Scheduled Deliverables
as of 2022-09-14
There are currently 81 scheduled deliverables being worked on by 40 teams
19 deliverables are scheduled to begin work by 12 team(s) within two weeks
This report lists the actively assigned deliverables and the associated teams, along with the number of developers assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.
The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.
The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.
extra analysis (click me)
There are approximately 359 devs (out of ~512, or 70%) with 763 assignments scheduled to work on 81 observable deliverables. Of those deliverables, 32% are for SQ42 exclusively, with ~211 devs (41%) scheduled for approximately 2550 man-days. 25% of deliverables are shared between both projects.
49 deliverable(s) are not currently scheduled to continue work after this sprint:
- AI - Untrained Combat
- AI - Usable System V2
- AI - Utility
- AI - Vehicle Perception
- Arena Commander: Classic Race Mode Overhaul
- Chapter 01
- Chapter 02
- Chapter 04
- Chapter 05
- Chapter 06
- Chapter 09
- Chapter 10
- Chapter 11
- Chapter 12
- Chapter 13
- Chapter 14
- Chapter 15
- Chapter 17
- Chapter 18
- Chapter 19
- Chapter 20
- Chapter 22
- Chapter 23
- Chapter 25
- Chapter 26
- Datacore Deserializer
- DGS Crash Recovery
- DGS Mesh Node
- Dynamic Mission System
- Enemy Characters
- Enemy Ships
- EVA T2
- FPS Devices T1
- FPS Radar / Scanning
- Frontier Clothing
- Map and Radar System Rework
- mobiGlas Rework
- Replication Layer Entity Authority
- Rescue/Transport Mission
- Sandbox Prison Activities
- Save/Load
- Security Post Kareah Reactivation
- Stanton Fashion Clothing
- Subsumption Editor Integration
- Unannounced Vehicle
- VOLT Fresnel
- VOLT Parallax
- XenoThreat Armor
- Zero G Push & Pull
- Actor Feature Team
43% part-time with 166 task(s) scheduled, 48% of which are for SQ42 - Actor Tech Team
40% part-time with 50 task(s) scheduled, 43% of which are for SQ42 - AI Content Team
36% part-time with 28 task(s) scheduled, 83% of which are for SQ42 - AI Tech and Feature Team
full-time with 30 task(s) scheduled, 45% of which are for SQ42 - Arena Commander Feature Team
2% part-time with 44 task(s) scheduled, 33% of which are for SQ42 - Audio
2% part-time with 54 task(s) scheduled, 40% of which are for SQ42 - Character Tech Art
full-time with 10 task(s) scheduled, 33% of which are for SQ42 - Cinematics Team
91% part-time with 198 task(s) scheduled, all of which are for SQ42 - Editor Team
11% part-time with 18 task(s) scheduled, 50% of which are for SQ42 - Engine Team
8% part-time with 12 task(s) scheduled, 50% of which are for SQ42 - EU Landing Zone 1
full-time with 18 task(s) scheduled, 29% of which are for SQ42 - EU PU Gameplay Feature Team
full-time with 10 task(s) scheduled, all of which are for SC - EU Sandbox 1
full-time with 9 task(s) scheduled, 50% of which are for SQ42 - Facial Animation
7% part-time with 27 task(s) scheduled, 50% of which are for SQ42 - Game Services Team
full-time with 19 task(s) scheduled, all of which are for SC - Gameplay Story
99% part-time with 82 task(s) scheduled, 89% of which are for SQ42 - Graphics Team
full-time with 12 task(s) scheduled, 50% of which are for SQ42 - Live Tools Team
65% part-time with 52 task(s) scheduled, 33% of which are for SQ42 - Location Concept Art
full-time with 41 task(s) scheduled, all of which are for SC - Mission Feature Team
49% part-time with 68 task(s) scheduled, 10% of which are for SQ42 - Motion Capture Team
full-time with 9 task(s) scheduled, all of which are for SQ42 - MTL Sandbox 1
full-time with 89 task(s) scheduled, all of which are for SC - Narrative
full-time with 8 task(s) scheduled, 50% of which are for SQ42 - Network Team
full-time with 41 task(s) scheduled, all of which are for SC - Persistent Tech Team
full-time with 14 task(s) scheduled, all of which are for SC - Physics Team
full-time with 3 task(s) scheduled, 50% of which are for SQ42 - SC Character Art
full-time with 31 task(s) scheduled, 25% of which are for SQ42 - SQ42 Art
6% part-time with 99 task(s) scheduled, 92% of which are for SQ42 - SQ42 Character Art
full-time with 29 task(s) scheduled, all of which are for SQ42 - SQ42 Feature Team
full-time with 16 task(s) scheduled, 67% of which are for SQ42 - SQ42 Level Design 1 - FPS
full-time with 51 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 2 - Flight
full-time with 25 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 3 - Social
4% part-time with 26 task(s) scheduled, all of which are for SQ42 - SQ42 UI Feature Team
full-time with 26 task(s) scheduled, 50% of which are for SQ42 - Systemic Services and Tools Team
full-time with 18 task(s) scheduled, 25% of which are for SQ42 - Tools Team
11% part-time with 37 task(s) scheduled, 50% of which are for SQ42 - UI Tech Team
full-time with 5 task(s) scheduled, 50% of which are for SQ42 - US PU Gameplay Feature Team
30% part-time with 10 task(s) scheduled, 50% of which are for SQ42 - Vehicle Content - EU
10% part-time with 154 task(s) scheduled, 10% of which are for SQ42 - Vehicle Content - US
10% part-time with 21 task(s) scheduled, all of which are for SC - Vehicle Feature Team
full-time with 42 task(s) scheduled, 22% of which are for SQ42 - Weapon Content Team
full-time with 19 task(s) scheduled, 60% of which are for SQ42 - Weapon Feature Team
14% part-time with 44 task(s) scheduled, 50% of which are for SQ42
Aerodynamic Control Surfaces
- Vehicle Feature Team
1x Engineering dev working on 2 tasks (123% load) thru 2022-09-14
↳ will continue 2022-09-29 with 1x dev
1x Engineering dev working on 2 tasks (123% load) thru 2022-09-14
↳ will continue 2022-09-29 with 1x dev
..................................................................========|=..======================....
AI - Untrained Combat
(Scheduled work ending soon!)
- AI Tech and Feature Team
2x Animation devs working on 4 tasks (85% load) thru 2022-09-15
2x Animation devs working on 4 tasks (85% load) thru 2022-09-15
..........==============............============................==========|=............................
AI - Usable System V2
(Scheduled work ending soon!)
- AI Tech and Feature Team
2x Engineering devs working on 6 tasks (75% load) thru 2022-09-15
2x Engineering devs working on 6 tasks (75% load) thru 2022-09-15
..~~~~~~~~~~~~~~~~~~........~~~~~~~~~~~~~~~~====........==================|=............................
AI - Utility
(Scheduled work ending soon!)
- AI Content Team
1x Design dev working on 7 tasks (299% load) thru 2022-09-29
2x Animation devs working on 6 tasks (200% load) thru 2022-09-29
1x Design dev working on 7 tasks (299% load) thru 2022-09-29
2x Animation devs working on 6 tasks (200% load) thru 2022-09-29
....................................................................======|=====........................
................................................................====....==|=====........................
AI - Vehicle Perception
(Scheduled work ending soon!)
- AI Tech and Feature Team
1x Engineering dev working on 5 tasks (157% load) thru 2022-09-29
1x Engineering dev working on 5 tasks (157% load) thru 2022-09-29
................................................................==========|=====........................
Arena Commander: Classic Race Mode Overhaul
(Scheduled work ending soon!)
- Arena Commander Feature Team
1x Design dev working on 6 tasks (123% load) thru 2022-09-29
1x Engineering dev working on 6 tasks (123% load) thru 2022-09-29
1x Design dev working on 6 tasks (123% load) thru 2022-09-29
1x Engineering dev working on 6 tasks (123% load) thru 2022-09-29
........................................................==================|=====........................
........................................................==================|=====........................
