ShinyTracker

RSI "Progress Tracker" Delta Reports

by ShinyHobo RSS

Scheduled Deliverables

as of 2022-10-26

There are currently 88 scheduled deliverables being worked on by 41 teams

10 deliverables are scheduled to begin work by 10 team(s) within two weeks


This report lists the actively assigned deliverables and the associated teams, along with the number of developers assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.

The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.

The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.


extra analysis (click me)


There are approximately 446 devs (out of ~512, or 87%) with 952 assignments scheduled to work on 88 observable deliverables. Of those deliverables, 28% are for SQ42 exclusively, with ~290 devs (57%) scheduled for approximately 2544 man-days. 31% of deliverables are shared between both projects.

12 deliverable(s) are not currently scheduled to continue work after this sprint: Below are the time breakdowns for each team:

Aerodynamic Control Surfaces

  • Vehicle Feature Team
    1x Engineering dev working on 7 tasks (167% load) thru 2022-12-08

..................................................................==========..========|=============....

AI - Untrained Combat

  • AI Tech and Feature Team
    2x Engineering devs working on 7 tasks (72% load) thru 2022-12-29

..................................................................................====|=================
..........==============............============................============..........|.................

AI - Usable System V2

  • AI Tech and Feature Team
    2x Engineering devs working on 3 tasks (64% load) thru 2022-11-17

..~~~~~~~~~~~~~~~~~~........~~~~~~~~~~~~~~~~====........====================......====|=======..........

AI - Vehicle Perception

  • AI Tech and Feature Team
    2x Engineering devs working on 5 tasks (62% load) thru 2022-12-15

................................................................================..====|===============..

Anvil Crucible

  • Vehicle Concept Art
    1x Art dev working on 9 tasks (326% load) thru 2022-11-17

................................................................................======|=======..........

AR and Map Marker System Rework

  • UI Tech Team
    2x Engineering devs working on 1 task (76% load) thru 2022-11-03

..................................==================....================..............|===....====......

Archon

  • SQ42 Art
    15x Art devs working on 2 tasks (8% load) thru 2022-10-26
    ↳ will continue 2022-11-10 with 15x devs

.==========================...........================........................========|=..======........

Arena Commander: Classic Race Mode Overhaul

  • Arena Commander Feature Team
    1x Design dev working on 12 tasks (111% load) thru 2022-12-22
    1x Engineering dev working on 12 tasks (111% load) thru 2022-12-22

........................................................====================~~~~~~====|=================
........................................................====================~~~~~~====|=================

Argo SRV

  • Vehicle Content - EU
    4x Art devs working on 44 tasks (63% load) thru 2023-02-02

................................======================================================|=================
................................~~~~~~~~~~~~~~~~~~....======================....==....|.................

Asteroid Facilities

  • EU Sandbox 1
    3x Art devs working on 4 tasks (82% load) thru 2022-11-15

....................................................=====================...........==|======...=======.

Atmospheric Pressure Damage

(Scheduled work ending soon!)

  • Narrative
    2x Design devs working on 1 task (32% load) thru 2022-10-26

..................................................................................~~~~|~................

Banu Merchantman

  • Vehicle Content - EU
    10x Art devs working on 26 tasks (26% load) thru 2023-03-16

..============~~~~~~~~==~~................======~~....~~~~~~~~~~~~~~~~~~~~~~..........|.................
..================================================..............................======|=================

Bounty Hunter V2

  • Mission Feature Team
    3x Design devs working on 14 tasks (34% load) thru 2022-12-22
    1x Engineering dev working on 6 tasks (182% load) thru 2022-11-17

....................................................~~~~~~~~~~~~~~~~~~~~~~~~==========|=================
............................................................................==========|=======..........

  • Systemic Services and Tools Team
    1x Engineering dev working on 6 tasks (204% load) thru 2022-11-17

..............................................................................========|=======..........

Bug Fixing & Tech Debt

  • AI Tech and Feature Team
    10x Engineering devs working on 6 tasks (12% load) thru 2022-12-29

..............====~~~~~~................====~~~~........========....============..====|=================

  • Arena Commander Feature Team
    2x Design devs working on 19 tasks (57% load) thru 2022-12-22

..~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~~~~~~~~~..............................|.................
..======================....================================================~~~~~~====|=================

  • Editor Team
    5x Engineering devs working on 3 tasks (26% load) thru 2022-11-17

..........=====.......=================.......................=====.......=====...====|=======..........

  • Live Tools Team
    4x Engineering devs working on 17 tasks (43% load) thru 2022-12-19

..........................============================================================|================.

  • Tools Team
    5x Engineering devs working on 6 tasks (25% load) thru 2022-12-29

..============================================~~~~~~~~~~~~=====================...====|=================

  • Audio
    27x Audio devs will work on 4 tasks (22% load) starting 2022-10-30 thru 2022-11-10

..==......==................~~~~~~~~~~~~....~~~~~~~~~~................................|.====............

Building Interiors

  • Location Concept Art
    7x Art devs working on 51 tasks (69% load) thru 2022-12-30

......................................================================================|=================

  • MTL Sandbox 1
    14x Art devs working on 44 tasks (76% load) thru 2022-12-07
    4x Design devs working on 12 tasks (72% load) thru 2022-12-07

.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~============........======================..========|=============....
..~~~~~~~~~~~~~~~~~~~~~...............................======================..========|=============....

