Scheduled Deliverables
as of 2022-08-03
There are currently 92 scheduled deliverables being worked on by 41 teams
15 deliverables are scheduled to begin work by 14 team(s) within two weeks
This report lists the actively assigned deliverables and the associated teams, along with the number of developers assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.
The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.
The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.
extra analysis (click me)
There are approximately 436 devs (out of ~512, or 85%) with 926 assignments scheduled to work on 92 observable deliverables. Of those deliverables, 22% are for SQ42 exclusively, with ~218 devs (43%) scheduled for approximately 4383 man-days. 29% of deliverables are shared between both projects.
9 deliverable(s) are not currently scheduled to continue work after this sprint:
- AI - Off Duty Activities - Sleeping
- Chapter 09
- Cooperative Locomotion
- Doors/Airlocks/Light Panels UI
- Flak Ammunition
- Ladders T1
- Shopkeeper Outfits
- Unannounced Vehicle
- Visor/Lens Rework
- Actor Feature Team
44% part-time with 205 task(s) scheduled, 48% of which are for SQ42 - Actor Tech Team
44% part-time with 52 task(s) scheduled, 43% of which are for SQ42 - AI Content Team
41% part-time with 44 task(s) scheduled, 64% of which are for SQ42 - Audio
25% part-time with 60 task(s) scheduled, 40% of which are for SQ42 - Character Tech Art
full-time with 22 task(s) scheduled, 40% of which are for SQ42 - Cinematics Team
90% part-time with 192 task(s) scheduled, all of which are for SQ42 - Editor Team
10% part-time with 20 task(s) scheduled, 50% of which are for SQ42 - Engine Team
40% part-time with 25 task(s) scheduled, 50% of which are for SQ42 - EU Landing Zone Team
full-time with 44 task(s) scheduled, all of which are for SC - EU PU Gameplay Feature Team
33% part-time with 36 task(s) scheduled, 17% of which are for SQ42 - EU Sandbox 1
full-time with 41 task(s) scheduled, all of which are for SC - Facial Animation
6% part-time with 31 task(s) scheduled, 50% of which are for SQ42 - Game Services Team
full-time with 35 task(s) scheduled, all of which are for SC - Gameplay Story
99% part-time with 71 task(s) scheduled, 89% of which are for SQ42 - Graphics Team
11% part-time with 47 task(s) scheduled, 50% of which are for SQ42 - Live Tools Team
57% part-time with 46 task(s) scheduled, 33% of which are for SQ42 - Location Concept Art
full-time with 31 task(s) scheduled, all of which are for SC - Mission Feature Team
52% part-time with 52 task(s) scheduled, 11% of which are for SQ42 - Motion Capture Team
6% part-time with 18 task(s) scheduled, 50% of which are for SQ42 - MTL Sandbox 1
full-time with 69 task(s) scheduled, all of which are for SC - Narrative
16% part-time with 19 task(s) scheduled, 25% of which are for SQ42 - Network Team
full-time with 43 task(s) scheduled, all of which are for SC - Persistent Tech Team
full-time with 20 task(s) scheduled, all of which are for SC - Physics Team
full-time with 10 task(s) scheduled, 50% of which are for SQ42 - SC Character Art
full-time with 32 task(s) scheduled, 20% of which are for SQ42 - SQ42 Art
full-time with 80 task(s) scheduled, all of which are for SQ42 - SQ42 Character Art
full-time with 28 task(s) scheduled, all of which are for SQ42 - SQ42 Feature Team
full-time with 10 task(s) scheduled, 50% of which are for SQ42 - SQ42 Level Design 1 - FPS
full-time with 26 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 2 - Flight
full-time with 27 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 3 - Social
5% part-time with 19 task(s) scheduled, all of which are for SQ42 - SQ42 UI Feature Team
full-time with 27 task(s) scheduled, 50% of which are for SQ42 - Systemic Services and Tools Team
full-time with 34 task(s) scheduled, all of which are for SC - Tech Animation Team
69% part-time with 13 task(s) scheduled, all of which are for SQ42 - Tools Team
10% part-time with 42 task(s) scheduled, 50% of which are for SQ42 - UI Tech Team
full-time with 13 task(s) scheduled, 50% of which are for SQ42 - US PU Gameplay Feature Team
28% part-time with 36 task(s) scheduled, all of which are for SC - Vehicle Concept Art
full-time with 23 task(s) scheduled, all of which are for SC - Vehicle Content - EU
19% part-time with 146 task(s) scheduled, all of which are for SC - Vehicle Content - US
33% part-time with 66 task(s) scheduled, 29% of which are for SQ42 - Vehicle Feature Team
full-time with 59 task(s) scheduled, 30% of which are for SQ42 - VFX Team
25% part-time with 32 task(s) scheduled, 40% of which are for SQ42 - Weapon Content Team
full-time with 19 task(s) scheduled, all of which are for SQ42 - Weapon Feature Team
20% part-time with 54 task(s) scheduled, 40% of which are for SQ42
AI - Commuter
- AI Content Team
1x Design dev working on 5 tasks (214% load) thru 2022-08-18
1x Design dev working on 5 tasks (214% load) thru 2022-08-18
........................................................======|=====....................................
........................................................====..|.............====........................
AI - Medical
- AI Content Team
1x Animation dev working on 3 tasks (200% load) thru 2022-08-18
2x Design devs working on 4 tasks (85% load) thru 2022-08-18
1x Animation dev working on 3 tasks (200% load) thru 2022-08-18
2x Design devs working on 4 tasks (85% load) thru 2022-08-18
............................................................==|=====....................................
........................................................======|=====....................................
- Facial Animation
2x Animation devs working on 4 tasks (81% load) thru 2022-08-25
2x Animation devs working on 4 tasks (81% load) thru 2022-08-25
........................................................======|=======..................................
AI - Off Duty Activities - Sleeping
(Scheduled work ending soon!)
- AI Content Team
2x Animation devs working on 4 tasks (133% load) thru 2022-08-04
2x Animation devs working on 4 tasks (133% load) thru 2022-08-04
........................................................======|=........................................
AR and Map Marker System Rework
- Graphics Team
1x Engineering dev working on 4 tasks (163% load) thru 2022-08-10
1x Engineering dev working on 4 tasks (163% load) thru 2022-08-10
....................................................==========|===......................................
- UI Tech Team
2x Engineering devs working on 5 tasks (107% load) thru 2022-09-01
2x Engineering devs working on 5 tasks (107% load) thru 2022-09-01
..................................==================........==|=========................................
Argo SRV
- Vehicle Content - EU
4x Art devs working on 31 tasks (69% load) thru 2022-10-20
1x Design dev working on 15 tasks (338% load) thru 2022-09-15
4x Art devs working on 31 tasks (69% load) thru 2022-10-20
1x Design dev working on 15 tasks (338% load) thru 2022-09-15
................................==============================|=======================..................
................................~~~~~~~~~~~~~~~~~~....========|=============....~~~~~~~~~~~~~~~~~~~~~~..
Asteroid Facilities
- EU Sandbox 1
1x Art dev working on 7 tasks (167% load) thru 2022-09-06
1x Art dev working on 7 tasks (167% load) thru 2022-09-06
....................................................==========|==========...........=========...=======.
Atlas
- Network Team
5x Engineering devs working on 6 tasks (36% load) thru 2022-08-31
5x Engineering devs working on 6 tasks (36% load) thru 2022-08-31
......=============.......============................========|=========................................
Banu Merchantman
- Vehicle Content - EU
12x Art devs working on 25 tasks (47% load) thru 2022-09-15
3x Design devs working on 15 tasks (56% load) thru 2022-09-15
12x Art devs working on 25 tasks (47% load) thru 2022-09-15
3x Design devs working on 15 tasks (56% load) thru 2022-09-15
..================================================....========|=============....======================..
..============~~~~~~~~==~~................======~~....~~~~~~~~|~~~~~~~~~~~~~....======================..
