load) thru 2022-12-08
2x Art devs working on 3 tasks (139% load) thru 2022-12-08
..............................................................................................|=====....
Bounty Hunter V2
- Mission Feature Team
3x Design devs working on 13 tasks (35% load) thru 2022-12-22
3x Design devs working on 13 tasks (35% load) thru 2022-12-22
....................................................====~~~~~~~~~~~~~~~~~~~~==================|=========
............................................................................==================|.........
- EU Landing Zone 2
2x Art devs will work on 3 tasks (46% load) starting 2022-11-23 thru 2022-12-20
2x Art devs will work on 3 tasks (46% load) starting 2022-11-23 thru 2022-12-20
..............................................................................................|~~~~~~~~.
- Narrative
2x Design devs will work on 2 tasks (76% load) starting 2022-12-08 thru 2022-12-30
2x Design devs will work on 2 tasks (76% load) starting 2022-12-08 thru 2022-12-30
............................................~~~~....~~~~......................................|...======
Bug Fixing & Tech Debt
- AI Tech and Feature Team
10x Engineering devs working on 7 tasks (14% load) thru 2022-12-29
10x Engineering devs working on 7 tasks (14% load) thru 2022-12-29
..............====~~~~~~................====~~~~........========....============..============|=========
- Arena Commander Feature Team
2x Design devs working on 20 tasks (60% load) thru 2022-12-22
2x Design devs working on 20 tasks (60% load) thru 2022-12-22
..======================....================================================~~~~~~============|=========
..~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~~~~~~~~~......................................|.........
- EU Sandbox 1
6x Design devs working on 6 tasks (128% load) thru 2022-11-29
13x Art devs working on 12 tasks (118% load) thru 2022-11-29
6x Design devs working on 6 tasks (128% load) thru 2022-11-29
13x Art devs working on 12 tasks (118% load) thru 2022-11-29
..............~~~~~~~~~...................====..........................=====...............==|==.......
..............~~~~~~~~~...................====..........................=====...............==|==.......
- Live Tools Team
4x Engineering devs working on 15 tasks (38% load) thru 2022-12-19
4x Engineering devs working on 15 tasks (38% load) thru 2022-12-19
..........................====================================================================|========.
- Mission Feature Team
4x Engineering devs working on 4 tasks (35% load) thru 2022-12-22
3x Design devs working on 3 tasks (49% load) thru 2022-12-22
4x Engineering devs working on 4 tasks (35% load) thru 2022-12-22
3x Design devs working on 3 tasks (49% load) thru 2022-12-22
............................................................==================..........======|=========
............................................................................................==|=========
- Tools Team
5x Engineering devs working on 7 tasks (29% load) thru 2022-12-29
5x Engineering devs working on 7 tasks (29% load) thru 2022-12-29
..============================================~~~~~~~~~~~~=====================...============|=========
- US PU Gameplay Feature Team
5x Engineering devs working on 9 tasks (68% load) thru 2022-12-22
5x Design devs working on 7 tasks (73% load) thru 2022-12-22
4x Art devs working on 3 tasks (39% load) thru 2022-12-22
5x Engineering devs working on 9 tasks (68% load) thru 2022-12-22
5x Design devs working on 7 tasks (73% load) thru 2022-12-22
4x Art devs working on 3 tasks (39% load) thru 2022-12-22
..................~~~~~~~~~...................====....................~~~~~~~~................|~~~~~~~~~
..............========~~~~~...................====....................========................|=========
..................====~~~~~...................====....................========................|=========
- Engine Team
5x Engineering devs will work on 11 tasks (147% load) starting 2022-12-04 thru 2022-12-29
5x Engineering devs will work on 11 tasks (147% load) starting 2022-12-04 thru 2022-12-29
.~================~~~~~~~~~.================~~~~~~~~~~~~~~=====================...............|...======
- EU Landing Zone 1
15x Art devs will work on 17 tasks (62% load) starting 2022-12-07 thru 2023-01-03
5x Design devs will work on 5 tasks (62% load) starting 2022-12-07 thru 2023-01-03
15x Art devs will work on 17 tasks (62% load) starting 2022-12-07 thru 2023-01-03
5x Design devs will work on 5 tasks (62% load) starting 2022-12-07 thru 2023-01-03
..............~~~~~~~~~...................====........................======..................|...======
..............~~~~~~~~~...................====........................======..................|...======
- Graphics Team
10x Engineering devs will work on 20 tasks (167% load) starting 2022-12-05 thru 2022-12-25
2x Tech Content devs will work on 4 tasks (167% load) starting 2022-12-05 thru 2022-12-25
10x Engineering devs will work on 20 tasks (167% load) starting 2022-12-05 thru 2022-12-25
2x Tech Content devs will work on 4 tasks (167% load) starting 2022-12-05 thru 2022-12-25
....................=======...................========................=========...............|...======
....................~~~~~~~...................========................=========...............|...======
- Physics Team
4x Engineering devs will work on 6 tasks (125% load) starting 2022-12-05 thru 2022-12-25
4x Engineering devs will work on 6 tasks (125% load) starting 2022-12-05 thru 2022-12-25
..====================================================..................========..............|...======
- Systemic Services and Tools Team
6x Engineering devs will work on 10 tasks (253% load) starting 2022-12-04 thru 2022-12-15
6x Engineering devs will work on 10 tasks (253% load) starting 2022-12-04 thru 2022-12-15
..................=========...................====....................==========..............|...====..
- Weapon Content Team
7x Art devs will work on 2 tasks (119% load) starting 2022-11-27 thru 2022-12-01
7x Art devs will work on 2 tasks (119% load) starting 2022-11-27 thru 2022-12-01
..==......====............................~~..............==..................................|.==......
Building Interiors
- Location Concept Art
7x Art devs working on 21 tasks (28% load) thru 2022-12-30
7x Art devs working on 21 tasks (28% load) thru 2022-12-30
......................................========================================================|=========
- MTL Sandbox 1
14x Art devs working on 14 tasks (24% load) thru 2022-12-07
4x Design devs working on 6 tasks (36% load) thru 2022-12-07
14x Art devs working on 14 tasks (24% load) thru 2022-12-07
4x Design devs working on 6 tasks (36% load) thru 2022-12-07
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~============........======================..================|=====....
..~~~~~~~~~~~~~~~~~~~~~...............................======================..================|=====....
Chapter 01
- AI Content Team
3x Design devs working on 6 tasks (58% load) thru 2022-12-01
3x Design devs working on 6 tasks (58% load) thru 2022-12-01
..................................................................................========~~~~|===......
- Character Tech Art
5x Tech Content devs working on 9 tasks (57% load) thru 2022-12-01
5x Tech Content devs working on 9 tasks (57% load) thru 2022-12-01
..................................................................============....============|===......
- Narrative
2x Design devs working on 3 tasks (96% load) thru 2022-11-23
2x Design devs working on 3 tasks (96% load) thru 2022-11-23
..............................................................................======......~~~~|~........
- SQ42 Character Art
4x Art devs working on 3 tasks (114% load) thru 2022-12-01
4x Art devs working on 3 tasks (114% load) thru 2022-12-01
......................................................========================....========....|===......
- SQ42 Level Design 2 - Flight
7x Design devs working on 11 tasks (19% load) thru 2022-11-23
7x Design devs working on 11 tasks (19% load) thru 2022-11-23
.=====================~~~~~~~~======================..========================================|=........