Cargo System Refactor

  • US PU Gameplay Feature Team
    3x Engineering devs working on 4 tasks (21% load) thru 2022-11-17

..~~~~~~~~========~~~~~~~~~~~~================........~~~~~~~~~~~~~~~~........~~~~~~~~|~~~~~~~..........
..........................~~~~~~~~~~~~~~~~~~~~........................................|.................

Chapter 01

  • AI Content Team
    3x Design devs working on 4 tasks (37% load) thru 2022-12-01

..................................................................................====|===~~~~====......

  • Character Tech Art
    5x Tech Content devs working on 5 tasks (31% load) thru 2022-12-01

..................................................................============....====|===========......

  • Motion Capture Team
    2x Animation devs working on 3 tasks (51% load) thru 2022-11-09

..............................................................................========|=====............

  • SQ42 Character Art
    4x Art devs working on 2 tasks (33% load) thru 2022-11-03

......................................................========================....====|===....====......

  • VFX Team
    3x Art devs working on 6 tasks (60% load) thru 2022-11-24

..............................................................................========|=========........

  • Narrative
    2x Design devs will work on 1 task (32% load) starting 2022-11-10 thru 2022-11-23

..............................................................................======..|...~~~~~~........

Chapter 02

  • SQ42 UI Feature Team
    1x Art dev working on 1 task (152% load) thru 2022-11-03

......................................................................................|===..............

  • SQ42 Art
    4x Art devs will work on 5 tasks (20% load) starting 2022-10-27 thru 2022-12-30

......................................................==========================......|~~~~~~~====~~~~~~

Chapter 04

  • AI Content Team
    4x Design devs working on 7 tasks (44% load) thru 2022-12-15

........................................................~~~~~~~~~~~~..............====|===============..

  • AI Tech and Feature Team
    1x Engineering dev working on 4 tasks (126% load) thru 2022-12-15

......................................................................................|===============..

  • Motion Capture Team
    2x Animation devs working on 2 tasks (46% load) thru 2022-10-26

..............................................................................~~~~====|=................

  • SQ42 Art
    4x Art devs working on 5 tasks (27% load) thru 2022-10-26

..................................................................============~~~~~~~~|~................

  • SQ42 Character Art
    3x Art devs will work on 3 tasks (43% load) starting 2022-11-06 thru 2022-12-15

......................................................========....============........|...============..

Chapter 05

  • AI Content Team
    1x Design dev working on 3 tasks (128% load) thru 2022-11-17

..................................................................................====|=======..........

  • SQ42 Art
    7x Art devs working on 11 tasks (20% load) thru 2022-12-30

..................................................................====================|=================

  • SQ42 Character Art
    4x Art devs working on 6 tasks (37% load) thru 2022-12-15

......................................................========================....====|===============..

  • Tech Animation Team
    4x Tech Content devs working on 6 tasks (24% load) thru 2022-12-22

..................................................................................~~~~|~~~~~~~~~~~======

  • Motion Capture Team
    2x Animation devs will work on 2 tasks (128% load) starting 2022-10-27 thru 2022-11-09

......................................................................................|=====............

Chapter 06

  • Narrative
    2x Design devs working on 3 tasks (93% load) thru 2022-11-09

..................................................................................====|=====............

  • SQ42 Art
    3x Art devs working on 3 tasks (31% load) thru 2022-10-26

..............................................................................~~~~~~~~|~................

  • SQ42 UI Feature Team
    3x Art devs will work on 2 tasks (44% load) starting 2022-11-06 thru 2022-12-01

......................................................................................|...========......

Chapter 08

  • Cinematics Team
    2x Design devs working on 1 task (38% load) thru 2022-11-03
    3x Animation devs working on 1 task (25% load) thru 2022-11-03

.~~~~~~~~~~~~~~~~~~~~~~~~~~...........................................................|~~~..............
......................................................................................|~~~..............

  • SQ42 Art
    3x Art devs working on 4 tasks (41% load) thru 2022-10-26

..............................................................................~~~~~~~~|~................

  • SQ42 UI Feature Team
    1x Art dev will work on 1 task (152% load) starting 2022-11-06 thru 2022-11-17

......................................................................................|...====..........

Chapter 09

  • Cinematics Team
    3x Design devs working on 3 tasks (36% load) thru 2022-11-17

.~~~~~~~~~~~~~~~~~~~~~~~~~~.....~~~~~~~~~~................~~~~~~~~~...............====|=======..........
..................................................................................~~~~|.................

  • Narrative
    4x Design devs will work on 3 tasks (30% load) starting 2022-10-27 thru 2022-12-07

..............................................................................~~~~~~..|=============....

  • VFX Team
    1x Art dev will work on 2 tasks (123% load) starting 2022-10-28 thru 2022-11-24

......................................................................................|=========........

Chapter 10

(Scheduled work ending soon!)

  • SQ42 Art
    1x Art dev working on 1 task (64% load) thru 2022-10-26

..................................................................................~~~~|~................