- VFX Team
2x Art devs working on 4 tasks (123% load) thru 2022-08-07
2x Art devs working on 4 tasks (123% load) thru 2022-08-07
........................................~~~~~...........======|==.......................................
- Vehicle Content - US
3x Tech Content devs will work on 16 tasks (165% load) starting 2022-08-18 thru 2022-09-14
3x Tech Content devs will work on 16 tasks (165% load) starting 2022-08-18 thru 2022-09-14
..............................................................|...~~~~~~~~~~............................
Bounty Hunter V2
- Mission Feature Team
2x Design devs working on 6 tasks (40% load) thru 2022-09-22
2x Design devs working on 6 tasks (40% load) thru 2022-09-22
....................................................~~~~~~~~~~|~~~~~~~~~~~~~~~..........................
- US PU Gameplay Feature Team
1x Design dev working on 7 tasks (220% load) thru 2022-08-25
1x Design dev working on 7 tasks (220% load) thru 2022-08-25
......................................................========|=======........~~~~~~~~~~~~~~~~..........
......=========...=====...~~~~................................|...............================..........
Bug Fixing & Tech Debt
- AI Content Team
4x Animation devs working on 2 tasks (76% load) thru 2022-08-04
4x Animation devs working on 2 tasks (76% load) thru 2022-08-04
......======..======............====....====..................|.........................................
..............======....................====................==|=....====................................
- Live Tools Team
4x Engineering devs working on 15 tasks (38% load) thru 2022-12-19
4x Engineering devs working on 15 tasks (38% load) thru 2022-12-19
..........................====================================|========================================.
- Mission Feature Team
3x Engineering devs working on 4 tasks (40% load) thru 2022-09-22
3x Engineering devs working on 4 tasks (40% load) thru 2022-09-22
............................................................==|===============..........................
..............................................................|.............============================
- SC Character Art
7x Art devs working on 5 tasks (48% load) thru 2022-08-25
7x Art devs working on 5 tasks (48% load) thru 2022-08-25
..............................................................|=======....====..........................
- UI Tech Team
4x Engineering devs working on 5 tasks (39% load) thru 2022-08-04
4x Engineering devs working on 5 tasks (39% load) thru 2022-08-04
..====........................====..............==============|=............====........................
- Vehicle Content - US
3x Art devs working on 6 tasks (49% load) thru 2022-09-28
3x Art devs working on 6 tasks (49% load) thru 2022-09-28
....................====......................................|...........======....................====
..........................................................====|=================........................
- Vehicle Feature Team
12x Engineering devs working on 12 tasks (41% load) thru 2022-08-17
12x Engineering devs working on 12 tasks (41% load) thru 2022-08-17
..=================.......==========================..========|=====..........======....................
..........................======......................======..|...............======....................
- Character Tech Art
7x Tech Content devs will work on 2 tasks (43% load) starting 2022-08-14 thru 2022-08-25
7x Tech Content devs will work on 2 tasks (43% load) starting 2022-08-14 thru 2022-08-25
..============........................============........====|...====....====..........................
- Editor Team
5x Engineering devs will work on 8 tasks (205% load) starting 2022-08-03 thru 2022-08-16
5x Engineering devs will work on 8 tasks (205% load) starting 2022-08-03 thru 2022-08-16
..........=====.......=================.......................|====.......=====.........................
Building Interiors
- Location Concept Art
7x Art devs working on 31 tasks (42% load) thru 2022-12-30
7x Art devs working on 31 tasks (42% load) thru 2022-12-30
......................................========================|=========================================
- MTL Sandbox 1
14x Art devs working on 28 tasks (48% load) thru 2022-09-14
4x Design devs working on 12 tasks (72% load) thru 2022-09-14
14x Art devs working on 28 tasks (48% load) thru 2022-09-14
4x Design devs working on 12 tasks (72% load) thru 2022-09-14
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~============........========|=============..======================....
..~~~~~~~~~~~~~~~~~~~~~...............................========|=============..======================....
Cargo System Refactor
- US PU Gameplay Feature Team
3x Engineering devs working on 5 tasks (31% load) thru 2022-08-25
3x Engineering devs working on 5 tasks (31% load) thru 2022-08-25
..~~~~~~~~========~~~~~~~~~~~~================........~~~~~~~~|~~~~~~~..................................
..........................~~~~~~~~~~~~~~~~~~~~................|.........................................
Cave Archetypes
- Audio
1x Audio dev working on 5 tasks (463% load) thru 2022-08-04
1x Audio dev working on 5 tasks (463% load) thru 2022-08-04
..........................................................====|=........................................
- VFX Team
1x Art dev working on 3 tasks (385% load) thru 2022-08-07
1x Art dev working on 3 tasks (385% load) thru 2022-08-07
............................................................==|==.......................................
Chapter 01
- Cinematics Team
2x Design devs working on 21 tasks (21% load) thru 2022-09-29
3x Animation devs working on 29 tasks (19% load) thru 2022-09-29
2x Design devs working on 21 tasks (21% load) thru 2022-09-29
3x Animation devs working on 29 tasks (19% load) thru 2022-09-29
.~~~~~~~~~~~~~~~~~~~~~~~~~======~~~~~~~~~~~~~~~~~~~~======~~~~|~~~~~~~~~~~~~~~~~........................
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
- SQ42 Level Design 2 - Flight
5x Design devs working on 9 tasks (36% load) thru 2022-09-28
5x Design devs working on 9 tasks (36% load) thru 2022-09-28
.~====================~~~~~~~~======================..========|=================........................
- SQ42 Art
9x Art devs will work on 4 tasks (18% load) starting 2022-08-18 thru 2022-09-28
9x Art devs will work on 4 tasks (18% load) starting 2022-08-18 thru 2022-09-28
..............................................................|...==============........................
- SQ42 Level Design 3 - Social
3x Design devs will work on 2 tasks (85% load) starting 2022-08-04 thru 2022-08-17
3x Design devs will work on 2 tasks (85% load) starting 2022-08-04 thru 2022-08-17
..~~~~~~~~~~~~~~~~======..====....====....==================..|=====..==========........................
Chapter 02
- Cinematics Team
2x Animation devs working on 4 tasks (24% load) thru 2022-09-08
1x Design dev will work on 3 tasks (56% load) starting 2022-08-15 thru 2022-09-29
2x Animation devs working on 4 tasks (24% load) thru 2022-09-08
1x Design dev will work on 3 tasks (56% load) starting 2022-08-15 thru 2022-09-29
........................................~~~~~~~~~~~~~~........|...~~~~~~~~~~~~~~........................
..........................~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~|~~~~~~~~~~~..............................
- SQ42 Art
2x Art devs working on 7 tasks (70% load) thru 2022-09-28
2x Art devs working on 7 tasks (70% load) thru 2022-09-28
......................................................========|=================........................
Chapter 04
- AI Content Team
1x Design dev working on 4 tasks (85% load) thru 2022-08-18
1x Design dev working on 4 tasks (85% load) thru 2022-08-18
........................................................~~~~~~|~~~~~....................................
- Cinematics Team
3x Animation devs working on 3 tasks (19% load) thru 2022-08-14
3x Animation devs working on 3 tasks (19% load) thru 2022-08-14
.~~~~~~~~~~~~~~~~~~~~~~~~~~...................................|.........................................
..........................~~~~~~~~~~~~~~~~..........~~~~~~~~~~|~~~~.....................................
- Gameplay Story
5x Animation devs working on 11 tasks (22% load) thru 2022-09-28
5x Animation devs working on 11 tasks (22% load) thru 2022-09-28
.......~~~~...........................~~~~....~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
......................................~~~~....................|.........................................
- SQ42 Art
1x Art dev will work on 4 tasks (163% load) starting 2022-08-18 thru 2022-09-28
1x Art dev will work on 4 tasks (163% load) starting 2022-08-18 thru 2022-09-28
..............................................................|...==============........................