- VFX Team
3x Art devs working on 12 tasks (119% load) thru 2022-11-24
3x Art devs working on 12 tasks (119% load) thru 2022-11-24
..............................................................................================|=........
- SQ42 Art
12x Art devs will work on 10 tasks (39% load) starting 2022-11-24 thru 2022-12-30
12x Art devs will work on 10 tasks (39% load) starting 2022-11-24 thru 2022-12-30
..................................................................==============..............|=========
Chapter 02
- SQ42 Art
4x Art devs working on 9 tasks (29% load) thru 2022-12-30
4x Art devs working on 9 tasks (29% load) thru 2022-12-30
......................................................==========================......~~~~~~~~|===~~~~~~
Chapter 03
(Scheduled work ending soon!)
- SQ42 Character Art
1x Art dev working on 3 tasks (455% load) thru 2022-12-01
1x Art dev working on 3 tasks (455% load) thru 2022-12-01
..............................................................................................|===......
Chapter 04
- AI Content Team
4x Design devs working on 13 tasks (81% load) thru 2022-12-15
4x Design devs working on 13 tasks (81% load) thru 2022-12-15
........................................................~~~~~~~~~~~~..............============|=======..
- AI Tech and Feature Team
1x Engineering dev working on 6 tasks (189% load) thru 2022-12-15
1x Engineering dev working on 6 tasks (189% load) thru 2022-12-15
......................................................................................========|=======..
- SQ42 Character Art
3x Art devs working on 5 tasks (71% load) thru 2022-12-15
3x Art devs working on 5 tasks (71% load) thru 2022-12-15
......................................................========....============............====|=======..
- SQ42 Level Design 3 - Social
2x Design devs working on 2 tasks (31% load) thru 2022-11-23
2x Design devs working on 2 tasks (31% load) thru 2022-11-23
..==============..............................................................~~~~~~..~~~~~~~~|~........
Chapter 05
- Character Tech Art
2x Tech Content devs working on 6 tasks (455% load) thru 2022-12-01
2x Tech Content devs working on 6 tasks (455% load) thru 2022-12-01
..........................................................========............................|===......
- SQ42 Art
7x Art devs working on 17 tasks (30% load) thru 2022-12-30
7x Art devs working on 17 tasks (30% load) thru 2022-12-30
..................................................................============================|=========
- SQ42 Character Art
4x Art devs working on 10 tasks (62% load) thru 2022-12-15
4x Art devs working on 10 tasks (62% load) thru 2022-12-15
......................................................========================....============|=======..
- SQ42 Level Design 2 - Flight
6x Design devs working on 2 tasks (21% load) thru 2022-11-23
6x Design devs working on 2 tasks (21% load) thru 2022-11-23
..............................................................................======..========|=........
- Tech Animation Team
4x Tech Content devs working on 10 tasks (39% load) thru 2022-12-22
4x Tech Content devs working on 10 tasks (39% load) thru 2022-12-22
..................................................................................~~~~~~~~~~~~|~~~======
Chapter 06
(Scheduled work ending soon!)
- SQ42 UI Feature Team
3x Art devs working on 4 tasks (89% load) thru 2022-12-01
3x Art devs working on 4 tasks (89% load) thru 2022-12-01
..........................................................................................====|===......
Chapter 07
- Narrative
2x Design devs working on 3 tasks (96% load) thru 2022-11-23
2x Design devs working on 3 tasks (96% load) thru 2022-11-23
..............................................................................~~~~~~......~~~~|~........
- SQ42 Level Design 2 - Flight
4x Design devs working on 6 tasks (27% load) thru 2022-12-30
4x Design devs working on 6 tasks (27% load) thru 2022-12-30
.~~~~~~~..============~~~~~~..................................................================|=========
- SQ42 Art
3x Art devs will work on 6 tasks (152% load) starting 2022-12-08 thru 2022-12-30
3x Art devs will work on 6 tasks (152% load) starting 2022-12-08 thru 2022-12-30
......................................................................................======..|...======
Chapter 08
(Scheduled work ending soon!)
- SQ42 Level Design 3 - Social
3x Design devs working on 2 tasks (41% load) thru 2022-12-07
3x Design devs working on 2 tasks (41% load) thru 2022-12-07
..............................................................................~~~~~~~~~~..====|=====....
Chapter 09
(Scheduled work ending soon!)
- Narrative
4x Design devs working on 5 tasks (51% load) thru 2022-12-07
4x Design devs working on 5 tasks (51% load) thru 2022-12-07
..............................................................................~~~~~~..========|=====....
- SQ42 Level Design 2 - Flight
3x Design devs working on 4 tasks (40% load) thru 2022-11-23
3x Design devs working on 4 tasks (40% load) thru 2022-11-23
..............................................................................================|=........
- VFX Team
1x Art dev working on 4 tasks (247% load) thru 2022-11-24
1x Art dev working on 4 tasks (247% load) thru 2022-11-24
......................................................................................========|=........
Chapter 10
(Scheduled work ending soon!)
- SQ42 Level Design 1 - FPS
1x Design dev working on 2 tasks (123% load) thru 2022-12-07
1x Design dev working on 2 tasks (123% load) thru 2022-12-07
..........................................................................................====|=====....
Chapter 11
- SQ42 Character Art
1x Art dev working on 1 task (152% load) thru 2022-12-01
1x Art dev working on 1 task (152% load) thru 2022-12-01
..............................................................................................|===......
- Character Tech Art
1x Tech Content dev will work on 1 task (152% load) starting 2022-12-04 thru 2022-12-15
1x Tech Content dev will work on 1 task (152% load) starting 2022-12-04 thru 2022-12-15
..............................................................................................|...====..
- Gameplay Story
5x Animation devs will work on 1 task (13% load) starting 2022-11-24 thru 2022-12-07
5x Animation devs will work on 1 task (13% load) starting 2022-11-24 thru 2022-12-07
..........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~..................................|~~~~~....
- Narrative
2x Design devs will work on 1 task (64% load) starting 2022-11-24 thru 2022-12-07
2x Design devs will work on 1 task (64% load) starting 2022-11-24 thru 2022-12-07
..............................................................................~~~~~~..........|=====....
- SQ42 Level Design 2 - Flight
3x Design devs will work on 2 tasks (31% load) starting 2022-11-24 thru 2022-12-30
3x Design devs will work on 2 tasks (31% load) starting 2022-11-24 thru 2022-12-30
.~~~~~~~......................................................................................|=========
Chapter 12
- AI Content Team
3x Design devs working on 5 tasks (71% load) thru 2022-12-15
3x Design devs working on 5 tasks (71% load) thru 2022-12-15
........................................................~~~~~~~~~~~~========..............====|=======..
........................................................................====..................|.........
- Character Tech Art
3x Tech Content devs working on 6 tasks (63% load) thru 2022-12-15
3x Tech Content devs working on 6 tasks (63% load) thru 2022-12-15
......................................................................................========|=======..
- Motion Capture Team
1x Animation dev will work on 3 tasks (227% load) starting 2022-12-08 thru 2022-12-30
1x Animation dev will work on 3 tasks (227% load) starting 2022-12-08 thru 2022-12-30
..............................................................................................|...======
- Tech Animation Team
1x Tech Content dev will work on 3 tasks (385% load) starting 2022-11-25 thru 2022-12-08
1x Tech Content dev will work on 3 tasks (385% load) starting 2022-11-25 thru 2022-12-08
..............................................................................................|=====....