Chapter 12

  • AI Tech and Feature Team
    1x Engineering dev working on 2 tasks (133% load) thru 2022-11-03

..................................................................................====|===..............

  • Character Tech Art
    3x Tech Content devs working on 4 tasks (42% load) thru 2022-12-15

......................................................................................|===============..

  • SQ42 Art
    13x Art devs working on 3 tasks (14% load) thru 2022-10-26

..........................============................==============..........========|=................

  • AI Content Team
    3x Design devs will work on 3 tasks (43% load) starting 2022-11-06 thru 2022-12-15

........................................................~~~~~~~~~~~~========..........|...============..

Chapter 13

(Scheduled work ending soon!)

  • SQ42 Art
    2x Art devs working on 3 tasks (46% load) thru 2022-10-26

..............................................................................~~~~~~~~|~................

Chapter 14

  • SQ42 Art
    11x Art devs working on 21 tasks (18% load) thru 2022-12-30

......................................................================================|=================
..........................========....................==========================......|.................

  • SQ42 Character Art
    1x Art dev will work on 3 tasks (128% load) starting 2022-11-06 thru 2022-12-15

......................................................................................|...============..

Chapter 15

  • Cinematics Team
    3x Animation devs working on 4 tasks (21% load) thru 2022-12-01

.~~~~~~~~~~~~~~~~~~~~~~~~~~.......................................................~~~~|.................
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~..~~~~|~~~~~~~~~~~......

  • Gameplay Story
    5x Animation devs working on 4 tasks (12% load) thru 2022-12-07

..............~~~~~...~~~~~~..............~~~~~~~~~~~~............................~~~~|~~~~~~~~~~~~~....

  • SQ42 Art
    2x Art devs working on 3 tasks (46% load) thru 2022-10-26

..............................................................................~~~~~~~~|~................

  • Narrative
    1x Design dev will work on 1 task (64% load) starting 2022-10-27 thru 2022-11-09

......................................................................................|~~~~~............

Chapter 16

  • Narrative
    1x Design dev working on 1 task (64% load) thru 2022-10-26

..................................................................................~~~~|~................

Chapter 17

  • Gameplay Story
    4x Animation devs working on 8 tasks (15% load) thru 2022-10-26

......................................................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~................

  • SQ42 Art
    2x Art devs working on 12 tasks (57% load) thru 2022-12-30

......................................................================================|=================

  • SQ42 UI Feature Team
    2x Art devs working on 3 tasks (64% load) thru 2022-12-01

......................................................................................|===========......

  • SQ42 Character Art
    1x Art dev will work on 1 task (152% load) starting 2022-11-06 thru 2022-11-17

......................................................................................|...====..........

Chapter 18

  • Cinematics Team
    2x Animation devs working on 3 tasks (50% load) thru 2022-11-03

..................................................................................~~~~|~~~..............

  • Gameplay Story
    4x Animation devs working on 8 tasks (15% load) thru 2022-10-26

..............~~~~~...........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~................

  • SQ42 Art
    4x Art devs working on 9 tasks (41% load) thru 2022-12-30

..............................................................................========|=================

Chapter 19

  • Cinematics Team
    3x Animation devs working on 4 tasks (36% load) thru 2022-11-17

..........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~..~~~~|~~~~~~~..........

  • Gameplay Story
    5x Animation devs working on 11 tasks (12% load) thru 2022-12-07

..................~~~~~.......~~~~~~~~........~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~....
..................................~~~~................................................|.................

  • Narrative
    1x Design dev working on 1 task (64% load) thru 2022-10-26

..................................................................................~~~~|~................

  • SQ42 Art
    6x Art devs will work on 6 tasks (22% load) starting 2022-10-27 thru 2022-12-30

..................................................................==============......|===~~~~==========

  • VFX Team
    1x Art dev will work on 2 tasks (123% load) starting 2022-10-28 thru 2022-11-24

......................................................................................|=========........

Chapter 20

  • Cinematics Team
    3x Animation devs working on 5 tasks (26% load) thru 2022-12-01
    3x Design devs working on 4 tasks (26% load) thru 2022-12-01

.~~~~~~~~~~~~~~~~~~~~~~~~~~.......................................................~~~~|~~~~~~~~~~~......
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~~~........~~~~|~~~====~~~~......

  • Gameplay Story
    4x Animation devs working on 11 tasks (15% load) thru 2022-12-07

..............................................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~....

Chapter 21

  • AI Content Team
    3x Design devs working on 4 tasks (37% load) thru 2022-12-15

......................................................................................|===~~~~========..

  • SQ42 Art
    2x Art devs will work on 3 tasks (46% load) starting 2022-10-27 thru 2022-11-23

......................................................................................|~~~~~~~~~........

Chapter 22

  • Cinematics Team
    2x Animation devs working on 5 tasks (39% load) thru 2022-12-01

..................................................................................~~~~|~~~~~~~~~~~......

  • Narrative
    1x Design dev working on 2 tasks (62% load) thru 2022-10-26

..............................................................................~~~~~~~~|~................