Chapter 06
- Gameplay Story
5x Animation devs working on 14 tasks (28% load) thru 2022-09-28
5x Animation devs working on 14 tasks (28% load) thru 2022-09-28
.~~~~~.~~~~~~~~.......~~~~~~..~~~~~~~~~~~~............~~~~~~~~|~~~~~~~~~~~~~~~~~........................
..................................~~~~~~~~....................|.........................................
- SQ42 Level Design 3 - Social
2x Design devs working on 7 tasks (70% load) thru 2022-09-28
2x Design devs working on 7 tasks (70% load) thru 2022-09-28
..====~~~~~~~~~~~~======..====================================|=================........................
Chapter 09
(Scheduled work ending soon!)
- Cinematics Team
2x Design devs working on 2 tasks (35% load) thru 2022-08-14
2x Design devs working on 2 tasks (35% load) thru 2022-08-14
.~~~~~~~~~~~~~~~~~~~~~~~~~~.....~~~~~~~~~~................~~~~|~~~~.....................................
Chapter 10
- Gameplay Story
5x Animation devs working on 8 tasks (16% load) thru 2022-09-28
5x Animation devs working on 8 tasks (16% load) thru 2022-09-28
.......~~~~~~~~.......~~~~~~~~~~~~~~~~~~~~............~~~~~~~~|~~~~~~~~~~~~~~~~~........................
..........................~~~~....~~~~~~~~....................|.........................................
- SQ42 Level Design 3 - Social
1x Design dev working on 7 tasks (131% load) thru 2022-09-28
1x Design dev working on 7 tasks (131% load) thru 2022-09-28
..~~~~~~..................========~~~~========================|~~~==============........................
Chapter 11
- Cinematics Team
3x Design devs working on 4 tasks (16% load) thru 2022-09-29
2x Animation devs working on 4 tasks (25% load) thru 2022-08-14
3x Design devs working on 4 tasks (16% load) thru 2022-09-29
2x Animation devs working on 4 tasks (25% load) thru 2022-08-14
.~~~~~~~~~~~~~~~~~~~~~~~~~~.....~~~~~~~~~~~~~~~~~~~~~~....~~~~|~~~~~~~~~~~~~~~~~........................
..........................~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~|~~~~.....~~~~~~~~........................
- SQ42 Level Design 1 - FPS
5x Design devs will work on 4 tasks (33% load) starting 2022-08-04 thru 2022-09-14
5x Design devs will work on 4 tasks (33% load) starting 2022-08-04 thru 2022-09-14
.=====================~~~~~~~~....============........======..|=============............................
Chapter 12
- AI Content Team
2x Design devs working on 6 tasks (50% load) thru 2022-09-15
2x Design devs working on 6 tasks (50% load) thru 2022-09-15
........................................................~~~~~~|~~~~~========............................
..............................................................|.........====............................
- Cinematics Team
3x Design devs working on 29 tasks (13% load) thru 2022-09-29
4x Animation devs working on 19 tasks (11% load) thru 2022-09-29
3x Design devs working on 29 tasks (13% load) thru 2022-09-29
4x Animation devs working on 19 tasks (11% load) thru 2022-09-29
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
- SQ42 Art
12x Art devs working on 20 tasks (68% load) thru 2022-08-17
12x Art devs working on 20 tasks (68% load) thru 2022-08-17
..........................============................========|=====....................................
- SQ42 Level Design 1 - FPS
4x Design devs working on 9 tasks (45% load) thru 2022-09-28
4x Design devs working on 9 tasks (45% load) thru 2022-09-28
.=====~~~~~~~~~~~~~~~~~~~~~~~~================================|=================........................
- SQ42 Level Design 2 - Flight
5x Design devs working on 9 tasks (36% load) thru 2022-09-28
5x Design devs working on 9 tasks (36% load) thru 2022-09-28
..........................~~~~======================..========|=================........................
- SQ42 Level Design 3 - Social
3x Design devs working on 5 tasks (51% load) thru 2022-08-31
3x Design devs working on 5 tasks (51% load) thru 2022-08-31
..........................================............========|=========................................
Chapter 14
- Cinematics Team
3x Design devs working on 11 tasks (17% load) thru 2022-09-29
3x Animation devs working on 11 tasks (17% load) thru 2022-09-29
3x Design devs working on 11 tasks (17% load) thru 2022-09-29
3x Animation devs working on 11 tasks (17% load) thru 2022-09-29
..........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
..........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
- SQ42 Art
11x Art devs working on 25 tasks (46% load) thru 2022-09-28
1x Cinematics dev working on 7 tasks (141% load) thru 2022-09-28
11x Art devs working on 25 tasks (46% load) thru 2022-09-28
1x Cinematics dev working on 7 tasks (141% load) thru 2022-09-28
......................................................========|=================........................
..........................========....................========|=================........................
- SQ42 Level Design 1 - FPS
7x Design devs working on 17 tasks (49% load) thru 2022-09-28
7x Design devs working on 17 tasks (49% load) thru 2022-09-28
.=====================~~~~~~~~================================|=================........................
- SQ42 Level Design 2 - Flight
5x Design devs working on 9 tasks (36% load) thru 2022-09-28
5x Design devs working on 9 tasks (36% load) thru 2022-09-28
......================~~~~~~~~======================..========|=================........................
- VFX Team
1x Art dev working on 5 tasks (152% load) thru 2022-08-21
1x Art dev working on 5 tasks (152% load) thru 2022-08-21
....................................................==========|======...................................
- SQ42 Level Design 3 - Social
1x Design dev will work on 2 tasks (128% load) starting 2022-08-04 thru 2022-08-17
1x Design dev will work on 2 tasks (128% load) starting 2022-08-04 thru 2022-08-17
..................................~~~~........................|~~~~~....................................
Chapter 15
- Cinematics Team
3x Animation devs working on 29 tasks (14% load) thru 2022-09-29
3x Animation devs working on 29 tasks (14% load) thru 2022-09-29
.~~~~~~~~~~~~~~~~~~~~~~~~~~...................................|.........................................
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
Chapter 17
- Gameplay Story
4x Animation devs working on 7 tasks (18% load) thru 2022-09-28
4x Animation devs working on 7 tasks (18% load) thru 2022-09-28
......................................................~~~~~~~~|~~~~~~~~~~~~~~~~~........................
- SQ42 Art
1x Art dev working on 7 tasks (141% load) thru 2022-09-28
1x Art dev working on 7 tasks (141% load) thru 2022-09-28
......................................................========|=================........................
Chapter 18
- Gameplay Story
4x Animation devs working on 8 tasks (20% load) thru 2022-09-28
4x Animation devs working on 8 tasks (20% load) thru 2022-09-28
..............~~~~~...........................~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
Chapter 19
- Cinematics Team
2x Animation devs working on 9 tasks (21% load) thru 2022-09-29
2x Animation devs working on 9 tasks (21% load) thru 2022-09-29
..........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
- Gameplay Story
5x Animation devs working on 7 tasks (14% load) thru 2022-09-28
5x Animation devs working on 7 tasks (14% load) thru 2022-09-28
..................~~~~~.......~~~~~~~~........~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
..................................~~~~........................|.........................................
- SQ42 Art
3x Art devs will work on 8 tasks (102% load) starting 2022-08-18 thru 2022-09-28
3x Art devs will work on 8 tasks (102% load) starting 2022-08-18 thru 2022-09-28
..............................................................|...==============........................
Chapter 20
- Cinematics Team
2x Design devs working on 4 tasks (24% load) thru 2022-09-08
2x Design devs working on 4 tasks (24% load) thru 2022-09-08
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~|~~~~~~~~~~~..............................
.~~~~~~~~~~~~~~~~~~~~~~~~~~...................................|.........................................