Chapter 14
- SQ42 Art
11x Art devs working on 41 tasks (35% load) thru 2022-12-30
11x Art devs working on 41 tasks (35% load) thru 2022-12-30
......................................................========================================|=========
..........................========....................==========================..............|.........
- SQ42 Character Art
1x Art dev working on 5 tasks (214% load) thru 2022-12-15
1x Art dev working on 5 tasks (214% load) thru 2022-12-15
..........................................................................................====|=======..
- Narrative
2x Design devs will work on 3 tasks (114% load) starting 2022-12-08 thru 2022-12-30
2x Design devs will work on 3 tasks (114% load) starting 2022-12-08 thru 2022-12-30
................................====..........................................................|...======
- SQ42 Level Design 1 - FPS
7x Design devs will work on 2 tasks (13% load) starting 2022-11-24 thru 2022-12-30
7x Design devs will work on 2 tasks (13% load) starting 2022-11-24 thru 2022-12-30
.=====================~~~~~~~~==================================================..............|=========
Chapter 15
(Scheduled work ending soon!)
- Cinematics Team
3x Animation devs working on 6 tasks (31% load) thru 2022-12-01
3x Animation devs working on 6 tasks (31% load) thru 2022-12-01
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~..~~~~~~~~~~~~|~~~......
.~~~~~~~~~~~~~~~~~~~~~~~~~~.......................................................~~~~........|.........
- Gameplay Story
5x Animation devs working on 6 tasks (18% load) thru 2022-12-07
5x Animation devs working on 6 tasks (18% load) thru 2022-12-07
..............~~~~~...~~~~~~..............~~~~~~~~~~~~............................~~~~~~~~~~~~|~~~~~....
- SQ42 Level Design 3 - Social
3x Design devs working on 2 tasks (41% load) thru 2022-12-07
3x Design devs working on 2 tasks (41% load) thru 2022-12-07
......~~~~~~~~==========..................................................................====|=====....
Chapter 16
- Cinematics Team
2x Animation devs working on 1 task (38% load) thru 2022-12-01
2x Animation devs working on 1 task (38% load) thru 2022-12-01
..................................................................................~~~~........|.........
..................................................................................~~~~........|~~~......
- SQ42 Level Design 1 - FPS
2x Design devs will work on 1 task (38% load) starting 2022-12-08 thru 2022-12-30
2x Design devs will work on 1 task (38% load) starting 2022-12-08 thru 2022-12-30
..............................................................................................|...======
- SQ42 Level Design 2 - Flight
2x Design devs will work on 1 task (38% load) starting 2022-12-08 thru 2022-12-30
2x Design devs will work on 1 task (38% load) starting 2022-12-08 thru 2022-12-30
..............................................................................................|...======
Chapter 17
- Cinematics Team
1x Animation dev working on 3 tasks (227% load) thru 2022-12-01
1x Animation dev working on 3 tasks (227% load) thru 2022-12-01
..............................................................................................|~~~......
- SQ42 Art
2x Art devs working on 14 tasks (66% load) thru 2022-12-30
2x Art devs working on 14 tasks (66% load) thru 2022-12-30
......................................................========================================|=========
- SQ42 UI Feature Team
2x Art devs working on 5 tasks (107% load) thru 2022-12-01
2x Art devs working on 5 tasks (107% load) thru 2022-12-01
......................................................................................========|===......
- SQ42 Level Design 1 - FPS
1x Design dev will work on 1 task (76% load) starting 2022-12-08 thru 2022-12-30
1x Design dev will work on 1 task (76% load) starting 2022-12-08 thru 2022-12-30
..==========..................................................................................|...======
Chapter 18
- SQ42 Art
4x Art devs working on 17 tasks (77% load) thru 2022-12-30
4x Art devs working on 17 tasks (77% load) thru 2022-12-30
..............................................................................================|=========
- SQ42 Level Design 1 - FPS
4x Design devs working on 5 tasks (30% load) thru 2022-12-07
4x Design devs working on 5 tasks (30% load) thru 2022-12-07
.~====~~~~~~~~~~~~~~~~~~~~~~..................................................================|=====....
- SQ42 Level Design 2 - Flight
2x Design devs working on 3 tasks (61% load) thru 2022-11-23
2x Design devs working on 3 tasks (61% load) thru 2022-11-23
..................................................................................============|=........
- Character Tech Art
1x Tech Content dev will work on 3 tasks (455% load) starting 2022-12-04 thru 2022-12-15
1x Tech Content dev will work on 3 tasks (455% load) starting 2022-12-04 thru 2022-12-15
..............................................................................................|...====..
Chapter 19
- Gameplay Story
5x Animation devs working on 11 tasks (12% load) thru 2022-12-07
5x Animation devs working on 11 tasks (12% load) thru 2022-12-07
..................~~~~~.......~~~~~~~~........~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~....
..................................~~~~........................................................|.........
- SQ42 Art
6x Art devs working on 6 tasks (20% load) thru 2022-12-30
6x Art devs working on 6 tasks (20% load) thru 2022-12-30
..................................................................~~~~==========......~~~~~~~~|=========
- SQ42 Level Design 1 - FPS
5x Design devs working on 9 tasks (25% load) thru 2022-12-30
5x Design devs working on 9 tasks (25% load) thru 2022-12-30
......~~~~~~~~~~~~~~~~~~~~~~..............============................========================|=========
- SQ42 Level Design 2 - Flight
1x Design dev working on 3 tasks (122% load) thru 2022-11-23
1x Design dev working on 3 tasks (122% load) thru 2022-11-23
..................................................................................============|=........
- Tech Animation Team
1x Tech Content dev working on 1 task (64% load) thru 2022-11-24
1x Tech Content dev working on 1 task (64% load) thru 2022-11-24
..........................................................................................~~~~|~........
- VFX Team
1x Art dev working on 2 tasks (123% load) thru 2022-11-24
1x Art dev working on 2 tasks (123% load) thru 2022-11-24
......................................................................................========|=........
- Character Tech Art
1x Tech Content dev will work on 1 task (152% load) starting 2022-12-04 thru 2022-12-15
1x Tech Content dev will work on 1 task (152% load) starting 2022-12-04 thru 2022-12-15
..............................................................................................|...====..
Chapter 20
(Scheduled work ending soon!)
- Cinematics Team
3x Animation devs working on 9 tasks (47% load) thru 2022-12-01
3x Design devs working on 6 tasks (37% load) thru 2022-12-01
3x Animation devs working on 9 tasks (47% load) thru 2022-12-01
3x Design devs working on 6 tasks (37% load) thru 2022-12-01
.~~~~~~~~~~~~~~~~~~~~~~~~~~.......................................................~~~~~~~~~~~~|~~~......
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~~~........~~~~~~~~====|~~~......
- Gameplay Story
4x Animation devs working on 13 tasks (18% load) thru 2022-12-07
4x Animation devs working on 13 tasks (18% load) thru 2022-12-07
..............................................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~....