  • SQ42 Art
    1x Cinematics dev working on 3 tasks (122% load) thru 2022-11-09
    2x Art devs will work on 5 tasks (65% load) starting 2022-10-27 thru 2022-12-30

..............................................................................========|=====............
......................................................................................|=================

  • Gameplay Story
    4x Animation devs will work on 5 tasks (25% load) starting 2022-10-27 thru 2022-12-07

..............................................~~~~~~~~................................|~~~~~~~~~~~~~....

Chapter 25

  • Gameplay Story
    4x Animation devs working on 4 tasks (31% load) thru 2022-10-26
    ↳ will continue 2022-11-10 with 4x devs

..............................................................................~~~~~~~~|~..~~~~~~........

Chapter 26

  • SQ42 Character Art
    4x Art devs working on 6 tasks (47% load) thru 2022-12-15

......................................................................========........|===============..

  • Cinematics Team
    2x Animation devs will work on 3 tasks (50% load) starting 2022-11-06 thru 2022-12-01

......................................................................................|...~~~~~~~~......

  • Narrative
    1x Design dev will work on 1 task (128% load) starting 2022-11-10 thru 2022-11-23

......................................................................................|...======........

Character Work

  • Actor Feature Team
    1x Engineering dev working on 6 tasks (109% load) thru 2022-12-30
    1x Animation dev working on 4 tasks (247% load) thru 2022-11-09

..............................................................==========......========|=================
..................................................................................====|=====............

  • AI Content Team
    6x Animation devs working on 9 tasks (31% load) thru 2022-12-29

..======================....====================........================..........====|=================
..................======....................====......................................|.................

  • AI Tech and Feature Team
    1x Design dev working on 6 tasks (62% load) thru 2022-12-29
    4x Engineering devs working on 4 tasks (31% load) thru 2022-12-15

..==========................========....................========......................|.................
..................................................................................~~~~|~~~~~~~~~~~~~~~~~
..~~~~========~~~~~~........============~~~~............============..................|===============..

  • Audio
    6x Audio devs working on 19 tasks (23% load) thru 2022-11-17

....================..........========================================================|=======......====

  • Facial Animation
    9x Animation devs working on 12 tasks (24% load) thru 2022-12-30

....==========================================~~~~~~~~~~==============================|=================

  • Motion Capture Team
    9x Animation devs working on 15 tasks (19% load) thru 2022-12-30

......=========.......====~~~~~~~~~~~~~~~~........................========~~~~~~~~====|=================

  • Tech Animation Team
    11x Tech Content devs working on 14 tasks (23% load) thru 2022-12-22

..........~~~~~~~~~~~~~~~~~...~~~~=====...~~~~========~~~~~~~~=============...========|=================

Charge/Drain T0

  • Weapon Feature Team
    2x Engineering devs working on 9 tasks (77% load) thru 2022-11-23

........................................========~~~~~~~~..........====================|=========........

Cutting T2

  • Weapon Feature Team
    1x Engineering dev working on 8 tasks (145% load) thru 2022-12-30

..............................................................................========|=================

Derelict Spaceships - Points of Interest

  • MTL Sandbox 1
    4x Design devs working on 7 tasks (42% load) thru 2022-12-07
    8x Art devs working on 11 tasks (33% load) thru 2022-12-07

.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~============........======================..========|=============....
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~============........======================..========|=============....

Drake Corsair

(Scheduled work ending soon!)

  • Audio
    3x Audio devs working on 7 tasks (85% load) thru 2022-10-27

..........................................................................============|=................

  • VFX Team
    2x Art devs working on 3 tasks (40% load) thru 2022-11-10

................................................................=====.........~~~~~~~~|=====............

  • Vehicle Feature Team
    1x Design dev will work on 1 task (128% load) starting 2022-10-28 thru 2022-11-10

......................................................................................|=====............

Dynamic Events

  • Mission Feature Team
    7x Design devs working on 13 tasks (13% load) thru 2022-12-22
    3x Engineering devs working on 6 tasks (37% load) thru 2022-12-22

..================================================..~~~~~~~~~~~~~~~~~~~~~~~~==========|=================
..========================..................................................==========|=================

  • Systemic Services and Tools Team
    1x Engineering dev working on 3 tasks (135% load) thru 2022-11-05

..............................................................................========|=====............

  • US PU Gameplay Feature Team
    2x Design devs working on 4 tasks (63% load) thru 2022-11-17

..~~~~~~~~~~~~~~~~~.......~~~~~~~~~~~~~~~~~~~~........================........========|=======..........

  • VFX Team
    2x Art devs will work on 2 tasks (128% load) starting 2022-10-28 thru 2022-11-10

......................................................................................|=====............

Entity Properties Plugin

  • Editor Team
    1x Engineering dev working on 2 tasks (133% load) thru 2022-11-03

..=========...=========...............~~~~====~~~~~~~~~~~~=====...=========.......====|===....========..

EVA T2

  • Actor Tech Team
    2x Engineering devs working on 6 tasks (62% load) thru 2022-12-29

............................====================~~~~~~~~~~====================....====|=================

FPS Radar / Scanning

(Scheduled work ending soon!)