- Gameplay Story
4x Animation devs working on 8 tasks (20% load) thru 2022-09-28
4x Animation devs working on 8 tasks (20% load) thru 2022-09-28
..............................................~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
- SQ42 Art
2x Art devs working on 7 tasks (70% load) thru 2022-09-28
2x Art devs working on 7 tasks (70% load) thru 2022-09-28
......................................................========|=================........................
Chapter 23
- Cinematics Team
3x Animation devs working on 13 tasks (20% load) thru 2022-09-29
3x Animation devs working on 13 tasks (20% load) thru 2022-09-29
.~~~~~~~~~~~~~~~~~~~~~~~~~~...................................|.........................................
..........................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
Character Work
- AI Content Team
5x Animation devs working on 5 tasks (31% load) thru 2022-09-01
5x Animation devs working on 5 tasks (31% load) thru 2022-09-01
..................======....................====..............|.........................................
..======================....====================........======|=========................................
- Audio
5x Audio devs working on 7 tasks (15% load) thru 2022-08-18
5x Audio devs working on 7 tasks (15% load) thru 2022-08-18
....================..........================================|=====....========........................
- Character Tech Art
7x Tech Content devs working on 11 tasks (32% load) thru 2022-09-22
7x Tech Content devs working on 11 tasks (32% load) thru 2022-09-22
......============================================....========|===============..........................
- Facial Animation
7x Animation devs working on 20 tasks (18% load) thru 2022-09-22
7x Animation devs working on 20 tasks (18% load) thru 2022-09-22
....==========================================~~~~~~~~~~======|===============..........................
- SQ42 Character Art
12x Art devs working on 19 tasks (33% load) thru 2022-09-22
12x Art devs working on 19 tasks (33% load) thru 2022-09-22
.=================================================....========|===============..........................
- Tech Animation Team
11x Tech Content devs working on 13 tasks (12% load) thru 2022-09-12
11x Tech Content devs working on 13 tasks (12% load) thru 2022-09-12
..........~~~~~~~~~~~~~~~~~...~~~~=====...~~~~========~~~~~~~~|============.............................
- Actor Feature Team
1x Engineering dev will work on 7 tasks (141% load) starting 2022-08-18 thru 2022-11-09
2x Animation devs will work on 9 tasks (90% load) starting 2022-08-18 thru 2022-11-09
1x Engineering dev will work on 7 tasks (141% load) starting 2022-08-18 thru 2022-11-09
2x Animation devs will work on 9 tasks (90% load) starting 2022-08-18 thru 2022-11-09
..............................................................|...==========================............
..............................................................|...==========================............
- Motion Capture Team
9x Animation devs will work on 16 tasks (64% load) starting 2022-08-14 thru 2022-09-29
9x Animation devs will work on 16 tasks (64% load) starting 2022-08-14 thru 2022-09-29
......=========.......====~~~~~~~~~~~~~~~~....................|...==============........................
Commodity Kiosk
- US PU Gameplay Feature Team
3x Art devs working on 7 tasks (73% load) thru 2022-08-25
3x Art devs working on 7 tasks (73% load) thru 2022-08-25
..=================.......~~~~~~~~~~~~~~~~====........========|=======..................................
..~~~~~~~~~~~~~~~~~...........................................|.........................................
Cooperative Locomotion
(Scheduled work ending soon!)
- Actor Feature Team
2x Engineering devs working on 5 tasks (71% load) thru 2022-08-17
2x Engineering devs working on 5 tasks (71% load) thru 2022-08-17
......................................................~~~~====|=====....................................
Derelict Spaceships - Points of Interest
- MTL Sandbox 1
4x Design devs working on 6 tasks (36% load) thru 2022-09-14
8x Art devs working on 11 tasks (33% load) thru 2022-09-14
4x Design devs working on 6 tasks (36% load) thru 2022-09-14
8x Art devs working on 11 tasks (33% load) thru 2022-09-14
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~============........========|=============..======================....
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~============........========|=============..======================....
- VFX Team
1x Art dev will work on 1 task (128% load) starting 2022-08-08 thru 2022-08-21
1x Art dev will work on 1 task (128% load) starting 2022-08-08 thru 2022-08-21
..............................................................|.=====...................................
DGS Crash Recovery
- Network Team
1x Engineering dev working on 8 tasks (161% load) thru 2022-09-28
1x Engineering dev working on 8 tasks (161% load) thru 2022-09-28
..................============================================|=================........................
DGS Mesh Node
- Network Team
3x Engineering devs working on 8 tasks (54% load) thru 2022-09-28
3x Engineering devs working on 8 tasks (54% load) thru 2022-09-28
..................============================================|=================........................
Doors/Airlocks/Light Panels UI
(Scheduled work ending soon!)
- SQ42 UI Feature Team
1x Art dev working on 3 tasks (455% load) thru 2022-08-04
1x Art dev working on 3 tasks (455% load) thru 2022-08-04
......................................====..................==|=........................................
..................................====........................|.........................................
Drake Corsair
- Vehicle Content - US
3x Tech Content devs working on 11 tasks (75% load) thru 2022-08-17
2x Design devs working on 7 tasks (216% load) thru 2022-08-03
3x Tech Content devs working on 11 tasks (75% load) thru 2022-08-17
2x Design devs working on 7 tasks (216% load) thru 2022-08-03
........................................~~~~..........~~~~~~~~|~~~~~....................................
..======================....========================..======..|.........................................
..======================....========================..========|=........................................
- VFX Team
1x Art dev will work on 3 tasks (385% load) starting 2022-08-08 thru 2022-08-21
1x Art dev will work on 3 tasks (385% load) starting 2022-08-08 thru 2022-08-21
..............................................................|.=====...................................
Drake Vulture
- Audio
3x Audio devs working on 8 tasks (29% load) thru 2022-09-01
3x Audio devs working on 8 tasks (29% load) thru 2022-09-01
....................========..==~~~~~~================~~======|=========................................
Dynamic Events
- Mission Feature Team
7x Design devs working on 13 tasks (13% load) thru 2022-12-22
7x Design devs working on 13 tasks (13% load) thru 2022-12-22
..================================================..~~~~~~~~~~|~~~~~~~~~~~~~============================
..========================....................................|.............============================
- US PU Gameplay Feature Team
2x Design devs working on 5 tasks (79% load) thru 2022-08-25
2x Design devs working on 5 tasks (79% load) thru 2022-08-25
..~~~~~~~~~~~~~~~~~.......~~~~~~~~~~~~~~~~~~~~........========|=======........================..........
- Narrative
2x Design devs will work on 2 tasks (152% load) starting 2022-08-07 thru 2022-08-18
2x Design devs will work on 2 tasks (152% load) starting 2022-08-07 thru 2022-08-18
..............................................................|.====....................................
Dynamic Mission System
- Mission Feature Team
1x Engineering dev working on 6 tasks (60% load) thru 2022-09-22
1x Engineering dev working on 6 tasks (60% load) thru 2022-09-22
..........................~~~~~~~~~~~~~~~~~~~~~~~~..~~~~~~~~~~|~~~~~~~~~~~~~~~..........................
Enemy Characters
- Narrative
2x Design devs working on 6 tasks (455% load) thru 2022-08-04
2x Design devs working on 6 tasks (455% load) thru 2022-08-04
............................................................==|=........................................
- SQ42 Character Art
5x Art devs working on 9 tasks (57% load) thru 2022-09-22
5x Art devs working on 9 tasks (57% load) thru 2022-09-22
..================================================....====....|===============..........................
- Weapon Content Team
5x Art devs working on 15 tasks (200% load) thru 2022-08-18
1x Animation dev working on 4 tasks (606% load) thru 2022-08-04
5x Art devs working on 15 tasks (200% load) thru 2022-08-18
1x Animation dev working on 4 tasks (606% load) thru 2022-08-04
............................................................==|=====....========........................
............................................................==|=........................................
