Scheduled Deliverables
as of 2022-05-25
There are currently 99 scheduled deliverables being worked on by 45 teams
13 deliverables are scheduled to begin work by 11 team(s) within two weeks
This report lists the actively assigned deliverables and the associated teams, along with the number of developers assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.
The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.
The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.
extra analysis (click me)
There are approximately 434 devs (out of ~512, or 85%) with 939 assignments scheduled to work on 99 observable deliverables. Of those deliverables, 21% are for SQ42 exclusively, with ~198 devs (39%) scheduled for approximately 1911 man-days. 33% of deliverables are shared between both projects.
17 deliverable(s) are not currently scheduled to continue work after this sprint:
- AI - Arcade Machine
- AI - Navigation Links - Ladders/Ledge Grab
- AI - Untrained Combat
- AI - Usable System V2
- Chapter 08
- ECUS Improvements
- Fire Hazard
- Gen12 - Renderer T1
- Hospital Surgeon
- Personal Inventory
- Physical Damage & Breakability
- Physics - Ropes Simulation
- Replication Layer Entity Authority
- Stanton Fashion Clothing
- Subsumption Editor Integration
- Turret Usability Improvements
- VisArea Improvements
- Actor Feature Team
39% part-time with 178 task(s) scheduled, 48% of which are for SQ42 - Actor Tech Team
40% part-time with 58 task(s) scheduled, 38% of which are for SQ42 - AI Content Team
31% part-time with 16 task(s) scheduled, 56% of which are for SQ42 - AI Tech and Feature Team
24% part-time with 38 task(s) scheduled, 57% of which are for SQ42 - Arena Commander Feature Team
21% part-time with 38 task(s) scheduled, 50% of which are for SQ42 - Audio
full-time with 22 task(s) scheduled, 60% of which are for SQ42 - Character Tech Art
full-time with 26 task(s) scheduled, 40% of which are for SQ42 - Cinematics Team
89% part-time with 166 task(s) scheduled, all of which are for SQ42 - Editor Team
full-time with 12 task(s) scheduled, 50% of which are for SQ42 - Engine Team
46% part-time with 28 task(s) scheduled, 50% of which are for SQ42 - EU Landing Zone Team
full-time with 17 task(s) scheduled, 40% of which are for SQ42 - EU Sandbox 1
full-time with 20 task(s) scheduled, 50% of which are for SQ42 - Facial Animation
full-time with 16 task(s) scheduled, all of which are for SQ42 - Firesprite Team
69% part-time with 32 task(s) scheduled, all of which are for SC - Game Services Team
6% part-time with 72 task(s) scheduled, all of which are for SC - Gameplay Story
96% part-time with 53 task(s) scheduled, 89% of which are for SQ42 - Graphics Team
full-time with 21 task(s) scheduled, 50% of which are for SQ42 - Lighting Team
full-time with 19 task(s) scheduled, 33% of which are for SQ42 - Live Tools Team
26% part-time with 38 task(s) scheduled, 25% of which are for SQ42 - Location Concept Art
full-time with 46 task(s) scheduled, all of which are for SC - Mission Feature Team
40% part-time with 96 task(s) scheduled, all of which are for SC - Motion Capture Team
8% part-time with 13 task(s) scheduled, 50% of which are for SQ42 - MTL Sandbox 1
85% part-time with 59 task(s) scheduled, all of which are for SC - Narrative
77% part-time with 13 task(s) scheduled, all of which are for SC - Network Team
full-time with 34 task(s) scheduled, 20% of which are for SQ42 - Persistent Tech Team
9% part-time with 22 task(s) scheduled, all of which are for SC - Physics Team
full-time with 22 task(s) scheduled, 50% of which are for SQ42 - Props Team
full-time with 11 task(s) scheduled, 50% of which are for SQ42 - SC Character Art
3% part-time with 33 task(s) scheduled, 25% of which are for SQ42 - SQ42 Art
14% part-time with 94 task(s) scheduled, all of which are for SQ42 - SQ42 Character Art
5% part-time with 55 task(s) scheduled, all of which are for SQ42 - SQ42 Feature Team
62% part-time with 13 task(s) scheduled, 50% of which are for SQ42 - SQ42 Level Design 1 - FPS
15% part-time with 66 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 2 - Flight