  • Actor Feature Team
    2x Engineering devs working on 3 tasks (61% load) thru 2022-10-26

..........==================================..........~~~~======..........============|=................
..~~~~~~~~~~~~~~~~~~~~~~~~~~..........................................................|.................

Freight Elevators

  • US PU Gameplay Feature Team
    2x Design devs working on 4 tasks (63% load) thru 2022-11-17
    2x Engineering devs working on 5 tasks (63% load) thru 2022-11-17

..............................................................................========|=======..........
..............................................................................~~~~~~~~|~~~~~~~..........

Frontier Clothing

  • SC Character Art
    15x Art devs working on 11 tasks (15% load) thru 2022-12-29

.=================================================....========================....====|=================

  • Character Tech Art
    5x Tech Content devs will work on 4 tasks (34% load) starting 2022-11-06 thru 2022-12-15

......................................========............========....========....====|...============..

Gen12 - Renderer T1

  • Engine Team
    4x Engineering devs working on 7 tasks (55% load) thru 2022-12-01

..=================.........================..........~~~~=============...........====|===========......

  • Graphics Team
    7x Engineering devs working on 6 tasks (23% load) thru 2022-12-04

..===================.....======================....====================........======|============.....

Hacking T0

(Scheduled work ending soon!)

  • SQ42 Art
    1x Art dev working on 2 tasks (123% load) thru 2022-11-09

......................................................................~~~~~~~~~~..====|=====............

  • Weapon Feature Team
    1x Engineering dev working on 2 tasks (123% load) thru 2022-10-26

..==============================================~~~~~~~~~~~~..................========|=................

HEX

  • Live Tools Team
    5x Engineering devs working on 47 tasks (53% load) thru 2022-12-19

..=====================...~~~~========================~~~~~~~~~~~~~~~~~~~~~~~~~~~~====|================.

Lorville Cityscape

  • MTL Sandbox 1
    4x Art devs working on 7 tasks (42% load) thru 2022-12-07

......................................................======================..========|=============....

  • Narrative
    2x Design devs working on 1 task (32% load) thru 2022-10-26

............................................~~~~....====..........................~~~~|~................

Map and Radar System Rework

  • Graphics Team
    1x Engineering dev working on 3 tasks (79% load) thru 2022-12-04

................................................................========........======|============.....

  • SQ42 UI Feature Team
    3x Engineering devs working on 6 tasks (50% load) thru 2022-12-15
    3x Art devs working on 1 task (51% load) thru 2022-11-03

..............................==============================================......====|===============..
..........................................==============....========..................|===........====..

  • UI Tech Team
    2x Engineering devs will work on 1 task (76% load) starting 2022-11-06 thru 2022-11-17

......========........................======....................====....========..====|...====..........

  • VFX Team
    1x Art dev will work on 1 task (128% load) starting 2022-10-28 thru 2022-11-10

......................................................................................|=====............

MFD Rework

  • UI Tech Team
    1x Engineering dev working on 1 task (152% load) thru 2022-11-03

................................................................========..............|===..............

  • Vehicle Feature Team
    8x Engineering devs working on 7 tasks (21% load) thru 2022-12-08

......................................................======================..========|=============....

MISC Hull C

  • Vehicle Content - EU
    2x Design devs working on 12 tasks (149% load) thru 2022-12-15

..........................................................================....==......|.................
..............................~~~~~~~~~~~~~~~~~~~~................................====|===============..

  • Vehicle Feature Team
    1x Design dev working on 4 tasks (247% load) thru 2022-11-10

..................................................................................====|=====............

Miscellaneous Support

  • Actor Feature Team
    3x Design devs working on 25 tasks (37% load) thru 2022-12-30
    2x Engineering devs working on 24 tasks (53% load) thru 2022-12-30
    4x Animation devs working on 25 tasks (28% load) thru 2022-12-30

..==============================================~~~~~~~~~~============================|=================
..==============================================~~~~~~~~~~============================|=================
..==============================================~~~~~~~~~~============================|=================
..==========================..........................................................|.................

  • Actor Tech Team
    5x Engineering devs working on 7 tasks (29% load) thru 2022-12-29

..~~~~~~~~~~~~~~~~~~~~======~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~====================....====|=================

  • AI Content Team
    2x Tech Content devs working on 7 tasks (36% load) thru 2022-12-29

..~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~........~~~~~~~~~~~~~~~~~~~~~~~~..~~~~|~~~~~~~~~~~~~~~~~
..................======....................====......................................|.................

  • Arena Commander Feature Team
    3x Engineering devs working on 25 tasks (38% load) thru 2022-12-22

........................================================..............................|.................
....====================~~~~================================================~~~~~~====|=================

  • Audio
    6x Audio devs working on 10 tasks (46% load) thru 2022-12-01

................................................................................======|===========..====

  • Editor Team
    1x Design dev working on 6 tasks (123% load) thru 2022-12-29
    3x Engineering devs working on 2 tasks (44% load) thru 2022-11-03

..============================================~~~~~~~~~~~~=====================...====|=================
......................................................~~~~=====...=========.......====|===....========..

  • Gameplay Story
    1x Tech Content dev working on 11 tasks (65% load) thru 2022-12-07

.=====.===============~~~~~~..====........~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~====~~~~~~~~|~~~~~~~~~~~~~....