Enemy Ships
- SQ42 Art
1x Art dev working on 7 tasks (141% load) thru 2022-09-28
1x Art dev working on 7 tasks (141% load) thru 2022-09-28
......................................................========|=================........................
EVA T2
- Actor Feature Team
2x Animation devs working on 21 tasks (33% load) thru 2022-09-28
2x Animation devs working on 21 tasks (33% load) thru 2022-09-28
..~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
- Actor Tech Team
2x Engineering devs working on 13 tasks (58% load) thru 2022-09-22
2x Engineering devs working on 13 tasks (58% load) thru 2022-09-22
............................====================~~~~~~~~~~====|===============..........................
Fire Hazard
- Graphics Team
2x Engineering devs working on 7 tasks (112% load) thru 2022-08-31
1x Tech Content dev working on 5 tasks (108% load) thru 2022-08-31
2x Engineering devs working on 7 tasks (112% load) thru 2022-08-31
1x Tech Content dev working on 5 tasks (108% load) thru 2022-08-31
..........................................................~~~~|~~~~~~~~~................................
..~~~~~~~~~~~~~~~~~~~...............................~~~~~~~~~~|~~~~~~~~~................................
- VFX Team
3x Engineering devs working on 7 tasks (103% load) thru 2022-08-21
1x Tech Content dev working on 4 tasks (123% load) thru 2022-08-21
3x Engineering devs working on 7 tasks (103% load) thru 2022-08-21
1x Tech Content dev working on 4 tasks (123% load) thru 2022-08-21
............................................................~~|~~~~~~...................................
....~~~~~~~~~~~~~~~~~~~.............=====...................~~|~~~~~~...................................
Fire Rats Armor
(Recently started!)
- SC Character Art
1x Art dev working on 5 tasks (214% load) thru 2022-09-08
1x Art dev working on 5 tasks (214% load) thru 2022-09-08
..............................................................|===========..............................
Flak Ammunition
(Recently started!)
(Scheduled work ending soon!)
- Narrative
1x Design dev working on 3 tasks (227% load) thru 2022-08-04
1x Design dev working on 3 tasks (227% load) thru 2022-08-04
............................................................~~|~........................................
FPS Devices T1
- Audio
2x Audio devs working on 11 tasks (153% load) thru 2022-09-29
2x Audio devs working on 11 tasks (153% load) thru 2022-09-29
..............................................................|=================........................
- Weapon Feature Team
2x Engineering devs working on 11 tasks (49% load) thru 2022-09-28
2x Engineering devs working on 11 tasks (49% load) thru 2022-09-28
..............==============............~~~~~~~~~~~~~~~~~~====|=================........................
FPS Radar / Scanning
- Actor Feature Team
2x Engineering devs working on 5 tasks (71% load) thru 2022-08-17
2x Engineering devs working on 5 tasks (71% load) thru 2022-08-17
..........==================================..........~~~~====|=====....................................
..~~~~~~~~~~~~~~~~~~~~~~~~~~..................................|.........................................
Frontier Clothing
- Character Tech Art
3x Tech Content devs working on 4 tasks (89% load) thru 2022-08-11
3x Tech Content devs working on 4 tasks (89% load) thru 2022-08-11
......................................========............====|===....========..........................
- SC Character Art
14x Art devs working on 14 tasks (21% load) thru 2022-09-22
14x Art devs working on 14 tasks (21% load) thru 2022-09-22
.=================================================....========|===============..........................
Gen12 - Renderer T1
- Graphics Team
7x Engineering devs working on 14 tasks (54% load) thru 2022-08-31
7x Engineering devs working on 14 tasks (54% load) thru 2022-08-31
..===================.....======================....==========|=========................................
HEX
- Live Tools Team
5x Engineering devs working on 31 tasks (36% load) thru 2022-12-19
5x Engineering devs working on 31 tasks (36% load) thru 2022-12-19
..=====================...~~~~========================~~~~~~~~|~~~~~~~~~~~~~~~~~~~=====================.
Jump Points
- Graphics Team
1x Engineering dev working on 4 tasks (163% load) thru 2022-08-10
1x Engineering dev working on 4 tasks (163% load) thru 2022-08-10
........=============.....======================....==========|===......................................
- Vehicle Feature Team
5x Engineering devs will work on 6 tasks (74% load) starting 2022-08-18 thru 2022-09-14
5x Engineering devs will work on 6 tasks (74% load) starting 2022-08-18 thru 2022-09-14
......=====...................................................|...==========............................
Ladders T1
(Scheduled work ending soon!)
- Actor Feature Team
3x Animation devs working on 14 tasks (53% load) thru 2022-08-17
1x Engineering dev will work on 3 tasks (385% load) starting 2022-08-04 thru 2022-08-17
3x Animation devs working on 14 tasks (53% load) thru 2022-08-17
1x Engineering dev will work on 3 tasks (385% load) starting 2022-08-04 thru 2022-08-17
............................====================~~~~~~~~~~====|=====....................................
..............................................................|=====....................................
- UI Tech Team
1x Engineering dev working on 3 tasks (455% load) thru 2022-08-04
1x Engineering dev working on 3 tasks (455% load) thru 2022-08-04
............................................................==|=........................................
Life Support T0
- EU PU Gameplay Feature Team
1x Engineering dev working on 6 tasks (182% load) thru 2022-08-31
1x Design dev working on 6 tasks (91% load) thru 2022-08-31
1x Engineering dev working on 6 tasks (182% load) thru 2022-08-31
1x Design dev working on 6 tasks (91% load) thru 2022-08-31
..=================...=================...............========|=========..~~~~~~~~~~~~~~~~~~~~~...~~~~~.
..~~~~~~~~~~~~~~~~~...~~~~~~~~~~~~~~~~~~~~~...~~~~~...~~~~~~~~|~~~~~~~~~..~~~~~~~~~~~~~~~~~~~~~...~~~~~.
Lorville Cityscape
- MTL Sandbox 1
4x Art devs working on 12 tasks (72% load) thru 2022-09-14
4x Art devs working on 12 tasks (72% load) thru 2022-09-14
......................................................========|=============..======================....
Map and Radar System Rework
- SQ42 UI Feature Team
3x Engineering devs working on 17 tasks (60% load) thru 2022-09-15
3x Art devs working on 4 tasks (89% load) thru 2022-08-18
3x Engineering devs working on 17 tasks (60% load) thru 2022-09-15
3x Art devs working on 4 tasks (89% load) thru 2022-08-18
..............................================================|=============............................
..........................................==============....==|=====....................................
- Graphics Team
1x Engineering dev will work on 3 tasks (250% load) starting 2022-08-11 thru 2022-08-31
1x Engineering dev will work on 3 tasks (250% load) starting 2022-08-11 thru 2022-08-31
..............................................................|.========................................
MFD Rework
- Vehicle Feature Team
8x Engineering devs working on 6 tasks (23% load) thru 2022-09-14
8x Engineering devs working on 6 tasks (23% load) thru 2022-09-14
..........................................................====|=============......==================....
- UI Tech Team
1x Engineering dev will work on 5 tasks (214% load) starting 2022-08-07 thru 2022-09-15
1x Engineering dev will work on 5 tasks (214% load) starting 2022-08-07 thru 2022-09-15
..............................................................|.============............................
Miscellaneous Support
- Actor Feature Team
3x Engineering devs working on 26 tasks (38% load) thru 2022-12-30
3x Design devs working on 29 tasks (43% load) thru 2022-12-30
3x Animation devs working on 29 tasks (43% load) thru 2022-12-30
3x Engineering devs working on 26 tasks (38% load) thru 2022-12-30
3x Design devs working on 29 tasks (43% load) thru 2022-12-30
3x Animation devs working on 29 tasks (43% load) thru 2022-12-30
..==============================================~~~~~~~~~~====|=========================================
..==============================================~~~~~~~~~~====|=========================================
..==============================================~~~~~~~~~~====|=========================================
..==========================..................................|.........................................