Argo SRV
- Vehicle Content - EU
4x Art devs working on 42 tasks (60% load) thru 2023-02-02
1x Design dev working on 11 tasks (248% load) thru 2022-09-15
4x Art devs working on 42 tasks (60% load) thru 2023-02-02
1x Design dev working on 11 tasks (248% load) thru 2022-09-15
................................==========================================|=============================
................................~~~~~~~~~~~~~~~~~~....====================|=....==......................
- Vehicle Content - US
3x Tech Content devs will work on 3 tasks (64% load) starting 2022-09-15 thru 2022-09-28
3x Tech Content devs will work on 3 tasks (64% load) starting 2022-09-15 thru 2022-09-28
..........................................................................|~~~~~........................
Banu Merchantman
- Vehicle Content - EU
3x Design devs working on 11 tasks (41% load) thru 2022-09-15
3x Design devs working on 11 tasks (41% load) thru 2022-09-15
..================================================........................|.....========================
..============~~~~~~~~==~~................======~~....~~~~~~~~~~~~~~~~~~~~|~............................
Bounty Hunter V2
- EU Landing Zone 1
1x Art dev working on 2 tasks (123% load) thru 2022-09-28
1x Art dev working on 2 tasks (123% load) thru 2022-09-28
..........................................................................|.......=====.................
......................................................................====|=====........................
- Mission Feature Team
3x Design devs working on 12 tasks (32% load) thru 2022-12-22
1x Engineering dev will work on 4 tasks (121% load) starting 2022-09-23 thru 2022-11-17
3x Design devs working on 12 tasks (32% load) thru 2022-12-22
1x Engineering dev will work on 4 tasks (121% load) starting 2022-09-23 thru 2022-11-17
....................................................====~~~~~~~~~~~~~~~~~~|~============================
..........................................................................|.==================..........
- Systemic Services and Tools Team
1x Engineering dev will work on 4 tasks (136% load) starting 2022-09-29 thru 2022-11-17
1x Engineering dev will work on 4 tasks (136% load) starting 2022-09-29 thru 2022-11-17
..........................................................................|...================..........
Bug Fixing & Tech Debt
- AI Tech and Feature Team
10x Engineering devs working on 4 tasks (17% load) thru 2022-09-29
10x Engineering devs working on 4 tasks (17% load) thru 2022-09-29
..............====~~~~~~................====~~~~........========....======|=====........................
- Arena Commander Feature Team
2x Design devs working on 13 tasks (61% load) thru 2022-09-29
2x Design devs working on 13 tasks (61% load) thru 2022-09-29
..======================....==============================================|=====........................
..~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~~~~~~~~~..................|.............................
- Character Tech Art
6x Tech Content devs working on 2 tasks (51% load) thru 2022-09-22
6x Tech Content devs working on 2 tasks (51% load) thru 2022-09-22
..============........................============........====............|===..........................
- EU Landing Zone 1
5x Design devs working on 2 tasks (51% load) thru 2022-09-14
15x Art devs working on 11 tasks (94% load) thru 2022-09-14
5x Design devs working on 2 tasks (51% load) thru 2022-09-14
15x Art devs working on 11 tasks (94% load) thru 2022-09-14
..............~~~~~~~~~...................====........................====|=......................======
..............~~~~~~~~~...................====........................====|=......................======
- EU Sandbox 1
13x Art devs working on 6 tasks (59% load) thru 2022-09-20
6x Design devs working on 3 tasks (64% load) thru 2022-09-20
13x Art devs working on 6 tasks (59% load) thru 2022-09-20
6x Design devs working on 3 tasks (64% load) thru 2022-09-20
..............~~~~~~~~~...................====..........................==|==...............=====.......
..............~~~~~~~~~...................====..........................==|==...............=====.......
- Graphics Team
10x Engineering devs working on 10 tasks (64% load) thru 2022-09-27
2x Tech Content devs working on 2 tasks (64% load) thru 2022-09-27
10x Engineering devs working on 10 tasks (64% load) thru 2022-09-27
2x Tech Content devs working on 2 tasks (64% load) thru 2022-09-27
....................=======...................========................====|====.........................
....................~~~~~~~...................========................====|====.........................
- Live Tools Team
4x Engineering devs working on 13 tasks (33% load) thru 2022-12-19
4x Engineering devs working on 13 tasks (33% load) thru 2022-12-19
..........................================================================|============================.
- Mission Feature Team
3x Engineering devs working on 4 tasks (40% load) thru 2022-09-22
3x Engineering devs working on 4 tasks (40% load) thru 2022-09-22
............................................................==============|===..........................
..........................................................................|.................============
- Physics Team
4x Engineering devs working on 3 tasks (63% load) thru 2022-09-29
4x Engineering devs working on 3 tasks (63% load) thru 2022-09-29
..====================================================..................==|=====........................
- SC Character Art
7x Art devs working on 1 task (22% load) thru 2022-09-22
7x Art devs working on 1 task (22% load) thru 2022-09-22
..............................................................========....|===..........................
- Systemic Services and Tools Team
6x Engineering devs working on 2 tasks (21% load) thru 2022-09-28
6x Engineering devs working on 2 tasks (21% load) thru 2022-09-28
..................=========...................====....................====|=====..................====..
- US PU Gameplay Feature Team
5x Design devs working on 4 tasks (53% load) thru 2022-09-22
5x Engineering devs working on 4 tasks (33% load) thru 2022-09-22
3x Art devs working on 2 tasks (44% load) thru 2022-09-22
5x Design devs working on 4 tasks (53% load) thru 2022-09-22
5x Engineering devs working on 4 tasks (33% load) thru 2022-09-22
3x Art devs working on 2 tasks (44% load) thru 2022-09-22
..............========~~~~~...................====....................====|===................==========
..................~~~~~~~~~...................====....................~~~~|~~~................~~~~~~~~~~
..................~~~~~~~~~...................====....................====|===................==========
- Editor Team
5x Engineering devs will work on 4 tasks (103% load) starting 2022-09-14 thru 2022-09-27
5x Engineering devs will work on 4 tasks (103% load) starting 2022-09-14 thru 2022-09-27
..........=====.......=================.......................=====.......|====.........................
- SQ42 UI Feature Team
2x Engineering devs will work on 2 tasks (152% load) starting 2022-09-18 thru 2022-09-29
2x Engineering devs will work on 2 tasks (152% load) starting 2022-09-18 thru 2022-09-29
..............................====..............============..............|.====........................
- UI Tech Team
4x Engineering devs will work on 3 tasks (114% load) starting 2022-09-18 thru 2022-09-29
4x Engineering devs will work on 3 tasks (114% load) starting 2022-09-18 thru 2022-09-29
..====........................====..............================..........|.====........................
- Vehicle Feature Team
2x Design devs will work on 1 task (60% load) starting 2022-09-29 thru 2022-10-13
2x Design devs will work on 1 task (60% load) starting 2022-09-29 thru 2022-10-13
..........................======..........................................|...======....................
Building Interiors
- Location Concept Art
7x Art devs working on 41 tasks (55% load) thru 2022-12-30
7x Art devs working on 41 tasks (55% load) thru 2022-12-30
......................................====================================|=============================
- MTL Sandbox 1
14x Art devs working on 40 tasks (69% load) thru 2022-09-14
↳ will continue 2022-09-29 with 14x devs
4x Design devs working on 16 tasks (97% load) thru 2022-09-14
↳ will continue 2022-09-29 with 4x devs
14x Art devs working on 40 tasks (69% load) thru 2022-09-14
↳ will continue 2022-09-29 with 14x devs
4x Design devs working on 16 tasks (97% load) thru 2022-09-14
↳ will continue 2022-09-29 with 4x devs
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~============........====================|=..======================....
..~~~~~~~~~~~~~~~~~~~~~...............................====================|=..======================....
Cargo System Refactor
- Actor Feature Team
1x Engineering dev working on 1 task (128% load) thru 2022-09-14
1x Engineering dev working on 1 task (128% load) thru 2022-09-14
..==========................====............~~~~~~~~~~~~..............====|=............................
- US PU Gameplay Feature Team
3x Engineering devs will work on 4 tasks (21% load) starting 2022-09-25 thru 2022-11-17
3x Engineering devs will work on 4 tasks (21% load) starting 2022-09-25 thru 2022-11-17
..~~~~~~~~========~~~~~~~~~~~~================........~~~~~~~~~~~~~~~~....|...~~~~~~~~~~~~~~~~..........