  • Narrative
    1x Design dev working on 6 tasks (109% load) thru 2022-12-30

..............................................................................========|=================

  • Systemic Services and Tools Team
    4x Engineering devs working on 5 tasks (32% load) thru 2022-12-03

..............................................................................========|=============....

  • Tools Team
    2x Engineering devs working on 6 tasks (62% load) thru 2022-12-29

..============================================~~~~~~~~~~~~=====================...====|=================

  • UI Tech Team
    4x Engineering devs working on 4 tasks (31% load) thru 2022-12-01

..............................==========================................====......====|===========......

  • VFX Team
    2x Tech Content devs working on 2 tasks (60% load) thru 2022-10-27
    9x Art devs working on 3 tasks (20% load) thru 2022-10-27

......................=======================.................................========|=..======........
......................===============.........................................========|=................

  • Weapon Feature Team
    5x Design devs working on 28 tasks (24% load) thru 2022-12-30

..==============================================~~~~~~~~~~============================|=================
..........................................................................======......|...........======

mobiGlas Rework

  • SQ42 UI Feature Team
    1x Art dev working on 2 tasks (133% load) thru 2022-11-17

..........................................==================..........................|.................
....................................................................========..........|=======..........

  • Narrative
    1x Design dev will work on 1 task (64% load) starting 2022-10-27 thru 2022-11-09

......................................................................................|~~~~~............

New Missions - Orison

  • Mission Feature Team
    2x Design devs working on 10 tasks (51% load) thru 2022-11-17

....................................................========~~~~~~~~~~~~~~~~==========|=======..........
....................................................~~~~~~~~~~..........======........|.................

  • Narrative
    1x Design dev will work on 1 task (128% load) starting 2022-11-10 thru 2022-11-23

......................................................................................|...======........

New Player Experience

  • Narrative
    1x Design dev working on 2 tasks (123% load) thru 2022-11-09

........................................................====================......====|=====..~~~~~~~~~~

  • US PU Gameplay Feature Team
    1x Engineering dev working on 4 tasks (126% load) thru 2022-11-17
    1x Art dev working on 4 tasks (126% load) thru 2022-11-17

..............................................................................========|=======..........
..............................................................................========|=======..........

Ocean Shader Improvements

  • Graphics Team
    1x Engineering dev working on 2 tasks (81% load) thru 2022-12-04

......................................................................................|============.....

  • Planet Tech Team
    2x Engineering devs working on 6 tasks (72% load) thru 2022-12-07

..........................................=========...=====================...========|=============....

  • VFX Team
    1x Tech Content dev will work on 1 task (128% load) starting 2022-10-28 thru 2022-11-10
    2x Engineering devs will work on 3 tasks (93% load) starting 2022-10-28 thru 2022-11-24

......................................................................................|=====............
......................................................................................|=========........

Outpost Homestead - Independent & Outlaw

  • EU Sandbox 1
    12x Art devs working on 8 tasks (20% load) thru 2022-11-15

.~~~~~~~~~~.~~~~~~~~~~~~~~~.~~~~~~..................=====================.............|.................
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========....===========================...==========|======...=======.

Outpost Theme Variants

  • EU Sandbox 1
    4x Design devs working on 9 tasks (68% load) thru 2022-11-15

.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~========....=======.................................|.................
.~~~~~~~~~~~~~~.~~~~~~~~~~~~~~~~~~========....=======.......................==========|======...=======.

Persistent Streaming and Server Meshing

  • Engine Team
    1x Engineering dev working on 4 tasks (126% load) thru 2022-12-01

..................................................................................====|===========......

  • Game Services Team
    10x Engineering devs working on 25 tasks (18% load) thru 2022-12-29

..====================~~~~~~~~========================~~~~====================~~~~~~~~|~~~~~~~~~~~~~~~~~

  • Mission Feature Team
    3x Engineering devs working on 8 tasks (49% load) thru 2022-12-22

.~========================~~~~~~~~~~~~~~~~~~~~~~~~..........................==========|=================
......................................................................................|.................

  • Network Team
    9x Engineering devs working on 14 tasks (15% load) thru 2022-12-30

..=====.......============....................========================================|=================

  • Persistent Tech Team
    4x Engineering devs working on 20 tasks (47% load) thru 2022-12-30

..====================~~~~~~~~========================================================|=================

  • Vehicle Feature Team
    5x Engineering devs working on 16 tasks (35% load) thru 2022-12-08

......................................==============..================================|=============....

  • Systemic Services and Tools Team
    3x Engineering devs will work on 4 tasks (82% load) starting 2022-11-06 thru 2022-12-03

......................................................................................|...==========....

Physical Damage & Breakability

  • Physics Team
    3x Engineering devs working on 3 tasks (26% load) thru 2022-12-04

..===================.....======================....======================......======|============.....

Physics - Ropes Simulation

  • Physics Team
    1x Engineering dev working on 3 tasks (79% load) thru 2022-12-04

..===================.....======================....======================......======|============.....

Player Interaction Experience T0 - Hints & Interactions

(Scheduled work ending soon!)