- Actor Tech Team
5x Engineering devs working on 23 tasks (20% load) thru 2022-09-22
5x Engineering devs working on 23 tasks (20% load) thru 2022-09-22
..~~~~~~~~~~~~~~~~~~~~======~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~====|===============..........................
- AI Content Team
2x Tech Content devs working on 11 tasks (62% load) thru 2022-09-29
2x Tech Content devs working on 11 tasks (62% load) thru 2022-09-29
..~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~........~~~~~~|~~~~~~~~~~~~~====........................
..................======....................====..............|.........................................
- Gameplay Story
1x Tech Content dev working on 8 tasks (90% load) thru 2022-09-28
1x Tech Content dev working on 8 tasks (90% load) thru 2022-09-28
.=====.===============~~~~~~..====........====~~~~~~~~~~~~~~~~|~~~~~~~~~~~======........................
- Graphics Team
1x Tech Content dev working on 5 tasks (134% load) thru 2022-08-31
4x Engineering devs working on 8 tasks (54% load) thru 2022-08-31
1x Tech Content dev working on 5 tasks (134% load) thru 2022-08-31
4x Engineering devs working on 8 tasks (54% load) thru 2022-08-31
..===================...............................==========|=========................................
..............=======.....======================....==========|=========................................
- Motion Capture Team
8x Animation devs working on 18 tasks (16% load) thru 2022-08-13
8x Animation devs working on 18 tasks (16% load) thru 2022-08-13
..========================================~~~~~~~~~~==========|=====....................................
- SQ42 Feature Team
2x Engineering devs working on 3 tasks (93% load) thru 2022-08-03
2x Engineering devs working on 3 tasks (93% load) thru 2022-08-03
..~~~~~~~~~~~~~~~~~~~~~~~~~~~~================================|=........................................
- Vehicle Feature Team
12x Engineering devs working on 8 tasks (13% load) thru 2022-09-28
3x Design devs will work on 6 tasks (61% load) starting 2022-08-04 thru 2022-09-28
12x Engineering devs working on 8 tasks (13% load) thru 2022-09-28
3x Design devs will work on 6 tasks (61% load) starting 2022-08-04 thru 2022-09-28
..............======================================..========|=================..======================
..............................======================..........|=================..======..........======
- Weapon Feature Team
5x Design devs working on 38 tasks (34% load) thru 2022-12-30
5x Design devs working on 38 tasks (34% load) thru 2022-12-30
..==============================================~~~~~~~~~~====|=========================================
..............................................................|...........======..................======
- Editor Team
3x Engineering devs will work on 4 tasks (82% load) starting 2022-08-17 thru 2022-09-13
3x Engineering devs will work on 4 tasks (82% load) starting 2022-08-17 thru 2022-09-13
......................................................~~~~====|...=========.............................
- UI Tech Team
3x Engineering devs will work on 3 tasks (152% load) starting 2022-08-07 thru 2022-08-18
3x Engineering devs will work on 3 tasks (152% load) starting 2022-08-07 thru 2022-08-18
..............................==========================......|.====....====............................
mobiGlas Rework
- SQ42 Feature Team
1x Engineering dev working on 7 tasks (141% load) thru 2022-09-28
1x Engineering dev working on 7 tasks (141% load) thru 2022-09-28
......................................................========|=================........................
New Interdiction Scenarios
- EU Sandbox 1
1x Design dev working on 4 tasks (119% load) thru 2022-08-23
1x Design dev working on 4 tasks (119% load) thru 2022-08-23
....................................................==========|======.......=========...................
New Missions - Orison
- Mission Feature Team
2x Design devs working on 6 tasks (50% load) thru 2022-09-22
2x Design devs working on 6 tasks (50% load) thru 2022-09-22
....................................................~~~~~~~~~~|.........======..........................
....................................................========~~|~~~~~~~~~~~~~~~..........................
New Player Experience
- EU Landing Zone Team
2x Art devs working on 4 tasks (123% load) thru 2022-08-03
2x Art devs working on 4 tasks (123% load) thru 2022-08-03
......................................................========|=......======......=========.............
- Narrative
1x Design dev working on 7 tasks (174% load) thru 2022-09-15
1x Design dev working on 7 tasks (174% load) thru 2022-09-15
........................................................======|=============............................
Outpost Homestead - Independent & Outlaw
- EU Sandbox 1
10x Art devs working on 20 tasks (36% load) thru 2022-09-06
4x Design devs working on 10 tasks (60% load) thru 2022-09-06
10x Art devs working on 20 tasks (36% load) thru 2022-09-06
4x Design devs working on 10 tasks (60% load) thru 2022-09-06
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========....================|==========...=================...=======.
.~~~~~~~~~~.~~~~~~~~~~~~~~~.~~~~~~..................==========|==========...............................
- Audio
3x Audio devs will work on 6 tasks (133% load) starting 2022-08-07 thru 2022-09-01
3x Audio devs will work on 6 tasks (133% load) starting 2022-08-07 thru 2022-09-01
..............................................................|.========................................
Persistent Streaming and Server Meshing
- Actor Feature Team
2x Animation devs working on 5 tasks (71% load) thru 2022-08-17
2x Animation devs working on 5 tasks (71% load) thru 2022-08-17
..==========================..................................|.........................................
....................................============......~~~~====|=====....................................
- Actor Tech Team
2x Engineering devs working on 8 tasks (67% load) thru 2022-09-22
2x Engineering devs working on 8 tasks (67% load) thru 2022-09-22
..==========================..........................========|===============..........................
- Game Services Team
10x Engineering devs working on 35 tasks (35% load) thru 2022-12-19
10x Engineering devs working on 35 tasks (35% load) thru 2022-12-19
..====================~~~~~~~~================================|========================================.
- Network Team
9x Engineering devs working on 14 tasks (15% load) thru 2022-12-30
9x Engineering devs working on 14 tasks (15% load) thru 2022-12-30
..=====.......============....................================|=========================================
- Persistent Tech Team
4x Engineering devs working on 20 tasks (47% load) thru 2022-12-30
4x Engineering devs working on 20 tasks (47% load) thru 2022-12-30
..====================~~~~~~~~================================|=========================================
- US PU Gameplay Feature Team
4x Engineering devs working on 6 tasks (24% load) thru 2022-08-25
4x Engineering devs working on 6 tasks (24% load) thru 2022-08-25
..................................============........~~~~~~~~|~~~~~~~..................................
- Vehicle Feature Team
3x Engineering devs working on 8 tasks (54% load) thru 2022-09-28
3x Engineering devs working on 8 tasks (54% load) thru 2022-09-28
......................................==============..========|=================........................
- Weapon Feature Team
1x Engineering dev working on 5 tasks (142% load) thru 2022-08-17
1x Engineering dev working on 5 tasks (142% load) thru 2022-08-17
......................................................~~~~====|=====....................................
Physical Damage & Breakability
- Physics Team
3x Engineering devs working on 6 tasks (48% load) thru 2022-09-08
3x Engineering devs working on 6 tasks (48% load) thru 2022-09-08
..===================.....======================....==========|===========..............................
Physics - Ropes Simulation
- Physics Team
1x Engineering dev working on 4 tasks (95% load) thru 2022-09-08
1x Engineering dev working on 4 tasks (95% load) thru 2022-09-08
..===================.....======================....==========|===========..............................
Player Interaction Experience T0 - Hints & Interactions
- Actor Feature Team
2x Engineering devs working on 10 tasks (61% load) thru 2022-09-28
2x Engineering devs working on 10 tasks (61% load) thru 2022-09-28
............................................====~~~~~~~~~~====|=================........................