Chapter 01
(Scheduled work ending soon!)
- Character Tech Art
2x Tech Content devs working on 3 tasks (64% load) thru 2022-09-22
2x Tech Content devs working on 3 tasks (64% load) thru 2022-09-22
..................................................................========|===..........................
- Cinematics Team
3x Animation devs working on 28 tasks (17% load) thru 2022-09-29
2x Design devs working on 20 tasks (20% load) thru 2022-09-29
3x Animation devs working on 28 tasks (17% load) thru 2022-09-29
2x Design devs working on 20 tasks (20% load) thru 2022-09-29
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
.~~~~~~~~~~~~~~~~~~~~~~~~~======~~~~~~~~~~~~~~~~~~~~======~~~~~~~~~~~~~~~~|~~~~~........................
- SQ42 Art
9x Art devs working on 3 tasks (14% load) thru 2022-09-28
9x Art devs working on 3 tasks (14% load) thru 2022-09-28
..................................................................========|=====........................
- SQ42 Character Art
3x Art devs working on 7 tasks (48% load) thru 2022-09-22
3x Art devs working on 7 tasks (48% load) thru 2022-09-22
......................................................====================|===..........................
- SQ42 Level Design 2 - Flight
5x Design devs working on 7 tasks (28% load) thru 2022-09-28
5x Design devs working on 7 tasks (28% load) thru 2022-09-28
.=====================~~~~~~~~======================..====================|=====........................
- SQ42 Level Design 3 - Social
3x Design devs working on 2 tasks (41% load) thru 2022-09-28
3x Design devs working on 2 tasks (41% load) thru 2022-09-28
..~~~~~~~~~~~~~~~~======..====....====....==================..======..====|=====........................
Chapter 02
(Scheduled work ending soon!)
- Cinematics Team
1x Design dev working on 5 tasks (93% load) thru 2022-09-29
1x Design dev working on 5 tasks (93% load) thru 2022-09-29
........................................~~~~~~~~~~~~~~............~~~~~~~~|~~~~~........................
..........................~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~~~|.............................
- SQ42 Art
2x Art devs working on 9 tasks (90% load) thru 2022-09-28
2x Art devs working on 9 tasks (90% load) thru 2022-09-28
......................................................====================|=====........................
Chapter 04
(Scheduled work ending soon!)
- Gameplay Story
5x Animation devs working on 11 tasks (22% load) thru 2022-09-28
5x Animation devs working on 11 tasks (22% load) thru 2022-09-28
.......~~~~...........................~~~~....~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
......................................~~~~................................|.............................
- SQ42 Art
1x Art dev working on 4 tasks (163% load) thru 2022-09-28
1x Art dev working on 4 tasks (163% load) thru 2022-09-28
..................................................................========|=====........................
- SQ42 Character Art
3x Art devs working on 4 tasks (57% load) thru 2022-09-22
3x Art devs working on 4 tasks (57% load) thru 2022-09-22
......................................................========....========|===..........................
Chapter 05
(Scheduled work ending soon!)
- SQ42 Art
6x Art devs working on 5 tasks (34% load) thru 2022-09-28
6x Art devs working on 5 tasks (34% load) thru 2022-09-28
..................................................................========|=====........................
- SQ42 Character Art
2x Art devs working on 7 tasks (72% load) thru 2022-09-22
2x Art devs working on 7 tasks (72% load) thru 2022-09-22
......................................................====================|===..........................
Chapter 06
(Scheduled work ending soon!)
- Gameplay Story
5x Animation devs working on 20 tasks (40% load) thru 2022-09-28
5x Animation devs working on 20 tasks (40% load) thru 2022-09-28
.~~~~~.~~~~~~~~.......~~~~~~..~~~~~~~~~~~~............~~~~~~~~~~~~~~~~~~~~|~~~~~........................
..................................~~~~~~~~................................|.............................
- SQ42 Level Design 3 - Social
2x Design devs working on 9 tasks (90% load) thru 2022-09-28
2x Design devs working on 9 tasks (90% load) thru 2022-09-28
..====~~~~~~~~~~~~======..================================================|=====........................
Chapter 09
(Scheduled work ending soon!)
- SQ42 Character Art
1x Art dev working on 2 tasks (303% load) thru 2022-09-22
1x Art dev working on 2 tasks (303% load) thru 2022-09-22
..........................................................................|===..........................
Chapter 10
(Scheduled work ending soon!)
- Gameplay Story
5x Animation devs working on 10 tasks (20% load) thru 2022-09-28
5x Animation devs working on 10 tasks (20% load) thru 2022-09-28
.......~~~~~~~~.......~~~~~~~~~~~~~~~~~~~~............~~~~~~~~~~~~~~~~~~~~|~~~~~........................
..........................~~~~....~~~~~~~~................................|.............................
- SQ42 Level Design 3 - Social
1x Design dev working on 9 tasks (171% load) thru 2022-09-28
1x Design dev working on 9 tasks (171% load) thru 2022-09-28
..~~~~~~..................========~~~~========================~~~~========|=====........................
Chapter 11
(Scheduled work ending soon!)
- Cinematics Team
3x Design devs working on 6 tasks (24% load) thru 2022-09-29
2x Animation devs working on 4 tasks (83% load) thru 2022-09-29
3x Design devs working on 6 tasks (24% load) thru 2022-09-29
2x Animation devs working on 4 tasks (83% load) thru 2022-09-29
.~~~~~~~~~~~~~~~~~~~~~~~~~~.....~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~|~~~~~........................
..........................~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~~.....~~|~~~~~........................
- SQ42 Level Design 1 - FPS
5x Design devs working on 6 tasks (49% load) thru 2022-09-14
5x Design devs working on 6 tasks (49% load) thru 2022-09-14
.=====================~~~~~~~~....============........======..============|=............................
Chapter 12
(Scheduled work ending soon!)
- AI Content Team
1x Animation dev working on 2 tasks (303% load) thru 2022-09-15
2x Design devs working on 6 tasks (50% load) thru 2022-09-15
1x Animation dev working on 2 tasks (303% load) thru 2022-09-15
2x Design devs working on 6 tasks (50% load) thru 2022-09-15
........................................................................==|=............................
........................................................~~~~~~~~~~~~======|=............................
- Cinematics Team
3x Design devs working on 29 tasks (13% load) thru 2022-09-29
4x Animation devs working on 19 tasks (11% load) thru 2022-09-29
3x Design devs working on 29 tasks (13% load) thru 2022-09-29
4x Animation devs working on 19 tasks (11% load) thru 2022-09-29
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
- SQ42 Character Art
2x Art devs working on 6 tasks (75% load) thru 2022-09-22
2x Art devs working on 6 tasks (75% load) thru 2022-09-22
..........................................................================|===..........................
- SQ42 Level Design 1 - FPS
4x Design devs working on 9 tasks (45% load) thru 2022-09-28
4x Design devs working on 9 tasks (45% load) thru 2022-09-28
.=====~~~~~~~~~~~~~~~~~~~~~~~~============================================|=====........................
- SQ42 Level Design 2 - Flight
5x Design devs working on 9 tasks (36% load) thru 2022-09-28
5x Design devs working on 9 tasks (36% load) thru 2022-09-28
..........................~~~~======================..====================|=====........................
Chapter 13
(Scheduled work ending soon!)
- SQ42 Level Design 3 - Social
1x Design dev working on 6 tasks (244% load) thru 2022-09-28
1x Design dev working on 6 tasks (244% load) thru 2022-09-28
..~~~~~~~~~~~~~~~~~~..................================............========|=====........................
Chapter 14
(Scheduled work ending soon!)
- Audio
1x Audio dev working on 8 tasks (290% load) thru 2022-09-29
1x Audio dev working on 8 tasks (290% load) thru 2022-09-29
..................................................................========|=====........................