- SQ42 Level Design 1 - FPS
5x Design devs working on 5 tasks (24% load) thru 2022-12-07
5x Design devs working on 5 tasks (24% load) thru 2022-12-07
......~~~~~~~~~~~~~~~~~~~~~~..................................................================|=====....
- SQ42 Level Design 3 - Social
1x Design dev working on 3 tasks (81% load) thru 2022-12-07
1x Design dev working on 3 tasks (81% load) thru 2022-12-07
......................................................................................~~~~~~~~|=====....
Chapter 21
- AI Content Team
3x Design devs working on 6 tasks (58% load) thru 2022-12-15
3x Design devs working on 6 tasks (58% load) thru 2022-12-15
......................................................................................====~~~~|=======..
- SQ42 Art
2x Art devs working on 7 tasks (108% load) thru 2022-11-23
2x Art devs working on 7 tasks (108% load) thru 2022-11-23
......................................................................................~~~~~~~~|~........
- SQ42 UI Feature Team
1x Art dev will work on 3 tasks (455% load) starting 2022-12-04 thru 2022-12-15
1x Art dev will work on 3 tasks (455% load) starting 2022-12-04 thru 2022-12-15
..............................................................................................|...====..
Chapter 22
- Cinematics Team
2x Animation devs working on 5 tasks (39% load) thru 2022-12-01
2x Animation devs working on 5 tasks (39% load) thru 2022-12-01
..................................................................................~~~~~~~~~~~~|~~~......
- Gameplay Story
4x Animation devs working on 5 tasks (25% load) thru 2022-12-07
4x Animation devs working on 5 tasks (25% load) thru 2022-12-07
..............................................~~~~~~~~................................~~~~~~~~|~~~~~....
- SQ42 Art
2x Art devs working on 5 tasks (65% load) thru 2022-12-30
2x Art devs working on 5 tasks (65% load) thru 2022-12-30
..............................................................................==============..|.........
......................................................................................========|=========
- SQ42 Level Design 1 - FPS
10x Design devs working on 8 tasks (11% load) thru 2022-12-30
10x Design devs working on 8 tasks (11% load) thru 2022-12-30
......================~~~~~~..............============................========================|=========
- SQ42 Character Art
1x Art dev will work on 1 task (152% load) starting 2022-12-04 thru 2022-12-15
1x Art dev will work on 1 task (152% load) starting 2022-12-04 thru 2022-12-15
..................................................................................====........|...====..
- SQ42 Level Design 2 - Flight
2x Design devs will work on 2 tasks (46% load) starting 2022-11-24 thru 2022-12-30
2x Design devs will work on 2 tasks (46% load) starting 2022-11-24 thru 2022-12-30
..............................................................................................|=========
Chapter 23
(Scheduled work ending soon!)
- Cinematics Team
4x Animation devs working on 3 tasks (57% load) thru 2022-12-01
2x Design devs working on 3 tasks (114% load) thru 2022-12-01
4x Animation devs working on 3 tasks (57% load) thru 2022-12-01
2x Design devs working on 3 tasks (114% load) thru 2022-12-01
..........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~..............|~~~......
.~~~~~~~~~~~~~~~~~~~~~~~~~~...................................................................|~~~......
- Gameplay Story
5x Animation devs working on 11 tasks (45% load) thru 2022-12-07
5x Animation devs working on 11 tasks (45% load) thru 2022-12-07
..................~~~~~.......~~~~~~~~........~~~~~~~~~~~~~~..........................~~~~~~~~|~~~~~....
..................................~~~~........................................................|.........
- SQ42 Art
2x Art devs working on 7 tasks (108% load) thru 2022-11-23
2x Art devs working on 7 tasks (108% load) thru 2022-11-23
......................................................................................~~~~~~~~|~........
- SQ42 Level Design 3 - Social
2x Design devs working on 5 tasks (60% load) thru 2022-12-07
2x Design devs working on 5 tasks (60% load) thru 2022-12-07
..............................................................................================|=====....
- Narrative
1x Design dev will work on 3 tasks (385% load) starting 2022-11-24 thru 2022-12-07
1x Design dev will work on 3 tasks (385% load) starting 2022-11-24 thru 2022-12-07
..............................................................................................|=====....
Chapter 25
(Scheduled work ending soon!)
- Gameplay Story
4x Animation devs working on 3 tasks (48% load) thru 2022-11-23
4x Animation devs working on 3 tasks (48% load) thru 2022-11-23
..............................................................................~~~~~~~~~~..~~~~|~........
- SQ42 Level Design 3 - Social
1x Design dev working on 4 tasks (121% load) thru 2022-11-23
1x Design dev working on 4 tasks (121% load) thru 2022-11-23
..............................................................................================|=........
Chapter 26
- Cinematics Team
2x Animation devs working on 3 tasks (50% load) thru 2022-12-01
2x Animation devs working on 3 tasks (50% load) thru 2022-12-01
..........................................................................................~~~~|~~~......
- Narrative
1x Design dev working on 1 task (128% load) thru 2022-11-23
1x Design dev working on 1 task (128% load) thru 2022-11-23
..........................................................................................====|=........
- SQ42 Character Art
4x Art devs working on 6 tasks (47% load) thru 2022-12-15
4x Art devs working on 6 tasks (47% load) thru 2022-12-15
......................................................................========........========|=======..
- Gameplay Story
4x Animation devs will work on 2 tasks (32% load) starting 2022-11-24 thru 2022-12-07
4x Animation devs will work on 2 tasks (32% load) starting 2022-11-24 thru 2022-12-07
..............................................................................................|~~~~~....
- SQ42 Level Design 1 - FPS
9x Design devs will work on 2 tasks (10% load) starting 2022-11-24 thru 2022-12-30
9x Design devs will work on 2 tasks (10% load) starting 2022-11-24 thru 2022-12-30
.===========================..............============................==========..............|=========
- SQ42 Level Design 3 - Social
1x Design dev will work on 1 task (128% load) starting 2022-11-24 thru 2022-12-07
1x Design dev will work on 1 task (128% load) starting 2022-11-24 thru 2022-12-07
..............................................................................................|=====....
Chapter 27
- Cinematics Team
1x Design dev working on 3 tasks (455% load) thru 2022-12-01
1x Design dev working on 3 tasks (455% load) thru 2022-12-01
..............................................................................................|===......
- Narrative
1x Design dev will work on 3 tasks (227% load) starting 2022-12-08 thru 2022-12-30
1x Design dev will work on 3 tasks (227% load) starting 2022-12-08 thru 2022-12-30
..............................................................................................|...======
- SQ42 Level Design 2 - Flight
3x Design devs will work on 2 tasks (31% load) starting 2022-11-24 thru 2022-12-30
3x Design devs will work on 2 tasks (31% load) starting 2022-11-24 thru 2022-12-30
..............................................................................................|=========
Character Work
- Actor Feature Team
1x Engineering dev working on 6 tasks (109% load) thru 2022-12-30
1x Engineering dev working on 6 tasks (109% load) thru 2022-12-30
..............................................................==========......================|=========
..................................................................................==========..|.........
- AI Content Team
6x Animation devs working on 17 tasks (58% load) thru 2022-12-29
6x Animation devs working on 17 tasks (58% load) thru 2022-12-29
..======================....====================........================..........============|=========
..................======....................====..............................................|.........