Player Interaction Experience T1 - Lockers & Inventory
- Actor Feature Team
1x Engineering dev working on 10 tasks (120% load) thru 2022-11-09
1x Design dev working on 13 tasks (61% load) thru 2022-09-28
1x Animation dev working on 4 tasks (122% load) thru 2022-08-17
1x Engineering dev working on 10 tasks (120% load) thru 2022-11-09
1x Design dev working on 13 tasks (61% load) thru 2022-09-28
1x Animation dev working on 4 tasks (122% load) thru 2022-08-17
......................................................========|=============================............
............................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
............................============================......|.........................................
......................................................~~~~====|=====....................................
Player Interaction Experience T2 - Visor HUD & Helmet
- Actor Feature Team
1x Design dev working on 14 tasks (66% load) thru 2022-09-28
1x Design dev working on 14 tasks (66% load) thru 2022-09-28
..............................................................|...............==========================
............................~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
..............==============..................................|.........................................
Pyro Space Stations
- EU Landing Zone Team
15x Art devs working on 27 tasks (55% load) thru 2022-08-31
3x Design devs working on 9 tasks (91% load) thru 2022-08-31
15x Art devs working on 27 tasks (55% load) thru 2022-08-31
3x Design devs working on 9 tasks (91% load) thru 2022-08-31
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========....================|=========..======..=================.....
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========....================|=========..======..=================.....
- VFX Team
1x Art dev working on 3 tasks (185% load) thru 2022-08-07
1x Art dev working on 3 tasks (185% load) thru 2022-08-07
........................................................======|==.......................................
Pyro System, Planet, and Mission Setup
- US PU Gameplay Feature Team
1x Design dev working on 6 tasks (189% load) thru 2022-08-25
1x Design dev working on 6 tasks (189% load) thru 2022-08-25
......................................========........========|=======........================..........
Quantum Simulation
- Systemic Services and Tools Team
5x Engineering devs working on 27 tasks (56% load) thru 2022-12-15
5x Engineering devs working on 27 tasks (56% load) thru 2022-12-15
.=================================================....========|=======================================..
Quantum Travel Experience
- Vehicle Feature Team
2x Engineering devs working on 9 tasks (109% load) thru 2022-09-14
2x Engineering devs working on 9 tasks (109% load) thru 2022-09-14
......................................==============..========|=============......==================....
Replication Layer Entity Authority
- Network Team
6x Engineering devs working on 7 tasks (28% load) thru 2022-09-14
6x Engineering devs working on 7 tasks (28% load) thru 2022-09-14
..=========...=====.......====================........========|=============............................
Rescue/Transport Mission
- EU Landing Zone Team
1x Design dev working on 4 tasks (256% load) thru 2022-08-17
1x Design dev working on 4 tasks (256% load) thru 2022-08-17
..........................................................====|=====....................................
- Facial Animation
3x Animation devs working on 7 tasks (56% load) thru 2022-09-22
3x Animation devs working on 7 tasks (56% load) thru 2022-09-22
........................................................======|===============..........................
- Narrative
2x Design devs working on 3 tasks (227% load) thru 2022-08-04
2x Design devs working on 3 tasks (227% load) thru 2022-08-04
....====........................................====........==|=........................................
Resource Management
- EU PU Gameplay Feature Team
2x Engineering devs working on 12 tasks (72% load) thru 2022-11-22
2x Design devs working on 6 tasks (45% load) thru 2022-08-31
2x Engineering devs working on 12 tasks (72% load) thru 2022-11-22
2x Design devs working on 6 tasks (45% load) thru 2022-08-31
..........~~~~~~~~~.......=========================...========|================================...=====.
..........................~~~~~~~~~~~~~~~~~...~~~~~...~~~~~~~~|~~~~~~~~~..~~~~~~~~~~~~~~~~~~~~~...~~~~~.
- Vehicle Feature Team
3x Engineering devs working on 9 tasks (72% load) thru 2022-09-14
2x Design devs will work on 7 tasks (142% load) starting 2022-08-18 thru 2022-09-28
3x Engineering devs working on 9 tasks (72% load) thru 2022-09-14
2x Design devs will work on 7 tasks (142% load) starting 2022-08-18 thru 2022-09-28
......................................==============..========|=============............................
......................................==============..........|...==============........................
RSI Apollo
(Recently started!)
- Vehicle Content - US
4x Art devs working on 20 tasks (35% load) thru 2023-03-17
1x Design dev will work on 6 tasks (244% load) starting 2022-08-04 thru 2022-09-14
4x Art devs working on 20 tasks (35% load) thru 2023-03-17
1x Design dev will work on 6 tasks (244% load) starting 2022-08-04 thru 2022-09-14
..............................................................|=============............................
..........................................................====|=========================================
Salvage T0
- Audio
5x Audio devs working on 11 tasks (21% load) thru 2022-08-18
5x Audio devs working on 11 tasks (21% load) thru 2022-08-18
..................==========..~~~~~~~~~~~~~~~~~~~~~~~~~~~~====|=====....................................
- EU PU Gameplay Feature Team
1x Engineering dev working on 6 tasks (182% load) thru 2022-08-31
1x Engineering dev working on 6 tasks (182% load) thru 2022-08-31
..........................=================...=====...========|=========................................
- VFX Team
4x Art devs working on 6 tasks (45% load) thru 2022-08-21
4x Art devs working on 6 tasks (45% load) thru 2022-08-21
....=====================================...........==========|======...................................
....~~~~~~~~~~~~~~~~~~~~~~~~=================.......~~~~~~~~~.|.........................................
Sandbox Prison Activities
- Mission Feature Team
2x Engineering devs working on 3 tasks (41% load) thru 2022-09-08
2x Design devs working on 7 tasks (50% load) thru 2022-09-22
2x Engineering devs working on 3 tasks (41% load) thru 2022-09-08
2x Design devs working on 7 tasks (50% load) thru 2022-09-22
............................................................~~|~~~~~======..............................
....................................................~~~~~~~~~~|~~~~~~~~~~~~~~~..........................
Security Post Kareah Reactivation
- Mission Feature Team
2x Design devs working on 7 tasks (60% load) thru 2022-09-22
2x Design devs working on 7 tasks (60% load) thru 2022-09-22
....................................................====~~~~==|===============..........................
..............................................................|.....~~~~~~~~~~..........................
Ship CPU
- Audio
2x Audio devs working on 8 tasks (42% load) thru 2022-08-18
2x Audio devs working on 8 tasks (42% load) thru 2022-08-18
..............................==========~~~~~~========~~======|=====....................................
Shopkeeper Outfits
(Scheduled work ending soon!)
- Character Tech Art
2x Tech Content devs working on 3 tasks (227% load) thru 2022-08-11
2x Tech Content devs working on 3 tasks (227% load) thru 2022-08-11
......................................................====....|===......................................
SQ42 - Vehicle Support
- Vehicle Content - US
2x Art devs working on 11 tasks (108% load) thru 2022-10-15
1x Design dev will work on 5 tasks (203% load) starting 2022-08-04 thru 2022-09-14
2x Art devs working on 11 tasks (108% load) thru 2022-10-15
1x Design dev will work on 5 tasks (203% load) starting 2022-08-04 thru 2022-09-14
................................====..........................|.........................................
..............................................................|=============............................
..........................................................====|=======================..................
Unannounced Vehicle
- Vehicle Content - EU
2x Design devs working on 13 tasks (146% load) thru 2022-09-15
4x Art devs working on 34 tasks (71% load) thru 2022-10-20
2x Design devs working on 13 tasks (146% load) thru 2022-09-15
4x Art devs working on 34 tasks (71% load) thru 2022-10-20
............................~~~~~~~~~~~~~~~~~~~~~~....========|=============....~~~~~~~~~~~~~~..........
............................==================================|=======================..................
- Vehicle Feature Team
2x Design devs working on 7 tasks (224% load) thru 2022-08-17
2x Design devs working on 7 tasks (224% load) thru 2022-08-17
..........................................................====|=====....................................