  • Actor Feature Team
    3x Engineering devs working on 12 tasks (37% load) thru 2022-11-09

............................................====~~~~~~~~~~============================|=====............
..........................................................................==========..|.................

Player Interaction Experience T1 - Lockers & Inventory

(Scheduled work ending soon!)

  • Actor Feature Team
    1x Engineering dev working on 11 tasks (127% load) thru 2022-11-09

............................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~......|.................
......................................................================================|=====............

Player Interaction Experience T2 - Visor HUD & Helmet

  • SQ42 UI Feature Team
    1x Engineering dev working on 4 tasks (126% load) thru 2022-12-15
    1x Design dev working on 1 task (152% load) thru 2022-11-03

......................................................................................|===============..
......................................................................................|.......====......
......................................................................................|===........====..

  • Narrative
    1x Design dev will work on 1 task (64% load) starting 2022-10-27 thru 2022-11-09

......................................................................................|~~~~~............

Player/Machine Physical Interaction

  • Actor Feature Team
    1x Engineering dev working on 6 tasks (109% load) thru 2022-12-30
    1x Animation dev working on 6 tasks (109% load) thru 2022-12-30

..............................................................................========|=================
..............................................................................========|=================

Prone T1

  • Actor Feature Team
    1x Engineering dev working on 8 tasks (145% load) thru 2022-12-30
    1x Animation dev working on 8 tasks (145% load) thru 2022-12-30

..............................................................................========|=================
..............................................................................========|=================

Pyro System, Planet, and Mission Setup

  • Audio
    4x Audio devs working on 7 tasks (63% load) thru 2022-12-01

....................................................................======..........==|===========......

  • US PU Gameplay Feature Team
    1x Design dev working on 6 tasks (189% load) thru 2022-11-17

......................................========........================........========|=======..........

Quantum Simulation

  • Systemic Services and Tools Team
    5x Engineering devs working on 23 tasks (48% load) thru 2022-12-15

.=================================================....================================|===============..

Quantum Travel Experience

  • Physics Team
    1x Engineering dev working on 3 tasks (79% load) thru 2022-12-04

................................................................................======|============.....

  • Vehicle Feature Team
    3x Engineering devs working on 5 tasks (40% load) thru 2022-12-08

......................................==============..======================..========|=============....

  • VFX Team
    1x Art dev will work on 1 task (128% load) starting 2022-10-28 thru 2022-11-10

....................................=========.........................................|=====............

RaStar

  • Planet Tech Team
    3x Engineering devs working on 2 tasks (41% load) thru 2022-11-09

..=================================...=========.......=====================.......====|=====............

Resource Management

  • Vehicle Content - EU
    5x Art devs working on 11 tasks (50% load) thru 2022-12-15

......................................................==============............======|===============..

  • Vehicle Content - US
    1x Design dev working on 6 tasks (112% load) thru 2022-12-30
    1x Art dev working on 8 tasks (121% load) thru 2023-01-20
    3x Tech Content devs will work on 3 tasks (64% load) starting 2022-10-30 thru 2022-11-12

......................................................................................|.~~~~~~..........
................................................................................======|=================
................................................................................======|=================

  • Vehicle Feature Team
    4x Engineering devs working on 4 tasks (40% load) thru 2022-11-10
    2x Design devs working on 5 tasks (60% load) thru 2022-10-27

......................................==============..======================..========|=====............
......................................==============..............====================|=................

  • Narrative
    1x Design dev will work on 1 task (64% load) starting 2022-11-10 thru 2022-11-23

......................................................................................|...~~~~~~........

RSI Lynx

  • Vehicle Content - EU
    3x Art devs working on 10 tasks (105% load) thru 2022-12-15
    1x Design dev will work on 9 tasks (326% load) starting 2022-10-30 thru 2022-12-15

......................................................................................|===============..
......................................................................................|.==============..

Salvage T0

(Scheduled work ending soon!)

  • Vehicle Content - EU
    6x Art devs working on 8 tasks (57% load) thru 2022-11-10

........====..................==========............................==========..======|=====............
........======..............====......................................................|.................

Satellites - Points of Interest

  • Location Concept Art
    2x Art devs working on 25 tasks (226% load) thru 2022-12-30

......................................================........................========|=================

SQ42 - Vehicle Support

  • Audio
    3x Audio devs working on 9 tasks (83% load) thru 2022-12-01

................................................................................======|===========..====

  • SQ42 Art
    1x Art dev working on 6 tasks (109% load) thru 2022-12-30
    1x Cinematics dev will work on 3 tasks (100% load) starting 2022-11-10 thru 2022-12-30

..............................................................................========|=================
......................................................................................|...==============

  • SQ42 UI Feature Team
    1x Engineering dev working on 2 tasks (133% load) thru 2022-11-17

......................................................................................|=======..........

  • Vehicle Content - EU
    3x Design devs working on 12 tasks (100% load) thru 2022-12-08

......................................................====================......======|=============....
......................................................................................|.................