- AI Tech and Feature Team
1x Design dev working on 8 tasks (82% load) thru 2022-12-29
4x Engineering devs working on 6 tasks (47% load) thru 2022-12-15
1x Design dev working on 8 tasks (82% load) thru 2022-12-29
4x Engineering devs working on 6 tasks (47% load) thru 2022-12-15
..==========................========....................========..............................|.........
..................................................................................~~~~~~~~~~~~|~~~~~~~~~
..~~~~========~~~~~~........~~~~========~~~~............============..................========|=======..
- Facial Animation
9x Animation devs working on 26 tasks (52% load) thru 2022-12-30
9x Animation devs working on 26 tasks (52% load) thru 2022-12-30
....==========================================~~~~~~~~~~======================================|=========
- Motion Capture Team
9x Animation devs working on 29 tasks (38% load) thru 2022-12-30
9x Animation devs working on 29 tasks (38% load) thru 2022-12-30
......=========.......====~~~~~~~~~~~~~~~~........................========~~~~~~~~============|=========
- Tech Animation Team
11x Tech Content devs working on 32 tasks (49% load) thru 2022-12-22
11x Tech Content devs working on 32 tasks (49% load) thru 2022-12-22
..........~~~~~~~~~~~~~~~~~...~~~~=====...~~~~========~~~~~~~~=============...================|=========
Charge/Drain T0
(Scheduled work ending soon!)
- Weapon Feature Team
2x Engineering devs working on 11 tasks (95% load) thru 2022-11-23
2x Engineering devs working on 11 tasks (95% load) thru 2022-11-23
........................................========~~~~~~~~..........============================|=........
Crusader Spirit
- Vehicle Content - EU
5x Art devs working on 12 tasks (54% load) thru 2022-12-15
1x Design dev working on 8 tasks (290% load) thru 2022-12-15
5x Art devs working on 12 tasks (54% load) thru 2022-12-15
1x Design dev working on 8 tasks (290% load) thru 2022-12-15
................................................................................==============|=======..
........................................................................................======|=======..
Cutting T2
- Weapon Feature Team
1x Engineering dev working on 10 tasks (181% load) thru 2022-12-30
1x Engineering dev working on 10 tasks (181% load) thru 2022-12-30
..............................................................................================|=========
Derelict Spaceships - Points of Interest
- Audio
4x Audio devs working on 3 tasks (69% load) thru 2022-12-01
4x Audio devs working on 3 tasks (69% load) thru 2022-12-01
..............................~~~~~~~~~~~~~~~~~~~~~~~~~~~~==......==========................==|===..====
- MTL Sandbox 1
4x Design devs working on 7 tasks (42% load) thru 2022-12-07
8x Art devs working on 11 tasks (33% load) thru 2022-12-07
4x Design devs working on 7 tasks (42% load) thru 2022-12-07
8x Art devs working on 11 tasks (33% load) thru 2022-12-07
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~============........======================..================|=====....
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~============........======================..================|=====....
Dynamic Events
- Mission Feature Team
4x Engineering devs working on 7 tasks (32% load) thru 2022-12-22
4x Engineering devs working on 7 tasks (32% load) thru 2022-12-22
..========================..................................................==================|=========
..================================================..~~~~~~~~~~~~~~~~~~~~~~~~~~................|...======
Entity Properties Plugin
- Editor Team
1x Engineering dev working on 4 tasks (267% load) thru 2022-12-15
1x Engineering dev working on 4 tasks (267% load) thru 2022-12-15
..=========...=========...............========~~~~~~~~~~~~=====...=========.......========....|=======..
EVA T2
- Actor Tech Team
2x Engineering devs working on 8 tasks (82% load) thru 2022-12-29
2x Engineering devs working on 8 tasks (82% load) thru 2022-12-29
............................====================~~~~~~~~~~====================....============|=========
Flak Ammunition
- Weapon Content Team
1x Art dev working on 3 tasks (1250% load) thru 2022-11-24
↳ will continue 2022-12-04 with 1x dev
1x Art dev working on 3 tasks (1250% load) thru 2022-11-24
↳ will continue 2022-12-04 with 1x dev
..............................................................................................|=..==....
Freight Elevators
- Audio
1x Audio dev working on 4 tasks (370% load) thru 2022-12-01
1x Audio dev working on 4 tasks (370% load) thru 2022-12-01
............................................................................................==|===..====
Frontier Clothing
- Character Tech Art
5x Tech Content devs working on 8 tasks (68% load) thru 2022-12-15
5x Tech Content devs working on 8 tasks (68% load) thru 2022-12-15
......................................========............========....========....====....====|=======..
- SC Character Art
15x Art devs working on 23 tasks (32% load) thru 2022-12-29
15x Art devs working on 23 tasks (32% load) thru 2022-12-29
.=================================================....========================....============|=========
Gen12 - Renderer T1
(Scheduled work ending soon!)
- Engine Team
4x Engineering devs working on 11 tasks (86% load) thru 2022-12-01
4x Engineering devs working on 11 tasks (86% load) thru 2022-12-01
..=================.........================..........~~~~=============...........============|===......
- Graphics Team
7x Engineering devs working on 10 tasks (38% load) thru 2022-12-04
7x Engineering devs working on 10 tasks (38% load) thru 2022-12-04
..===================.....======================....====================........==============|====.....
HEX
- Live Tools Team
5x Engineering devs working on 55 tasks (61% load) thru 2022-12-19
5x Engineering devs working on 55 tasks (61% load) thru 2022-12-19
..=====================...~~~~========================~~~~~~~~~~~~~~~~~~~~~~~~~~~~============|========.
Ladders T1
(Scheduled work ending soon!)
- Actor Feature Team
3x Animation devs working on 5 tasks (214% load) thru 2022-11-23
3x Animation devs working on 5 tasks (214% load) thru 2022-11-23
............................====================~~~~~~~~~~======================..........====|=........
..............................................................======..........==========......|.........
Lorville Cityscape
- MTL Sandbox 1
4x Art devs working on 10 tasks (60% load) thru 2022-12-07
4x Art devs working on 10 tasks (60% load) thru 2022-12-07
......................................................======================..================|=====....
- VFX Team
1x Art dev working on 3 tasks (385% load) thru 2022-11-24
1x Art dev working on 3 tasks (385% load) thru 2022-11-24
..........................................................................................====|=........
Map and Radar System Rework
- Graphics Team
1x Engineering dev working on 5 tasks (132% load) thru 2022-12-04
1x Engineering dev working on 5 tasks (132% load) thru 2022-12-04
................................................................========........==============|====.....
- SQ42 UI Feature Team
3x Engineering devs working on 10 tasks (83% load) thru 2022-12-15
3x Art devs will work on 3 tasks (152% load) starting 2022-12-04 thru 2022-12-15
3x Engineering devs working on 10 tasks (83% load) thru 2022-12-15
3x Art devs will work on 3 tasks (152% load) starting 2022-12-04 thru 2022-12-15
..............................==============================================......============|=======..
..........................................==============....========..................====....|...====..
MFD Rework
- Vehicle Feature Team
8x Engineering devs working on 9 tasks (27% load) thru 2022-12-08
8x Engineering devs working on 9 tasks (27% load) thru 2022-12-08
......................................................======================..================|=====....
MISC Hull C
- Vehicle Content - EU
2x Design devs working on 14 tasks (174% load) thru 2022-12-15
2x Design devs working on 14 tasks (174% load) thru 2022-12-15
..........................................................================....==..............|.........