- Vehicle Content - US
3x Tech Content devs will work on 10 tasks (103% load) starting 2022-08-18 thru 2022-09-14
3x Tech Content devs will work on 10 tasks (103% load) starting 2022-08-18 thru 2022-09-14
..............................................................|...~~~~~~~~~~....==========..............
Unannounced Vehicle
- Audio
1x Audio dev working on 10 tasks (98% load) thru 2022-09-01
1x Audio dev working on 10 tasks (98% load) thru 2022-09-01
..............................================================|=========................................
Unannounced Vehicle
- Vehicle Content - EU
2x Design devs working on 13 tasks (73% load) thru 2022-09-15
2x Design devs working on 13 tasks (73% load) thru 2022-09-15
..............========..........................~~....~~~~~~~~|~~~~~~~~~~~~~............................
..............============............................======..|.........................................
- Vehicle Content - US
3x Tech Content devs working on 11 tasks (75% load) thru 2022-08-17
3x Tech Content devs working on 11 tasks (75% load) thru 2022-08-17
......................................................~~~~~~~~|~~~~~....................................
- Audio
2x Audio devs will work on 4 tasks (303% load) starting 2022-08-07 thru 2022-08-18
2x Audio devs will work on 4 tasks (303% load) starting 2022-08-07 thru 2022-08-18
..............................................................|.====....====............................
Unannounced Vehicle
(Scheduled work ending soon!)
- Vehicle Concept Art
4x Art devs working on 13 tasks (139% load) thru 2022-08-11
4x Art devs working on 13 tasks (139% load) thru 2022-08-11
............................==============............========|===......................................
Unannounced Vehicle
- Vehicle Concept Art
2x Art devs working on 10 tasks (181% load) thru 2022-08-18
2x Art devs working on 10 tasks (181% load) thru 2022-08-18
......................................................========|=====....................................
Unified Itemports - FPS
- Character Tech Art
5x Tech Content devs working on 4 tasks (53% load) thru 2022-08-25
5x Tech Content devs working on 4 tasks (53% load) thru 2022-08-25
......................................................====....|=======..................................
Virtual AI Service
- Systemic Services and Tools Team
1x Engineering dev working on 7 tasks (212% load) thru 2022-08-31
1x Engineering dev working on 7 tasks (212% load) thru 2022-08-31
..................=====...............................========|=========................................
Visor/Lens Rework
(Scheduled work ending soon!)
- SQ42 UI Feature Team
1x Engineering dev working on 3 tasks (455% load) thru 2022-08-04
1x Engineering dev working on 3 tasks (455% load) thru 2022-08-04
..............................====..........========........==|=........................................
..........................................======..............|.........................................
XenoThreat Armor
- SC Character Art
4x Art devs working on 8 tasks (41% load) thru 2022-09-22
4x Art devs working on 8 tasks (41% load) thru 2022-09-22
..============....========............................========|===============..........................
Zero G Push & Pull
- Actor Feature Team
2x Animation devs working on 20 tasks (31% load) thru 2022-09-28
2x Animation devs working on 20 tasks (31% load) thru 2022-09-28
..~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~........................
- Actor Tech Team
1x Engineering dev working on 8 tasks (134% load) thru 2022-09-22
1x Engineering dev working on 8 tasks (134% load) thru 2022-09-22
......................................................========|===============..........................
The following deliverables are scheduled to begin (or continue) work within two weeks
AI - Utility
(Starting soon!)
- AI Content Team
2x Animation devs will work on 3 tasks (227% load) starting 2022-08-07 thru 2022-08-18
2x Animation devs will work on 3 tasks (227% load) starting 2022-08-07 thru 2022-08-18
..............................................................|.====....========........................
Chapter 05
- SQ42 Art
6x Art devs will work on 8 tasks (54% load) starting 2022-08-18 thru 2022-09-28
6x Art devs will work on 8 tasks (54% load) starting 2022-08-18 thru 2022-09-28
..............................................................|...==============........................
Chapter 13
- SQ42 Level Design 3 - Social
1x Design dev will work on 4 tasks (163% load) starting 2022-08-18 thru 2022-09-28
1x Design dev will work on 4 tasks (163% load) starting 2022-08-18 thru 2022-09-28
..~~~~~~~~~~~~~~~~~~..................================........|...==============........................
Charge/Drain T0
- Weapon Feature Team
2x Engineering devs will work on 8 tasks (80% load) starting 2022-08-18 thru 2022-11-09
2x Engineering devs will work on 8 tasks (80% load) starting 2022-08-18 thru 2022-11-09
........................................========~~~~~~~~......|...==========================............
Chemline
(Scheduled work ending soon!)
- Narrative
1x Design dev will work on 3 tasks (455% load) starting 2022-08-07 thru 2022-08-18
1x Design dev will work on 3 tasks (455% load) starting 2022-08-07 thru 2022-08-18
................~~~~..........................................|.====....................................
Ecosystem Enhancements
- Planet Tech Team
1x Engineering dev will work on 4 tasks (247% load) starting 2022-08-17 thru 2022-09-13
1x Engineering dev will work on 4 tasks (247% load) starting 2022-08-17 thru 2022-09-13
......................=============================...========|...=========.............................
Entity Properties Plugin
- Editor Team
1x Engineering dev will work on 4 tasks (247% load) starting 2022-08-17 thru 2022-09-13
1x Engineering dev will work on 4 tasks (247% load) starting 2022-08-17 thru 2022-09-13
..=========...=========...............========~~~~~~~~~~~~====|...=========.............................
FS-Tech-Anim - Asset Integration
- Tech Animation Team
7x Tech Content devs will work on 4 tasks (35% load) starting 2022-08-16 thru 2022-09-12
7x Tech Content devs will work on 4 tasks (35% load) starting 2022-08-16 thru 2022-09-12
..=========...................=====...=====.......=====.......|...=========.............................
NPC Scheduler Service
- Systemic Services and Tools Team
2x Engineering devs will work on 5 tasks (154% load) starting 2022-08-04 thru 2022-08-31
2x Engineering devs will work on 5 tasks (154% load) starting 2022-08-04 thru 2022-08-31
......................................========................|=========................................
Persistent Hangars
- US PU Gameplay Feature Team
3x Engineering devs will work on 4 tasks (202% load) starting 2022-08-14 thru 2022-08-25
3x Engineering devs will work on 4 tasks (202% load) starting 2022-08-14 thru 2022-08-25
..............................................................|...====........~~~~~~~~~~~~~~~~..........
RaStar
- Planet Tech Team
2x Engineering devs will work on 4 tasks (123% load) starting 2022-08-17 thru 2022-09-13
2x Engineering devs will work on 4 tasks (123% load) starting 2022-08-17 thru 2022-09-13
..=================================...=========.......========|...=========.............................
Save/Load
- SQ42 Feature Team
2x Engineering devs will work on 5 tasks (76% load) starting 2022-08-04 thru 2022-09-28
2x Engineering devs will work on 5 tasks (76% load) starting 2022-08-04 thru 2022-09-28
..............................................................|=================........................
StarWords Improvements
- Tools Team
2x Engineering devs will work on 7 tasks (216% load) starting 2022-08-03 thru 2022-08-30
2x Engineering devs will work on 7 tasks (216% load) starting 2022-08-03 thru 2022-08-30
..=========...=========...=========...========~~~~~~~~~~~~~...|========...=====.........................
Unannounced Vehicle
(Starting soon!)
- Vehicle Concept Art
1x Art dev will work on 4 tasks (1667% load) starting 2022-08-14 thru 2022-08-18
1x Art dev will work on 4 tasks (1667% load) starting 2022-08-14 thru 2022-08-18
..............................................................|...==............==============..........
Underground Facilities
- EU Sandbox 1
1x Art dev will work on 4 tasks (247% load) starting 2022-08-10 thru 2022-09-06
1x Art dev will work on 4 tasks (247% load) starting 2022-08-10 thru 2022-09-06
..............................................................|.=========...............................