29% part-time with 45 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 3 - Social
6% part-time with 17 task(s) scheduled, all of which are for SQ42 - SQ42 UI Feature Team
full-time with 30 task(s) scheduled, 50% of which are for SQ42 - Systemic Services and Tools Team
14% part-time with 80 task(s) scheduled, all of which are for SC - Tech Animation Team
13% part-time with 15 task(s) scheduled, 67% of which are for SQ42 - Tools Team
full-time with 26 task(s) scheduled, 50% of which are for SQ42 - UI Tech Team
full-time with 15 task(s) scheduled, 50% of which are for SQ42 - US PU Gameplay Feature Team
66% part-time with 73 task(s) scheduled, 9% of which are for SQ42 - Vehicle Content - EU
33% part-time with 220 task(s) scheduled, 14% of which are for SQ42 - Vehicle Content - US
19% part-time with 36 task(s) scheduled, 13% of which are for SQ42 - Vehicle Feature Team
full-time with 40 task(s) scheduled, 50% of which are for SQ42 - VFX Team
33% part-time with 12 task(s) scheduled, 33% of which are for SQ42 - Weapon Content Team
full-time with 8 task(s) scheduled, 50% of which are for SQ42 - Weapon Feature Team
20% part-time with 50 task(s) scheduled, 44% of which are for SQ42
AI - Arcade Machine
(Scheduled work ending soon!)
- AI Content Team
1x Animation dev working on 2 tasks (133% load) thru 2022-06-09
1x Animation dev working on 2 tasks (133% load) thru 2022-06-09
..............==========................==|=====........................................................
..........~~~~~~....................~~~~..|.............................................................
AI - Navigation Links - Ladders/Ledge Grab
(Scheduled work ending soon!)
- AI Tech and Feature Team
1x Engineering dev working on 2 tasks (133% load) thru 2022-05-26
1x Engineering dev working on 2 tasks (133% load) thru 2022-05-26
......==========....................======|=............................................................
AI - Untrained Combat
(Scheduled work ending soon!)
- AI Tech and Feature Team
2x Animation devs working on 3 tasks (64% load) thru 2022-06-09
2x Animation devs working on 3 tasks (64% load) thru 2022-06-09
..........==============............======|=====........................................................
AI - Usable System V2
(Scheduled work ending soon!)
- AI Tech and Feature Team
2x Engineering devs working on 5 tasks (37% load) thru 2022-06-09
2x Engineering devs working on 5 tasks (37% load) thru 2022-06-09
..~~~~~~~~~~~~~~~~~~........~~~~~~~~~~~~~~|~====........................................................
Animatable Gunner Helmet
- SC Character Art
1x Art dev working on 4 tasks (267% load) thru 2022-06-16
1x Art dev working on 4 tasks (267% load) thru 2022-06-16
..........................................|=======......................................................
AR and Map Marker System Rework
- UI Tech Team
2x Engineering devs working on 5 tasks (68% load) thru 2022-06-24
2x Engineering devs working on 5 tasks (68% load) thru 2022-06-24
..................................========|=========....................................................
Archon
- SQ42 Art
14x Art devs working on 17 tasks (38% load) thru 2022-06-30
14x Art devs working on 17 tasks (38% load) thru 2022-06-30
.==========================...........====|===========..................................................
Argo SRV
- Vehicle Content - EU
4x Art devs working on 28 tasks (63% load) thru 2022-10-20
1x Design dev working on 10 tasks (139% load) thru 2022-06-16
4x Art devs working on 28 tasks (63% load) thru 2022-10-20
1x Design dev working on 10 tasks (139% load) thru 2022-06-16
................................==========|===========================================..................
................................~~~~~~~~~~|~~~~~~~....======================....~~~~~~~~~~~~~~~~~~~~~~..
Audio to Animation Toolset
- Tech Animation Team
3x Tech Content devs working on 5 tasks (68% load) thru 2022-06-20
3x Tech Content devs working on 5 tasks (68% load) thru 2022-06-20
......................................====|========.....................................................