..............................~~~~~~~~~~~~~~~~~~~~................................============|=======..
Miscellaneous Support
- Actor Feature Team
3x Design devs working on 29 tasks (43% load) thru 2022-12-30
2x Engineering devs working on 26 tasks (58% load) thru 2022-12-30
4x Animation devs working on 29 tasks (32% load) thru 2022-12-30
3x Design devs working on 29 tasks (43% load) thru 2022-12-30
2x Engineering devs working on 26 tasks (58% load) thru 2022-12-30
4x Animation devs working on 29 tasks (32% load) thru 2022-12-30
..==============================================~~~~~~~~~~====================================|=========
..==============================================~~~~~~~~~~====================================|=========
..==============================================~~~~~~~~~~====================================|=========
..==========================..................................................................|.........
- Actor Tech Team
5x Engineering devs working on 11 tasks (45% load) thru 2022-12-29
5x Engineering devs working on 11 tasks (45% load) thru 2022-12-29
..~~~~~~~~~~~~~~~~~~~~======~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~====================....============|=========
- AI Content Team
2x Tech Content devs working on 11 tasks (57% load) thru 2022-12-29
2x Tech Content devs working on 11 tasks (57% load) thru 2022-12-29
..~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~........~~~~~~~~~~~~~~~~~~~~~~~~..~~~~~~~~~~~~|~~~~~~~~~
..................======....................====..............................................|.........
- Arena Commander Feature Team
3x Engineering devs working on 27 tasks (41% load) thru 2022-12-22
3x Engineering devs working on 27 tasks (41% load) thru 2022-12-22
........................================================......................................|.........
....====================~~~~================================================~~~~~~============|=========
- Audio
6x Audio devs working on 14 tasks (65% load) thru 2022-12-01
6x Audio devs working on 14 tasks (65% load) thru 2022-12-01
................................................................................==============|===..====
- Editor Team
1x Design dev working on 8 tasks (165% load) thru 2022-12-29
3x Engineering devs working on 4 tasks (89% load) thru 2022-12-15
1x Design dev working on 8 tasks (165% load) thru 2022-12-29
3x Engineering devs working on 4 tasks (89% load) thru 2022-12-15
..============================================~~~~~~~~~~~~=====================...============|=========
......................................................~~~~=====...=========.......========....|=======..
- Gameplay Story
1x Tech Content dev working on 13 tasks (76% load) thru 2022-12-07
1x Tech Content dev working on 13 tasks (76% load) thru 2022-12-07
.=====.===============~~~~~~..====........====~~~~~~~~~~~~~~~~~~~~~~~~~~~~====~~~~~~~~~~~~~~~~|~~~~~....
- Narrative
1x Design dev working on 8 tasks (145% load) thru 2022-12-30
1x Design dev working on 8 tasks (145% load) thru 2022-12-30
..............................................................................================|=========
- SQ42 UI Feature Team
3x Engineering devs working on 5 tasks (71% load) thru 2022-12-29
3x Engineering devs working on 5 tasks (71% load) thru 2022-12-29
..............................................................................................|=========
........................................................................========..............|.......==
- Systemic Services and Tools Team
4x Engineering devs working on 7 tasks (45% load) thru 2022-12-03
4x Engineering devs working on 7 tasks (45% load) thru 2022-12-03
..............................................................................================|=====....
- Tools Team
2x Engineering devs working on 8 tasks (82% load) thru 2022-12-29
2x Engineering devs working on 8 tasks (82% load) thru 2022-12-29
..============================================~~~~~~~~~~~~=====================...============|=========
- UI Tech Team
4x Engineering devs working on 6 tasks (47% load) thru 2022-12-01
4x Engineering devs working on 6 tasks (47% load) thru 2022-12-01
..............................==========================................====......============|===......
- VFX Team
2x Tech Content devs working on 3 tasks (192% load) thru 2022-11-24
2x Tech Content devs working on 3 tasks (192% load) thru 2022-11-24
......................~~~~~~=================.................................==========..====|=........
- Weapon Content Team
4x Art devs working on 5 tasks (116% load) thru 2022-12-08
4x Art devs working on 5 tasks (116% load) thru 2022-12-08
................==............................................................................|=====....
................==............................................................................|.........
- Weapon Feature Team
5x Design devs working on 38 tasks (33% load) thru 2022-12-30
2x Engineering devs will work on 3 tasks (114% load) starting 2022-12-08 thru 2022-12-30
5x Design devs working on 38 tasks (33% load) thru 2022-12-30
2x Engineering devs will work on 3 tasks (114% load) starting 2022-12-08 thru 2022-12-30
..==============================================~~~~~~~~~~====================================|=========
..........................................................................======..............|...======
New Missions - Orison
(Scheduled work ending soon!)
- Narrative
1x Design dev working on 1 task (128% load) thru 2022-11-23
1x Design dev working on 1 task (128% load) thru 2022-11-23
..........................................................................................====|=........
Ocean Shader Improvements
(Scheduled work ending soon!)
- Graphics Team
1x Engineering dev working on 2 tasks (81% load) thru 2022-12-04
1x Engineering dev working on 2 tasks (81% load) thru 2022-12-04
......................................................................................========|====.....
- Planet Tech Team
2x Engineering devs working on 6 tasks (72% load) thru 2022-12-07
2x Engineering devs working on 6 tasks (72% load) thru 2022-12-07
..........................................=========...=====================...================|=====....
- VFX Team
2x Engineering devs working on 3 tasks (93% load) thru 2022-11-24
2x Engineering devs working on 3 tasks (93% load) thru 2022-11-24
......................................................................................========|=........
......................................................................................======..|.........
Outpost Homestead - Independent & Outlaw
- VFX Team
1x Art dev working on 3 tasks (385% load) thru 2022-11-24
1x Art dev working on 3 tasks (385% load) thru 2022-11-24
..........................................................................................====|=........
- EU Sandbox 1
12x Art devs will work on 15 tasks (104% load) starting 2022-11-30 thru 2022-12-20
12x Art devs will work on 15 tasks (104% load) starting 2022-11-30 thru 2022-12-20
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========....===========================...=================.|.=======.
Persistent Streaming and Server Meshing
- Engine Team
1x Engineering dev working on 5 tasks (157% load) thru 2022-12-01
1x Engineering dev working on 5 tasks (157% load) thru 2022-12-01
..................................................................................============|===......
- Game Services Team
10x Engineering devs working on 33 tasks (26% load) thru 2022-12-29
10x Engineering devs working on 33 tasks (26% load) thru 2022-12-29
..====================~~~~~~~~================================================~~~~~~~~~~~~~~~~|~~~~~~~~~
- Mission Feature Team
3x Engineering devs working on 4 tasks (46% load) thru 2022-12-22
3x Engineering devs working on 4 tasks (46% load) thru 2022-12-22
.~========================~~~~~~~~~~~~~~~~~~~~~~~~......................................======|=========
- Network Team
9x Engineering devs working on 13 tasks (14% load) thru 2022-12-30
9x Engineering devs working on 13 tasks (14% load) thru 2022-12-30
..=====.......============....................================================================|=========
- Persistent Tech Team
4x Engineering devs working on 17 tasks (40% load) thru 2022-12-30
4x Engineering devs working on 17 tasks (40% load) thru 2022-12-30
..====================~~~~~~~~================================================================|=========
- Systemic Services and Tools Team
3x Engineering devs working on 3 tasks (62% load) thru 2022-12-03
3x Engineering devs working on 3 tasks (62% load) thru 2022-12-03
..........................................................................................====|=====....