- Cinematics Team
3x Animation devs working on 11 tasks (17% load) thru 2022-09-29
3x Design devs working on 11 tasks (17% load) thru 2022-09-29
3x Animation devs working on 11 tasks (17% load) thru 2022-09-29
3x Design devs working on 11 tasks (17% load) thru 2022-09-29
..........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
..........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
- SQ42 Art
11x Art devs working on 25 tasks (46% load) thru 2022-09-28
1x Cinematics dev working on 7 tasks (141% load) thru 2022-09-28
11x Art devs working on 25 tasks (46% load) thru 2022-09-28
1x Cinematics dev working on 7 tasks (141% load) thru 2022-09-28
......................................................====================|=====........................
..........................========....................====================|=====........................
- SQ42 Level Design 1 - FPS
7x Design devs working on 17 tasks (49% load) thru 2022-09-28
7x Design devs working on 17 tasks (49% load) thru 2022-09-28
.=====================~~~~~~~~============================================|=====........................
- SQ42 Level Design 2 - Flight
5x Design devs working on 9 tasks (36% load) thru 2022-09-28
5x Design devs working on 9 tasks (36% load) thru 2022-09-28
......================~~~~~~~~======================..====================|=====........................
Chapter 15
(Scheduled work ending soon!)
- Cinematics Team
3x Animation devs working on 31 tasks (16% load) thru 2022-09-29
3x Animation devs working on 31 tasks (16% load) thru 2022-09-29
.~~~~~~~~~~~~~~~~~~~~~~~~~~...............................................|.............................
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
Chapter 17
(Scheduled work ending soon!)
- Gameplay Story
4x Animation devs working on 9 tasks (23% load) thru 2022-09-28
4x Animation devs working on 9 tasks (23% load) thru 2022-09-28
......................................................~~~~~~~~~~~~~~~~~~~~|~~~~~........................
- SQ42 Art
1x Art dev working on 9 tasks (181% load) thru 2022-09-28
1x Art dev working on 9 tasks (181% load) thru 2022-09-28
......................................................====================|=====........................
Chapter 18
(Scheduled work ending soon!)
- Gameplay Story
4x Animation devs working on 7 tasks (18% load) thru 2022-09-28
4x Animation devs working on 7 tasks (18% load) thru 2022-09-28
..............~~~~~...........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
Chapter 19
(Scheduled work ending soon!)
- Cinematics Team
2x Animation devs working on 11 tasks (25% load) thru 2022-09-29
2x Animation devs working on 11 tasks (25% load) thru 2022-09-29
..........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
- Gameplay Story
5x Animation devs working on 9 tasks (18% load) thru 2022-09-28
5x Animation devs working on 9 tasks (18% load) thru 2022-09-28
..................~~~~~.......~~~~~~~~........~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
..................................~~~~....................................|.............................
- SQ42 Art
3x Art devs working on 14 tasks (183% load) thru 2022-09-28
3x Art devs working on 14 tasks (183% load) thru 2022-09-28
..................................................................========|=====........................
- SQ42 Level Design 1 - FPS
3x Design devs working on 9 tasks (185% load) thru 2022-09-28
3x Design devs working on 9 tasks (185% load) thru 2022-09-28
......~~~~~~~~~~~~~~~~~~~~~~..............============................====|=====........................
Chapter 20
(Scheduled work ending soon!)
- Gameplay Story
4x Animation devs working on 10 tasks (25% load) thru 2022-09-28
4x Animation devs working on 10 tasks (25% load) thru 2022-09-28
..............................................~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
- SQ42 Art
2x Art devs working on 9 tasks (90% load) thru 2022-09-28
2x Art devs working on 9 tasks (90% load) thru 2022-09-28
......................................................====================|=====........................
Chapter 22
(Scheduled work ending soon!)
- SQ42 Level Design 1 - FPS
6x Design devs working on 5 tasks (51% load) thru 2022-09-28
6x Design devs working on 5 tasks (51% load) thru 2022-09-28
......~~~~============~~~~~~..............============................====|=====........................
Chapter 23
(Scheduled work ending soon!)
- Cinematics Team
3x Animation devs working on 19 tasks (29% load) thru 2022-09-29
3x Animation devs working on 19 tasks (29% load) thru 2022-09-29
..........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
.~~~~~~~~~~~~~~~~~~~~~~~~~~...............................................|.............................
Chapter 25
(Scheduled work ending soon!)
- Cinematics Team
1x Design dev working on 4 tasks (167% load) thru 2022-09-29
1x Design dev working on 4 tasks (167% load) thru 2022-09-29
..........................~~~~~~~~............~~~~~~~~~~~~~~............~~|~~~~~........................
Chapter 26
(Scheduled work ending soon!)
- SQ42 Character Art
1x Art dev working on 3 tasks (200% load) thru 2022-09-22
1x Art dev working on 3 tasks (200% load) thru 2022-09-22
......................................................................====|===..........................
- SQ42 Level Design 1 - FPS
8x Design devs working on 5 tasks (39% load) thru 2022-09-28
8x Design devs working on 5 tasks (39% load) thru 2022-09-28
.===========================..............============................====|=====........................
Character Work
- Audio
5x Audio devs working on 12 tasks (22% load) thru 2022-09-29
5x Audio devs working on 12 tasks (22% load) thru 2022-09-29
....================..........============================================|=====........................
- Facial Animation
7x Animation devs working on 18 tasks (16% load) thru 2022-09-22
7x Animation devs working on 18 tasks (16% load) thru 2022-09-22
....==========================================~~~~~~~~~~==================|===..........................
- Motion Capture Team
9x Animation devs working on 9 tasks (36% load) thru 2022-09-29
9x Animation devs working on 9 tasks (36% load) thru 2022-09-29
......=========.......~~~~~~~~~~~~~~~~~~~~........................========|=====........................
- Narrative
3x Design devs working on 3 tasks (67% load) thru 2022-09-15
3x Design devs working on 3 tasks (67% load) thru 2022-09-15
....................................................................======|=............................
- Actor Feature Team
1x Engineering dev will work on 6 tasks (109% load) starting 2022-09-29 thru 2022-12-30
1x Engineering dev will work on 6 tasks (109% load) starting 2022-09-29 thru 2022-12-30
..............................................................==========..|...==========================
Charge/Drain T0
- Weapon Feature Team
2x Engineering devs working on 7 tasks (60% load) thru 2022-11-23
2x Engineering devs working on 7 tasks (60% load) thru 2022-11-23
........................................========~~~~~~~~..........========|=====================........
Datacore Deserializer
(Scheduled work ending soon!)
- Systemic Services and Tools Team
1x Engineering dev working on 1 task (128% load) thru 2022-09-14
1x Engineering dev working on 1 task (128% load) thru 2022-09-14
..........................====================........................====|=............................
Derelict Spaceships - Points of Interest
- Audio
4x Audio devs working on 5 tasks (65% load) thru 2022-09-15
4x Audio devs working on 5 tasks (65% load) thru 2022-09-15
..............................~~~~~~~~~~~~~~~~~~~~~~~~~~~~==......========|=............................
- MTL Sandbox 1
4x Design devs working on 6 tasks (36% load) thru 2022-09-14
↳ will continue 2022-09-29 with 4x devs
8x Art devs working on 11 tasks (33% load) thru 2022-09-14
↳ will continue 2022-09-29 with 8x devs
4x Design devs working on 6 tasks (36% load) thru 2022-09-14
↳ will continue 2022-09-29 with 4x devs
8x Art devs working on 11 tasks (33% load) thru 2022-09-14
↳ will continue 2022-09-29 with 8x devs
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~============........====================|=..======================....
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~============........====================|=..======================....
DGS Crash Recovery
(Scheduled work ending soon!)
- Network Team
1x Engineering dev working on 10 tasks (201% load) thru 2022-09-28
1x Engineering dev working on 10 tasks (201% load) thru 2022-09-28
..................========================================================|=====........................
DGS Mesh Node
(Scheduled work ending soon!)
- Network Team
3x Engineering devs working on 10 tasks (67% load) thru 2022-09-28
3x Engineering devs working on 10 tasks (67% load) thru 2022-09-28
..................========================================================|=====........................
Drake Corsair
- Audio
2x Audio devs working on 4 tasks (185% load) thru 2022-09-29
2x Audio devs working on 4 tasks (185% load) thru 2022-09-29
..........................................................................|=====........................