  • Vehicle Content - US
    3x Tech Content devs working on 6 tasks (40% load) thru 2022-12-10
    2x Art devs working on 13 tasks (65% load) thru 2023-03-17
    1x Design dev working on 12 tasks (120% load) thru 2023-03-17

................................====................................................~~|~~~~~==========..
................................................................................======|=================
................................................................................======|=================

  • Vehicle Feature Team
    9x Engineering devs working on 7 tasks (19% load) thru 2022-12-08

......................................................................................|.................
..........................======......======..................................========|=============....

  • Weapon Content Team
    5x Art devs working on 3 tasks (56% load) thru 2022-11-03

........................................................................====........==|===..============

StarWords Improvements

  • Tools Team
    2x Engineering devs working on 7 tasks (72% load) thru 2022-12-29

..=========...=========...=========...~~~~====~~~~~~~~~~~~~...=========...=====...====|=================

Subsumption Editor Integration

  • AI Tech and Feature Team
    1x Engineering dev working on 4 tasks (126% load) thru 2022-12-01

..======================....====================........====================......====|===========......

The Coil

(Scheduled work ending soon!)

  • VFX Team
    1x Art dev working on 1 task (128% load) thru 2022-10-27

..................................................................................====|=................

Unannounced Vehicle

(Scheduled work ending soon!)

  • Audio
    4x Audio devs working on 8 tasks (63% load) thru 2022-10-27

........................................................................==============|=................

  • Vehicle Content - EU
    1x Design dev working on 4 tasks (267% load) thru 2022-10-27

............................==========================================================|.................
............................~~~~~~~~~~~~~~~~~~~~~~....======================....======|=................

  • VFX Team
    2x Art devs working on 3 tasks (40% load) thru 2022-11-10

..............................................................................~~~~~~~~|=====............

Unannounced Vehicle

  • Vehicle Content - EU
    5x Art devs working on 13 tasks (59% load) thru 2022-12-15
    1x Design dev will work on 9 tasks (326% load) starting 2022-10-30 thru 2022-12-15

................................................................................======|===============..
......................................................................................|.==============..

Unannounced Vehicle

  • Vehicle Content - EU
    3x Design devs working on 22 tasks (93% load) thru 2022-10-27

..............============............................========================........|.................
..............========..........................~~....==~~~~~~~~~~~~~~~~~~~~==========|=................

  • Vehicle Content - US
    3x Tech Content devs working on 10 tasks (103% load) thru 2022-10-29

................................................................................~~~~~~|~~~..............

Unannounced Vehicle

  • Vehicle Concept Art
    1x Art dev working on 14 tasks (507% load) thru 2022-11-17

..................................................................==............======|=======..........

Virtual AI Service

(Scheduled work ending soon!)

  • Systemic Services and Tools Team
    2x Engineering devs working on 5 tasks (113% load) thru 2022-11-05

..................=====...............................==================......========|=====............

Zero G Push & Pull

  • Actor Tech Team
    1x Engineering dev working on 6 tasks (123% load) thru 2022-12-29

......................................................========================....====|=================


The following deliverables are scheduled to begin (or continue) work within two weeks

Aciedo Station

  • SQ42 Art
    4x Art devs will work on 2 tasks (31% load) starting 2022-10-27 thru 2022-11-23

......................................................................................|=========........

Chapter 07

  • Narrative
    2x Design devs will work on 1 task (32% load) starting 2022-11-10 thru 2022-11-23

..............................................................................~~~~~~..|...~~~~~~........

  • SQ42 Art
    3x Art devs will work on 1 task (43% load) starting 2022-10-27 thru 2022-11-09

......................................................................................|=====......======

Chapter 11

  • Tech Animation Team
    1x Tech Content dev will work on 1 task (128% load) starting 2022-10-28 thru 2022-11-10

......................................................................................|=====............

Chapter 23

  • Gameplay Story
    5x Animation devs will work on 5 tasks (20% load) starting 2022-10-27 thru 2022-12-07

..................~~~~~.......~~~~~~~~........~~~~~~~~~~~~~~..........................|~~~~~~~~~~~~~....

  • SQ42 Art
    2x Art devs will work on 3 tasks (46% load) starting 2022-10-27 thru 2022-11-23

......................................................................................|~~~~~~~~~........

Ladders T1

  • Actor Feature Team
    3x Animation devs will work on 3 tasks (128% load) starting 2022-11-10 thru 2022-11-23

............................====================~~~~~~~~~~======================......|...======........

Life Support T0

  • Narrative
    1x Design dev will work on 1 task (64% load) starting 2022-10-27 thru 2022-11-09

............................~~~~......................................................|~~~~~............

Pyro Space Stations

  • EU Landing Zone 1
    3x Design devs will work on 6 tasks (81% load) starting 2022-10-26 thru 2022-12-06

.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========....==========================..======......|============.....

Ship CPU

  • Vehicle Feature Team
    1x Engineering dev will work on 5 tasks (203% load) starting 2022-10-28 thru 2022-12-08

......................................................................................|=============....

Unannounced Vehicle

  • Audio
    1x Audio dev will work on 2 tasks (303% load) starting 2022-10-30 thru 2022-11-10

......................................................................................|.====............

Unified Itemports - FPS

  • Character Tech Art
    5x Tech Content devs will work on 3 tasks (40% load) starting 2022-11-06 thru 2022-12-01

......................................................====....========................|...========......