- Vehicle Feature Team
5x Engineering devs working on 14 tasks (30% load) thru 2022-12-08
5x Engineering devs working on 14 tasks (30% load) thru 2022-12-08
......................................==============..========================================|=====....
Physical Damage & Breakability
(Scheduled work ending soon!)
- Physics Team
3x Engineering devs working on 5 tasks (44% load) thru 2022-12-04
3x Engineering devs working on 5 tasks (44% load) thru 2022-12-04
..===================.....======================....======================......==============|====.....
Physics - Ropes Simulation
(Scheduled work ending soon!)
- Physics Team
1x Engineering dev working on 5 tasks (132% load) thru 2022-12-04
1x Engineering dev working on 5 tasks (132% load) thru 2022-12-04
..===================.....======================....======================......==============|====.....
Player Interaction Experience T2 - Visor HUD & Helmet
- SQ42 UI Feature Team
1x Engineering dev working on 6 tasks (189% load) thru 2022-12-15
1x Art dev working on 3 tasks (455% load) thru 2022-12-01
1x Design dev will work on 3 tasks (455% load) starting 2022-12-04 thru 2022-12-15
1x Engineering dev working on 6 tasks (189% load) thru 2022-12-15
1x Art dev working on 3 tasks (455% load) thru 2022-12-01
1x Design dev will work on 3 tasks (455% load) starting 2022-12-04 thru 2022-12-15
......................................................................................========|=======..
..............................................................................................|===......
......................................................................................====....|...====..
Player/Machine Physical Interaction
- Actor Feature Team
1x Engineering dev working on 6 tasks (109% load) thru 2022-12-30
1x Animation dev working on 8 tasks (145% load) thru 2022-12-30
1x Engineering dev working on 6 tasks (109% load) thru 2022-12-30
1x Animation dev working on 8 tasks (145% load) thru 2022-12-30
..............................................................................================|=========
..............................................................................================|=========
Prone T1
- Actor Feature Team
1x Engineering dev working on 8 tasks (145% load) thru 2022-12-30
1x Animation dev working on 10 tasks (181% load) thru 2022-12-30
1x Engineering dev working on 8 tasks (145% load) thru 2022-12-30
1x Animation dev working on 10 tasks (181% load) thru 2022-12-30
..............................................................................================|=========
..............................................................................================|=========
Pyro System, Planet, and Mission Setup
- Audio
4x Audio devs working on 8 tasks (72% load) thru 2022-12-01
4x Audio devs working on 8 tasks (72% load) thru 2022-12-01
....................................................................======..........==========|===......
Quantum Simulation
- Systemic Services and Tools Team
5x Engineering devs working on 31 tasks (64% load) thru 2022-12-15
5x Engineering devs working on 31 tasks (64% load) thru 2022-12-15
.=================================================....========================================|=======..
Quantum Travel Experience
- Physics Team
1x Engineering dev working on 5 tasks (132% load) thru 2022-12-04
1x Engineering dev working on 5 tasks (132% load) thru 2022-12-04
................................................................................==============|====.....
- SQ42 UI Feature Team
1x Design dev working on 3 tasks (455% load) thru 2022-12-01
1x Design dev working on 3 tasks (455% load) thru 2022-12-01
..............................................................................................|===......
- Vehicle Feature Team
3x Engineering devs working on 7 tasks (56% load) thru 2022-12-08
3x Engineering devs working on 7 tasks (56% load) thru 2022-12-08
......................................==============..======================..================|=====....
RaStar
(Scheduled work ending soon!)
- VFX Team
1x Art dev working on 3 tasks (385% load) thru 2022-11-24
1x Art dev working on 3 tasks (385% load) thru 2022-11-24
..........................................................................................====|=........
Resource Management
- Narrative
1x Design dev working on 3 tasks (192% load) thru 2022-11-23
1x Design dev working on 3 tasks (192% load) thru 2022-11-23
..........................................................................................~~~~|~........
- Vehicle Content - EU
5x Art devs working on 13 tasks (59% load) thru 2022-12-15
5x Art devs working on 13 tasks (59% load) thru 2022-12-15
......................................................==============............==============|=======..
- Vehicle Content - US
1x Design dev working on 8 tasks (150% load) thru 2022-12-30
1x Art dev working on 10 tasks (152% load) thru 2023-01-20
1x Design dev working on 8 tasks (150% load) thru 2022-12-30
1x Art dev working on 10 tasks (152% load) thru 2023-01-20
................................................................................==============|=========
........................................................................................~~~~~~|.........
................................................................................==============|=========
- EU PU Gameplay Feature Team
2x Design devs will work on 3 tasks (96% load) starting 2022-12-07 thru 2022-12-20
2x Engineering devs will work on 3 tasks (192% load) starting 2022-12-07 thru 2022-12-20
2x Design devs will work on 3 tasks (96% load) starting 2022-12-07 thru 2022-12-20
2x Engineering devs will work on 3 tasks (192% load) starting 2022-12-07 thru 2022-12-20
..........................~~~~~~~~~~~~~~~~~...~~~~~...~~~~~~~~~~~~~~~~~~..~~~~~~~~~~~~~~~~~~~~|...~~~~~.
..........~~~~~~~~~.......=========================...========================================|...=====.
RSI Lynx
- Vehicle Content - EU
3x Art devs working on 12 tasks (126% load) thru 2022-12-15
1x Design dev working on 11 tasks (399% load) thru 2022-12-15
3x Art devs working on 12 tasks (126% load) thru 2022-12-15
1x Design dev working on 11 tasks (399% load) thru 2022-12-15
......................................................................................========|=======..
........................................................................................======|=======..
Satellites - Points of Interest
- Location Concept Art
2x Art devs working on 29 tasks (263% load) thru 2022-12-30
2x Art devs working on 29 tasks (263% load) thru 2022-12-30
......................................================........................================|=========
Ship CPU
(Scheduled work ending soon!)
- Vehicle Feature Team
1x Engineering dev working on 7 tasks (285% load) thru 2022-12-08
1x Engineering dev working on 7 tasks (285% load) thru 2022-12-08
......................................................................................========|=====....
SQ42 - Vehicle Support
- Audio
3x Audio devs working on 11 tasks (102% load) thru 2022-12-01
3x Audio devs working on 11 tasks (102% load) thru 2022-12-01
................................................................................==============|===..====
- SQ42 Art
1x Cinematics dev working on 5 tasks (167% load) thru 2022-12-30
1x Art dev working on 8 tasks (145% load) thru 2022-12-30
1x Cinematics dev working on 5 tasks (167% load) thru 2022-12-30
1x Art dev working on 8 tasks (145% load) thru 2022-12-30
..........................................................................................====|=========
..............................................................................================|=========
- Vehicle Content - EU
3x Design devs working on 18 tasks (149% load) thru 2022-12-08
3x Design devs working on 18 tasks (149% load) thru 2022-12-08
......................................................====================......==============|=====....
..............................................................................................|.........