- Vehicle Content - US
3x Tech Content devs working on 5 tasks (51% load) thru 2022-10-15
6x Art devs working on 9 tasks (30% load) thru 2022-09-28
2x Design devs working on 7 tasks (70% load) thru 2022-09-28
3x Tech Content devs working on 5 tasks (51% load) thru 2022-10-15
6x Art devs working on 9 tasks (30% load) thru 2022-09-28
2x Design devs working on 7 tasks (70% load) thru 2022-09-28
........................................~~~~..........................~~~~|~~~~~~~~~~~..................
..======================....========================..====================|=====........................
..======================....========================..====================|=====........................
Dynamic Events
- Mission Feature Team
7x Design devs working on 17 tasks (16% load) thru 2022-12-22
3x Engineering devs will work on 10 tasks (62% load) starting 2022-09-23 thru 2022-12-22
7x Design devs working on 17 tasks (16% load) thru 2022-12-22
3x Engineering devs will work on 10 tasks (62% load) starting 2022-09-23 thru 2022-12-22
..========================................................................|.============================
..================================================..~~~~~~~~~~~~~~~~~~~~~~|~============================
- Systemic Services and Tools Team
1x Engineering dev will work on 3 tasks (135% load) starting 2022-09-29 thru 2022-11-05
1x Engineering dev will work on 3 tasks (135% load) starting 2022-09-29 thru 2022-11-05
..........................................................................|...==============............
- US PU Gameplay Feature Team
2x Design devs will work on 4 tasks (63% load) starting 2022-09-25 thru 2022-11-17
2x Design devs will work on 4 tasks (63% load) starting 2022-09-25 thru 2022-11-17
..~~~~~~~~~~~~~~~~~.......~~~~~~~~~~~~~~~~~~~~........================....|...================..........
Dynamic Mission System
(Scheduled work ending soon!)
- Mission Feature Team
1x Engineering dev working on 8 tasks (80% load) thru 2022-09-22
1x Engineering dev working on 8 tasks (80% load) thru 2022-09-22
..........................~~~~~~~~~~~~~~~~~~~~~~~~..~~~~~~~~~~~~~~~~~~~~~~|~~~..........................
Enemy Characters
(Scheduled work ending soon!)
- Weapon Content Team
5x Art devs working on 4 tasks (53% load) thru 2022-09-29
5x Art devs working on 4 tasks (53% load) thru 2022-09-29
......................................................~~....========....==|=====........................
............................................................====..........|.............................
Enemy Ships
(Scheduled work ending soon!)
- SQ42 Art
1x Art dev working on 9 tasks (181% load) thru 2022-09-28
1x Art dev working on 9 tasks (181% load) thru 2022-09-28
......................................................====================|=====........................
Environmental Space Missions
- EU Landing Zone 1
1x Design dev working on 2 tasks (123% load) thru 2022-09-14
1x Design dev working on 2 tasks (123% load) thru 2022-09-14
..........................................................======..========|=......=================.....
EVA T2
(Scheduled work ending soon!)
- Actor Feature Team
2x Animation devs working on 19 tasks (30% load) thru 2022-09-28
2x Animation devs working on 19 tasks (30% load) thru 2022-09-28
..~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
- Actor Tech Team
2x Engineering devs working on 15 tasks (68% load) thru 2022-09-22
2x Engineering devs working on 15 tasks (68% load) thru 2022-09-22
............................====================~~~~~~~~~~================|===..........................
FPS Devices T1
(Scheduled work ending soon!)
- Audio
2x Audio devs working on 11 tasks (153% load) thru 2022-09-29
2x Audio devs working on 11 tasks (153% load) thru 2022-09-29
..............................................................============|=====........................
- Weapon Feature Team
2x Engineering devs working on 9 tasks (43% load) thru 2022-09-28
2x Engineering devs working on 9 tasks (43% load) thru 2022-09-28
..............==============............~~~~~~~~~~~~~~~~~~================|=====........................
- Weapon Content Team
2x Art devs will work on 5 tasks (379% load) starting 2022-09-18 thru 2022-09-29
2x Art devs will work on 5 tasks (379% load) starting 2022-09-18 thru 2022-09-29
..........................................................................|.====........................
FPS Radar / Scanning
(Scheduled work ending soon!)
- Audio
1x Audio dev working on 7 tasks (648% load) thru 2022-09-29
1x Audio dev working on 7 tasks (648% load) thru 2022-09-29
..........................................................................|=====........................
- Actor Feature Team
2x Engineering devs will work on 1 task (64% load) starting 2022-09-15 thru 2022-09-28
2x Engineering devs will work on 1 task (64% load) starting 2022-09-15 thru 2022-09-28
..........==================================..........~~~~======..........|=====........................
Frontier Clothing
(Scheduled work ending soon!)
- Character Tech Art
3x Tech Content devs working on 2 tasks (44% load) thru 2022-09-22
3x Tech Content devs working on 2 tasks (44% load) thru 2022-09-22
......................................========............========....====|===..........................
- SC Character Art
14x Art devs working on 20 tasks (29% load) thru 2022-09-22
14x Art devs working on 20 tasks (29% load) thru 2022-09-22
.=================================================....====================|===..........................
Hacking T0
- SQ42 Art
1x Art dev working on 5 tasks (154% load) thru 2022-09-28
1x Art dev working on 5 tasks (154% load) thru 2022-09-28
......................................................................~~~~|~~~~~........................
- Weapon Feature Team
1x Engineering dev will work on 2 tasks (123% load) starting 2022-09-29 thru 2022-10-26
1x Engineering dev will work on 2 tasks (123% load) starting 2022-09-29 thru 2022-10-26
..==============================================~~~~~~~~~~~~..............|...==========................
HEX
- Live Tools Team
5x Engineering devs working on 39 tasks (44% load) thru 2022-12-19
5x Engineering devs working on 39 tasks (44% load) thru 2022-12-19
..=====================...~~~~========================~~~~~~~~~~~~~~~~~~~~|~~~~~~~=====================.
Ladders T1
- Actor Feature Team
3x Animation devs working on 13 tasks (37% load) thru 2022-09-28
3x Animation devs working on 13 tasks (37% load) thru 2022-09-28
............................====================~~~~~~~~~~================|=====..........======........
..............................................................======......|.............................
- UI Tech Team
1x Engineering dev working on 1 task (152% load) thru 2022-09-15
1x Engineering dev working on 1 task (152% load) thru 2022-09-15
............................................................====........==|=............................
Lorville Cityscape
- MTL Sandbox 1
4x Art devs working on 16 tasks (97% load) thru 2022-09-14
↳ will continue 2022-09-29 with 4x devs
4x Art devs working on 16 tasks (97% load) thru 2022-09-14
↳ will continue 2022-09-29 with 4x devs
......................................................====================|=..======================....
Map and Radar System Rework
(Scheduled work ending soon!)
- SQ42 UI Feature Team
3x Engineering devs working on 15 tasks (53% load) thru 2022-09-15
3x Engineering devs working on 15 tasks (53% load) thru 2022-09-15
..............................============================================|=............................
..........................................==============....========......|.............................
- UI Tech Team
2x Engineering devs working on 3 tasks (100% load) thru 2022-09-29
2x Engineering devs working on 3 tasks (100% load) thru 2022-09-29
......========........................======....................====....==|=====........................
MFD Rework
- SQ42 UI Feature Team
1x Design dev working on 3 tasks (128% load) thru 2022-09-29
1x Art dev working on 3 tasks (128% load) thru 2022-09-29
1x Design dev working on 3 tasks (128% load) thru 2022-09-29
1x Art dev working on 3 tasks (128% load) thru 2022-09-29
....................................................................======|=====........................
....................................................................======|=====........................
- Vehicle Feature Team
8x Engineering devs working on 5 tasks (15% load) thru 2022-09-14
↳ will continue 2022-09-29 with 8x devs
8x Engineering devs working on 5 tasks (15% load) thru 2022-09-14
↳ will continue 2022-09-29 with 8x devs
......................................................====================|=..======================....
Miscellaneous Support
- Actor Feature Team
3x Design devs working on 25 tasks (37% load) thru 2022-12-30
4x Animation devs working on 25 tasks (28% load) thru 2022-12-30
2x Engineering devs working on 24 tasks (53% load) thru 2022-12-30
3x Design devs working on 25 tasks (37% load) thru 2022-12-30
4x Animation devs working on 25 tasks (28% load) thru 2022-12-30
2x Engineering devs working on 24 tasks (53% load) thru 2022-12-30
..==============================================~~~~~~~~~~================|=============================
..==============================================~~~~~~~~~~================|=============================
..==============================================~~~~~~~~~~================|=============================
..==========================..............................................|.............................
- Actor Tech Team
5x Engineering devs working on 19 tasks (17% load) thru 2022-09-22
5x Engineering devs working on 19 tasks (17% load) thru 2022-09-22
..~~~~~~~~~~~~~~~~~~~~======~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~================|===..........................
- AI Content Team
2x Tech Content devs working on 7 tasks (41% load) thru 2022-09-29
2x Tech Content devs working on 7 tasks (41% load) thru 2022-09-29
..~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~........~~~~~~~~~~~~~~~~~~|~====........................
..................======....................====..........................|.............................
- AI Tech and Feature Team
1x Tech Content dev working on 5 tasks (124% load) thru 2022-09-15
1x Tech Content dev working on 5 tasks (124% load) thru 2022-09-15
..~~~~~~~~====~~~~~~~~~~....~~~~~~~~============........==================|=............................
- Arena Commander Feature Team
3x Engineering devs working on 19 tasks (39% load) thru 2022-09-29
3x Engineering devs working on 19 tasks (39% load) thru 2022-09-29
........................================================..................|.............................
....====================~~~~==============================================|=====........................
- Gameplay Story
1x Tech Content dev working on 6 tasks (70% load) thru 2022-09-28
1x Tech Content dev working on 6 tasks (70% load) thru 2022-09-28
.=====.===============~~~~~~..====........~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|=====........................
- SQ42 UI Feature Team
1x Art dev working on 2 tasks (133% load) thru 2022-09-29
1x Art dev working on 2 tasks (133% load) thru 2022-09-29
........................................................................==|=====........................
- UI Tech Team
3x Engineering devs working on 1 task (51% load) thru 2022-09-15
3x Engineering devs working on 1 task (51% load) thru 2022-09-15
..............................==========================................==|=............................
- Vehicle Feature Team
13x Engineering devs working on 6 tasks (9% load) thru 2022-09-28
13x Engineering devs working on 6 tasks (9% load) thru 2022-09-28
..............................======================......................|.......................======
..............======================================..====================|=====..................======
- Weapon Feature Team
5x Design devs working on 28 tasks (25% load) thru 2022-12-30
2x Engineering devs will work on 1 task (64% load) starting 2022-09-15 thru 2022-09-28
5x Design devs working on 28 tasks (25% load) thru 2022-12-30
2x Engineering devs will work on 1 task (64% load) starting 2022-09-15 thru 2022-09-28
..==============================================~~~~~~~~~~================|=============================
..........................................................................|=====..................======
- Systemic Services and Tools Team
4x Engineering devs will work on 5 tasks (32% load) starting 2022-09-29 thru 2022-12-03
4x Engineering devs will work on 5 tasks (32% load) starting 2022-09-29 thru 2022-12-03
..........................................................................|...======================....
mobiGlas Rework
(Scheduled work ending soon!)
- SQ42 Feature Team
1x Engineering dev working on 9 tasks (181% load) thru 2022-09-28
1x Engineering dev working on 9 tasks (181% load) thru 2022-09-28
......................................................====================|=====........................
- SQ42 UI Feature Team
1x Art dev working on 3 tasks (200% load) thru 2022-09-15
1x Art dev working on 3 tasks (200% load) thru 2022-09-15
..........................................==================..............|.............................
....................................................................======|=............................
New Missions - Orison
- Mission Feature Team
2x Engineering devs working on 1 task (64% load) thru 2022-09-22
2x Design devs working on 10 tasks (54% load) thru 2022-11-17
2x Engineering devs working on 1 task (64% load) thru 2022-09-22
2x Design devs working on 10 tasks (54% load) thru 2022-11-17
....................................................~~~~~~~~~~..........==|===..........................
....................................................========~~~~~~~~~~~~~~|~==================..........
New Player Experience
- Character Tech Art
1x Tech Content dev working on 2 tasks (133% load) thru 2022-09-22
1x Tech Content dev working on 2 tasks (133% load) thru 2022-09-22
......................................................====............====|===..........................
- EU Landing Zone 1
1x Art dev working on 1 task (128% load) thru 2022-09-14
1x Art dev working on 1 task (128% load) thru 2022-09-14
......................................................==========......====|=............................
- Narrative
1x Design dev working on 5 tasks (124% load) thru 2022-09-15
1x Design dev working on 5 tasks (124% load) thru 2022-09-15
........................................................==================|=............................
- US PU Gameplay Feature Team
1x Engineering dev will work on 4 tasks (126% load) starting 2022-09-25 thru 2022-11-17
1x Art dev will work on 4 tasks (126% load) starting 2022-09-25 thru 2022-11-17
1x Engineering dev will work on 4 tasks (126% load) starting 2022-09-25 thru 2022-11-17
1x Art dev will work on 4 tasks (126% load) starting 2022-09-25 thru 2022-11-17
..........................................................................|...================..........
..........................................................................|...================..........
Persistent Streaming and Server Meshing
- Actor Tech Team
2x Engineering devs working on 6 tasks (57% load) thru 2022-09-22
2x Engineering devs working on 6 tasks (57% load) thru 2022-09-22
..==========================..........................====================|===..........................
- Game Services Team
10x Engineering devs working on 19 tasks (19% load) thru 2022-12-19
10x Engineering devs working on 19 tasks (19% load) thru 2022-12-19
..====================~~~~~~~~============================================|============================.
- Network Team
9x Engineering devs working on 12 tasks (13% load) thru 2022-12-30
9x Engineering devs working on 12 tasks (13% load) thru 2022-12-30
..=====.......============....................============================|=============================
- Persistent Tech Team
4x Engineering devs working on 14 tasks (33% load) thru 2022-12-30
4x Engineering devs working on 14 tasks (33% load) thru 2022-12-30
..====================~~~~~~~~============================================|=============================
- Vehicle Feature Team
5x Engineering devs working on 12 tasks (26% load) thru 2022-12-08
5x Engineering devs working on 12 tasks (26% load) thru 2022-12-08
......................................==============..====================|=========================....
- Mission Feature Team
3x Engineering devs will work on 6 tasks (37% load) starting 2022-09-23 thru 2022-12-22
3x Engineering devs will work on 6 tasks (37% load) starting 2022-09-23 thru 2022-12-22
.~========================~~~~~~~~~~~~~~~~~~~~~~~~........................|.============================
Player Interaction Experience T0 - Hints & Interactions
- Actor Feature Team
2x Engineering devs working on 8 tasks (48% load) thru 2022-09-28
2x Animation devs will work on 2 tasks (62% load) starting 2022-09-15 thru 2022-10-12
2x Engineering devs working on 8 tasks (48% load) thru 2022-09-28
2x Animation devs will work on 2 tasks (62% load) starting 2022-09-15 thru 2022-10-12
............................................====~~~~~~~~~~================|=====........................
..........................................................................|=========....................
Player Interaction Experience T1 - Lockers & Inventory
- Actor Feature Team
1x Engineering dev working on 9 tasks (113% load) thru 2022-11-09
1x Design dev working on 12 tasks (56% load) thru 2022-09-28
1x Engineering dev working on 9 tasks (113% load) thru 2022-11-09
1x Design dev working on 12 tasks (56% load) thru 2022-09-28
......................................................==============......|.............................
......................................................====================|=================............
............................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
Player Interaction Experience T2 - Visor HUD & Helmet
- Actor Feature Team
1x Design dev working on 12 tasks (56% load) thru 2022-09-28
1x Engineering dev will work on 6 tasks (109% load) starting 2022-09-29 thru 2022-12-30
1x Design dev working on 12 tasks (56% load) thru 2022-09-28
1x Engineering dev will work on 6 tasks (109% load) starting 2022-09-29 thru 2022-12-30
............................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
..........................................................................|...==========================
..............==============..............................................|.............................