- Vehicle Content - US
3x Tech Content devs working on 12 tasks (71% load) thru 2022-12-10
1x Design dev working on 14 tasks (141% load) thru 2023-03-17
2x Art devs working on 17 tasks (85% load) thru 2023-03-17
3x Tech Content devs working on 12 tasks (71% load) thru 2022-12-10
1x Design dev working on 14 tasks (141% load) thru 2023-03-17
2x Art devs working on 17 tasks (85% load) thru 2023-03-17
................................====................................................~~~~~~~~==|=======..
................................................................................==============|=========
................................................................................==============|=========
- Vehicle Feature Team
9x Engineering devs working on 13 tasks (34% load) thru 2022-12-08
9x Engineering devs working on 13 tasks (34% load) thru 2022-12-08
..............................................................................................|.........
..........................======......======..................................================|=====....
- Weapon Content Team
5x Art devs working on 14 tasks (120% load) thru 2022-12-22
5x Art devs working on 14 tasks (120% load) thru 2022-12-22
........................................................................====........======..==|=========
Stanton Fashion Clothing
(Scheduled work ending soon!)
- Character Tech Art
1x Tech Content dev working on 3 tasks (455% load) thru 2022-12-01
1x Tech Content dev working on 3 tasks (455% load) thru 2022-12-01
..........................................................................====....====........|===......
StarWords Improvements
- Tools Team
2x Engineering devs working on 11 tasks (113% load) thru 2022-12-29
2x Engineering devs working on 11 tasks (113% load) thru 2022-12-29
..=========...=========...=========...========~~~~~~~~~~~~~...=========...=====...============|=========
Subsumption Editor Integration
(Scheduled work ending soon!)
- AI Tech and Feature Team
1x Engineering dev working on 6 tasks (189% load) thru 2022-12-01
1x Engineering dev working on 6 tasks (189% load) thru 2022-12-01
..======================....====================........====================......============|===......
Time Trial Race Missions
- Mission Feature Team
1x Design dev working on 6 tasks (111% load) thru 2022-12-22
1x Design dev working on 6 tasks (111% load) thru 2022-12-22
............................................................................==================|=========
Unannounced Vehicle
(Scheduled work ending soon!)
- VFX Team
2x Art devs working on 3 tasks (192% load) thru 2022-11-24
2x Art devs working on 3 tasks (192% load) thru 2022-11-24
........................................................=====.............................====|=........
Unified Itemports - FPS
(Scheduled work ending soon!)
- Character Tech Art
5x Tech Content devs working on 7 tasks (93% load) thru 2022-12-01
5x Tech Content devs working on 7 tasks (93% load) thru 2022-12-01
......................................................====....========....................====|===......
Zero G Push & Pull
- Actor Tech Team
1x Engineering dev working on 8 tasks (165% load) thru 2022-12-29
1x Engineering dev working on 8 tasks (165% load) thru 2022-12-29
......................................................========================....============|=========
The following deliverables are scheduled to begin (or continue) work within two weeks
Artificial Gravity
- EU PU Gameplay Feature Team
1x Engineering dev will work on 3 tasks (192% load) starting 2022-12-07 thru 2022-12-20
1x Design dev will work on 3 tasks (385% load) starting 2022-12-07 thru 2022-12-20
1x Engineering dev will work on 3 tasks (192% load) starting 2022-12-07 thru 2022-12-20
1x Design dev will work on 3 tasks (385% load) starting 2022-12-07 thru 2022-12-20
..............................................................................~~~~~~~~~~~~~~~~|...~~~~~.
..............................................................................================|...=====.
- Narrative
1x Design dev will work on 4 tasks (93% load) starting 2022-11-24 thru 2022-12-30
1x Design dev will work on 4 tasks (93% load) starting 2022-11-24 thru 2022-12-30
..............................................................................................|~~~~~~~~~
Asteroid Facilities
- EU Sandbox 1
3x Art devs will work on 5 tasks (139% load) starting 2022-11-30 thru 2022-12-20
3x Art devs will work on 5 tasks (139% load) starting 2022-11-30 thru 2022-12-20
....................................................=====================...........=========.|.=======.
Chapter 24
- SQ42 Level Design 2 - Flight
2x Design devs will work on 2 tasks (46% load) starting 2022-11-24 thru 2022-12-30
2x Design devs will work on 2 tasks (46% load) starting 2022-11-24 thru 2022-12-30
..............................................................................................|=========
Chapter 28
(Starting soon!)
- SQ42 Character Art
1x Art dev will work on 3 tasks (455% load) starting 2022-12-04 thru 2022-12-15
1x Art dev will work on 3 tasks (455% load) starting 2022-12-04 thru 2022-12-15
..............................................................................................|...====..
FS-Tech-Anim - Asset Integration
- Tech Animation Team
7x Tech Content devs will work on 4 tasks (35% load) starting 2022-11-25 thru 2022-12-22
7x Tech Content devs will work on 4 tasks (35% load) starting 2022-11-25 thru 2022-12-22
..=========...................=====...=====.......=====...........=========...................|=========
Life Support T0
- EU PU Gameplay Feature Team
1x Design dev will work on 5 tasks (321% load) starting 2022-12-07 thru 2022-12-20
1x Engineering dev will work on 5 tasks (321% load) starting 2022-12-07 thru 2022-12-20
1x Design dev will work on 5 tasks (321% load) starting 2022-12-07 thru 2022-12-20
1x Engineering dev will work on 5 tasks (321% load) starting 2022-12-07 thru 2022-12-20
..~~~~~~~~~~~~~~~~~...~~~~~~~~~~~~~~~~~~~~~...~~~~~...~~~~~~~~~~~~~~~~~~..~~~~~~~~~~~~~~~~~~~~|...~~~~~.
..=================...=================...............==================..~~~~~~~~~~~~~~~~~~~~|...~~~~~.
New Player Experience
- EU Landing Zone 2
1x Art dev will work on 2 tasks (256% load) starting 2022-12-07 thru 2022-12-20
1x Art dev will work on 2 tasks (256% load) starting 2022-12-07 thru 2022-12-20
..............................................................................................|...=====.
- Narrative
1x Design dev will work on 3 tasks (69% load) starting 2022-11-24 thru 2022-12-30
1x Design dev will work on 3 tasks (69% load) starting 2022-11-24 thru 2022-12-30
........................................................====================......==========..|~~~~~~~~~
Outpost Theme Variants
- EU Sandbox 1
4x Design devs will work on 15 tasks (313% load) starting 2022-11-30 thru 2022-12-20
4x Design devs will work on 15 tasks (313% load) starting 2022-11-30 thru 2022-12-20
.~~~~~~~~~~~~~~.~~~~~~~~~~~~~~~~~~========....=======.......................=================.|.=======.
Vehicle Tractor Beams
- EU PU Gameplay Feature Team
2x Engineering devs will work on 2 tasks (128% load) starting 2022-12-07 thru 2022-12-20
2x Engineering devs will work on 2 tasks (128% load) starting 2022-12-07 thru 2022-12-20
..............................................................................................|...=====.
VOLT Parallax
(Scheduled work ending soon!)
- Narrative
1x Design dev will work on 3 tasks (385% load) starting 2022-11-24 thru 2022-12-07
1x Design dev will work on 3 tasks (385% load) starting 2022-11-24 thru 2022-12-07
..............................................................................................|=====....