Quantum Simulation
- Systemic Services and Tools Team
5x Engineering devs working on 15 tasks (31% load) thru 2022-12-15
5x Engineering devs working on 15 tasks (31% load) thru 2022-12-15
.=================================================....====================|===========================..
Quantum Travel Experience
- Vehicle Feature Team
3x Engineering devs working on 7 tasks (56% load) thru 2022-09-14
↳ will continue 2022-09-29 with 3x devs
3x Engineering devs working on 7 tasks (56% load) thru 2022-09-14
↳ will continue 2022-09-29 with 3x devs
......................................==============..====================|=..======================....
Replication Layer Entity Authority
(Scheduled work ending soon!)
- Network Team
6x Engineering devs working on 9 tasks (36% load) thru 2022-09-14
6x Engineering devs working on 9 tasks (36% load) thru 2022-09-14
..=========...=====.......====================........====================|=............................
Rescue/Transport Mission
(Scheduled work ending soon!)
- Facial Animation
3x Animation devs working on 9 tasks (72% load) thru 2022-09-22
3x Animation devs working on 9 tasks (72% load) thru 2022-09-22
........................................................==================|===..........................
Resource Management
- EU PU Gameplay Feature Team
2x Engineering devs working on 10 tasks (60% load) thru 2022-11-22
2x Design devs will work on 5 tasks (31% load) starting 2022-09-15 thru 2022-11-22
2x Engineering devs working on 10 tasks (60% load) thru 2022-11-22
2x Design devs will work on 5 tasks (31% load) starting 2022-09-15 thru 2022-11-22
..........................~~~~~~~~~~~~~~~~~...~~~~~...~~~~~~~~~~~~~~~~~~..|~~~~~~~~~~~~~~~~~~~~...~~~~~.
..........~~~~~~~~~.......=========================...====================|====================...=====.
- Vehicle Feature Team
2x Design devs working on 5 tasks (60% load) thru 2022-10-27
4x Engineering devs working on 5 tasks (30% load) thru 2022-09-14
↳ will continue 2022-09-29 with 4x devs
2x Design devs working on 5 tasks (60% load) thru 2022-10-27
4x Engineering devs working on 5 tasks (30% load) thru 2022-09-14
↳ will continue 2022-09-29 with 4x devs
......................................==============..............========|=============................
......................................==============..====================|=..==============............
Salvage T0
- Vehicle Content - EU
6x Art devs working on 6 tasks (52% load) thru 2022-09-22
6x Art devs working on 6 tasks (52% load) thru 2022-09-22
........====..................==========............................======|===..============............
........======..............====..........................................|.............................
- EU PU Gameplay Feature Team
1x Engineering dev will work on 2 tasks (128% load) starting 2022-09-15 thru 2022-10-11
1x Engineering dev will work on 2 tasks (128% load) starting 2022-09-15 thru 2022-10-11
..........................=================...=====...==================..|========.....................
Sandbox Prison Activities
(Scheduled work ending soon!)
- Mission Feature Team
2x Design devs working on 7 tasks (50% load) thru 2022-09-22
2x Design devs working on 7 tasks (50% load) thru 2022-09-22
....................................................~~~~~~~~~~~~~~~~~~~~~~|~~~..........................
............................................................~~~~~~~~======|.............................
Save/Load
(Scheduled work ending soon!)
- SQ42 Feature Team
2x Engineering devs working on 7 tasks (106% load) thru 2022-09-28
2x Engineering devs working on 7 tasks (106% load) thru 2022-09-28
..............................................................============|=====........................
Security Post Kareah Reactivation
(Scheduled work ending soon!)
- Mission Feature Team
1x Engineering dev working on 2 tasks (62% load) thru 2022-09-22
2x Design devs working on 7 tasks (60% load) thru 2022-09-22
1x Engineering dev working on 2 tasks (62% load) thru 2022-09-22
2x Design devs working on 7 tasks (60% load) thru 2022-09-22
....................................................................~~~~~~|~~~..........................
....................................................====~~~~==============|===..........................
SQ42 - Vehicle Support
- Weapon Content Team
2x Art devs working on 3 tasks (227% load) thru 2022-09-15
2x Art devs working on 3 tasks (227% load) thru 2022-09-15
........................................................................==|=............................
- Vehicle Feature Team
9x Engineering devs will work on 7 tasks (19% load) starting 2022-09-29 thru 2022-12-08
9x Engineering devs will work on 7 tasks (19% load) starting 2022-09-29 thru 2022-12-08
..........................======......======..............................|...======================....
Stanton Fashion Clothing
(Scheduled work ending soon!)
- Character Tech Art
1x Tech Content dev working on 1 task (152% load) thru 2022-09-22
1x Tech Content dev working on 1 task (152% load) thru 2022-09-22
..........................................................................|===..........................
Subsumption Editor Integration
(Scheduled work ending soon!)
- AI Tech and Feature Team
1x Engineering dev working on 6 tasks (149% load) thru 2022-09-15
1x Engineering dev working on 6 tasks (149% load) thru 2022-09-15
..======================....====================........==================|=............................
Unannounced Vehicle
- Audio
2x Audio devs working on 4 tasks (133% load) thru 2022-09-29
2x Audio devs working on 4 tasks (133% load) thru 2022-09-29
........................................................................==|=====........................
- Vehicle Content - EU
5x Art devs working on 30 tasks (50% load) thru 2022-10-20
1x Design dev working on 11 tasks (248% load) thru 2022-09-15
5x Art devs working on 30 tasks (50% load) thru 2022-10-20
1x Design dev working on 11 tasks (248% load) thru 2022-09-15
............................==============================================|===========..................
............................~~~~~~~~~~~~~~~~~~~~~~....====================|=....========................
- Vehicle Content - US
3x Tech Content devs will work on 3 tasks (64% load) starting 2022-09-15 thru 2022-09-28
3x Tech Content devs will work on 3 tasks (64% load) starting 2022-09-15 thru 2022-09-28
..........................................................................|~~~~~........................
Unannounced Vehicle
(Scheduled work ending soon!)
- Vehicle Content - EU
1x Design dev working on 13 tasks (246% load) thru 2022-09-29
1x Design dev working on 13 tasks (246% load) thru 2022-09-29
....==============================================================........|.............................
............~~~~~~~~~~~~~~~~======================....====================|=====........................
Unannounced Vehicle
- Audio
2x Audio devs working on 3 tasks (227% load) thru 2022-09-15
2x Audio devs working on 3 tasks (227% load) thru 2022-09-15
................................................................====....==|=............................
- Vehicle Content - EU
3x Art devs working on 12 tasks (82% load) thru 2022-09-22
3x Design devs working on 18 tasks (77% load) thru 2022-10-27
3x Art devs working on 12 tasks (82% load) thru 2022-09-22
3x Design devs working on 18 tasks (77% load) thru 2022-10-27
..............============............................====================|===..........................
..............========..........................~~....==~~~~~~~~~~~~~~~~~~|~============................
VOLT Fresnel
(Scheduled work ending soon!)
- Weapon Content Team
1x Art dev working on 6 tasks (313% load) thru 2022-09-29
1x Art dev working on 6 tasks (313% load) thru 2022-09-29
......................................................~~..............====|=====........................
VOLT Parallax
(Scheduled work ending soon!)
- Weapon Content Team
2x Art devs working on 6 tasks (156% load) thru 2022-09-29
2x Art devs working on 6 tasks (156% load) thru 2022-09-29
......................................................................====|=====........................
XenoThreat Armor
(Scheduled work ending soon!)
- SC Character Art
4x Art devs working on 10 tasks (51% load) thru 2022-09-22
4x Art devs working on 10 tasks (51% load) thru 2022-09-22
..============....========............................====================|===..........................
Zero G Push & Pull
(Scheduled work ending soon!)
- Actor Feature Team
2x Animation devs working on 18 tasks (28% load) thru 2022-09-28
2x Animation devs working on 18 tasks (28% load) thru 2022-09-28
..~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................
- Actor Tech Team
1x Engineering dev working on 10 tasks (154% load) thru 2022-09-22
1x Engineering dev working on 10 tasks (154% load) thru 2022-09-22
......................................................~~~~================|===..........................
The following deliverables are scheduled to begin (or continue) work within two weeks
AI - Commuter
(Scheduled work ending soon!)
- AI Content Team
1x Animation dev will work on 5 tasks (758% load) starting 2022-09-18 thru 2022-09-29
1x Animation dev will work on 5 tasks (758% load) starting 2022-09-18 thru 2022-09-29
........................................................====..............|.====........................
Artificial Gravity
(Starting soon!)
- EU PU Gameplay Feature Team
1x Engineering dev will work on 4 tasks (62% load) starting 2022-09-29 thru 2022-11-22
1x Design dev will work on 4 tasks (123% load) starting 2022-09-29 thru 2022-11-22
1x Engineering dev will work on 4 tasks (62% load) starting 2022-09-29 thru 2022-11-22
1x Design dev will work on 4 tasks (123% load) starting 2022-09-29 thru 2022-11-22
..........................................................................|...~~~~~~~~~~~~~~~~~...~~~~~.
..........................................................................|...=================...=====.
Cave Archetypes
- EU Sandbox 2
5x Art devs will work on 5 tasks (128% load) starting 2022-09-21 thru 2022-10-04
1x Tech Content dev will work on 1 task (128% load) starting 2022-09-21 thru 2022-10-04
5x Art devs will work on 5 tasks (128% load) starting 2022-09-21 thru 2022-10-04
1x Tech Content dev will work on 1 task (128% load) starting 2022-09-21 thru 2022-10-04
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~......................=====.................|.=====.......................
....................................................=====.................|.=====.......................
Cutting T2
(Starting soon!)
- Weapon Feature Team
1x Engineering dev will work on 6 tasks (109% load) starting 2022-09-29 thru 2022-12-30
1x Engineering dev will work on 6 tasks (109% load) starting 2022-09-29 thru 2022-12-30
..........................................................................|...==========================
Freight Elevators
(Starting soon!)
- US PU Gameplay Feature Team
2x Engineering devs will work on 5 tasks (47% load) starting 2022-09-25 thru 2022-11-17
2x Design devs will work on 4 tasks (63% load) starting 2022-09-25 thru 2022-11-17
2x Engineering devs will work on 5 tasks (47% load) starting 2022-09-25 thru 2022-11-17
2x Design devs will work on 4 tasks (63% load) starting 2022-09-25 thru 2022-11-17
..........................................................................|...~~~~~~~~~~~~~~~~..........
..........................................................................|...================..........
Jump Points
- EU Sandbox 1
1x Art dev will work on 2 tasks (123% load) starting 2022-09-21 thru 2022-10-18
1x Art dev will work on 2 tasks (123% load) starting 2022-09-21 thru 2022-10-18
..............~~~~~...................====....=======.....................|.=========...................
Life Support T0
- EU PU Gameplay Feature Team
1x Design dev will work on 5 tasks (61% load) starting 2022-09-15 thru 2022-11-22
1x Engineering dev will work on 5 tasks (74% load) starting 2022-09-15 thru 2022-11-22
1x Design dev will work on 5 tasks (61% load) starting 2022-09-15 thru 2022-11-22
1x Engineering dev will work on 5 tasks (74% load) starting 2022-09-15 thru 2022-11-22
..~~~~~~~~~~~~~~~~~...~~~~~~~~~~~~~~~~~~~~~...~~~~~...~~~~~~~~~~~~~~~~~~..|~~~~~~~~~~~~~~~~~~~~...~~~~~.
..=================...=================...............==================..|~~~~~~~~~~~~~~~~~~~~...~~~~~.
MISC Hull C
- Vehicle Content - EU
6x Art devs will work on 1 task (69% load) starting 2022-09-25 thru 2022-09-29
6x Art devs will work on 1 task (69% load) starting 2022-09-25 thru 2022-09-29
..........................................................================|...==........................
New Interdiction Scenarios
- EU Sandbox 1
1x Design dev will work on 2 tasks (123% load) starting 2022-09-21 thru 2022-10-18
1x Design dev will work on 2 tasks (123% load) starting 2022-09-21 thru 2022-10-18
....................................................=================.....|.=========...................
Outpost Homestead - Independent & Outlaw
- EU Sandbox 1
12x Art devs will work on 8 tasks (20% load) starting 2022-09-21 thru 2022-11-15
12x Art devs will work on 8 tasks (20% load) starting 2022-09-21 thru 2022-11-15
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========....===========================.|.=================...=======.
Outpost Theme Variants
- EU Sandbox 1
4x Design devs will work on 5 tasks (38% load) starting 2022-09-21 thru 2022-11-15
4x Design devs will work on 5 tasks (38% load) starting 2022-09-21 thru 2022-11-15
.~~~~~~~~~~~~~~.~~~~~~~~~~~~~~~~~~========....=======.....................|.=================...=======.
Prone T1
(Starting soon!)
- Actor Feature Team
1x Animation dev will work on 6 tasks (109% load) starting 2022-09-29 thru 2022-12-30
1x Engineering dev will work on 6 tasks (109% load) starting 2022-09-29 thru 2022-12-30
1x Animation dev will work on 6 tasks (109% load) starting 2022-09-29 thru 2022-12-30
1x Engineering dev will work on 6 tasks (109% load) starting 2022-09-29 thru 2022-12-30
..........................................................................|...==========================
..........................................................................|...==========================
Pyro Space Stations
- EU Landing Zone 1
14x Art devs will work on 24 tasks (220% load) starting 2022-09-15 thru 2022-09-28
3x Design devs will work on 6 tasks (256% load) starting 2022-09-15 thru 2022-09-28
14x Art devs will work on 24 tasks (220% load) starting 2022-09-15 thru 2022-09-28
3x Design devs will work on 6 tasks (256% load) starting 2022-09-15 thru 2022-09-28
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========....==========================..|=====..=================.....
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========....==========================..|=====......=============.....
Pyro System, Planet, and Mission Setup
- US PU Gameplay Feature Team
1x Design dev will work on 4 tasks (126% load) starting 2022-09-25 thru 2022-11-17
1x Design dev will work on 4 tasks (126% load) starting 2022-09-25 thru 2022-11-17
......................................========........================....|...================..........
Satellites - Points of Interest
- Location Concept Art
2x Art devs will work on 21 tasks (190% load) starting 2022-09-29 thru 2022-12-30
2x Art devs will work on 21 tasks (190% load) starting 2022-09-29 thru 2022-12-30
......................................================....................|...==========================
Security Behavior
(Scheduled work ending soon!)
- AI Content Team
1x Animation dev will work on 5 tasks (758% load) starting 2022-09-18 thru 2022-09-29
1x Animation dev will work on 5 tasks (758% load) starting 2022-09-18 thru 2022-09-29
..==========................========......................................|.====........................
StarWords Improvements
(Scheduled work ending soon!)
- Tools Team
2x Engineering devs will work on 10 tasks (641% load) starting 2022-09-14 thru 2022-09-27
2x Engineering devs will work on 10 tasks (641% load) starting 2022-09-14 thru 2022-09-27
..=========...=========...=========...========~~~~~~~~~~~~~...=========...|====.........................
Underground Facilities
- EU Sandbox 2
3x Design devs will work on 3 tasks (128% load) starting 2022-09-21 thru 2022-10-04
4x Art devs will work on 1 task (32% load) starting 2022-09-21 thru 2022-10-04
3x Design devs will work on 3 tasks (128% load) starting 2022-09-21 thru 2022-10-04
4x Art devs will work on 1 task (32% load) starting 2022-09-21 thru 2022-10-04
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~......................=====.................|.=====.......................
.=============================......................=====.................|.=====.......................
Virtual AI Service
- Systemic Services and Tools Team
2x Engineering devs will work on 3 tasks (68% load) starting 2022-09-29 thru 2022-11-05
2x Engineering devs will work on 3 tasks (68% load) starting 2022-09-29 thru 2022-11-05
..................=====...............................==================..|...==============............