Banu Merchantman
- Narrative
2x Design devs working on 2 tasks (152% load) thru 2022-05-26
2x Design devs working on 2 tasks (152% load) thru 2022-05-26
................................====....==|=............................................................
- Vehicle Content - EU
12x Art devs working on 27 tasks (23% load) thru 2022-06-16
3x Design devs working on 5 tasks (100% load) thru 2022-06-16
12x Art devs working on 27 tasks (23% load) thru 2022-06-16
3x Design devs working on 5 tasks (100% load) thru 2022-06-16
..========================================|=======....======================....======================..
..============~~~~~~~~==~~................|=====~~....~~~~~~~~~~~~~~~~~~~~~~....======================..
- VFX Team
1x Art dev working on 1 task (64% load) thru 2022-05-29
1x Art dev working on 1 task (64% load) thru 2022-05-29
........................................~~|~~...........................................................
- Weapon Content Team
3x Art devs will work on 5 tasks (111% load) starting 2022-05-29 thru 2022-06-23
3x Art devs will work on 5 tasks (111% load) starting 2022-05-29 thru 2022-06-23
..................========....========....|.========....................................................
Bug Fixing & Tech Debt
- Actor Tech Team
2x Engineering devs working on 13 tasks (59% load) thru 2022-07-07
2x Engineering devs working on 13 tasks (59% load) thru 2022-07-07
..========================================|=============................................................
- AI Content Team
4x Animation devs working on 2 tasks (76% load) thru 2022-05-26
5x Design devs working on 1 task (30% load) thru 2022-05-26
4x Animation devs working on 2 tasks (76% load) thru 2022-05-26
5x Design devs working on 1 task (30% load) thru 2022-05-26
..............======....................==|=............................................................
......======..======............====....==|=............................................................
- AI Tech and Feature Team
10x Engineering devs working on 5 tasks (30% load) thru 2022-06-09
10x Engineering devs working on 5 tasks (30% load) thru 2022-06-09
..............====~~~~~~................==|=~~~~........................................................
- Arena Commander Feature Team
2x Design devs working on 8 tasks (70% load) thru 2022-07-07
4x Engineering devs working on 8 tasks (18% load) thru 2022-07-07
2x Design devs working on 8 tasks (70% load) thru 2022-07-07
4x Engineering devs working on 8 tasks (18% load) thru 2022-07-07
..======================....==============|=============................................................
..~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~|~~~~~~~~~~~~~................................................
- Character Tech Art
6x Tech Content devs working on 6 tasks (43% load) thru 2022-06-16
6x Tech Content devs working on 6 tasks (43% load) thru 2022-06-16
..============........................====|=======......................................................
- Engine Team
4x Engineering devs working on 7 tasks (29% load) thru 2022-07-07
4x Engineering devs working on 7 tasks (29% load) thru 2022-07-07
.~================~~~~~~~~~.==============|=~~~~~~~~~~~~................................................
- EU Landing Zone Team
15x Art devs working on 12 tasks (121% load) thru 2022-06-02
5x Design devs working on 3 tasks (91% load) thru 2022-06-02
15x Art devs working on 12 tasks (121% load) thru 2022-06-02
5x Design devs working on 3 tasks (91% load) thru 2022-06-02
..............~~~~~~~~~...................|===........................======......................======
..............~~~~~~~~~...................|===........................======......................======
- EU Sandbox 1
11x Art devs working on 14 tasks (193% load) thru 2022-06-02
6x Design devs working on 6 tasks (152% load) thru 2022-06-02
11x Art devs working on 14 tasks (193% load) thru 2022-06-02
6x Design devs working on 6 tasks (152% load) thru 2022-06-02
..............~~~~~~~~~...................|===..........................=====...............=====.......
..............~~~~~~~~~...................|===..........................=====...............=====.......
- Live Tools Team
2x Engineering devs working on 7 tasks (61% load) thru 2022-06-30
2x Engineering devs working on 7 tasks (61% load) thru 2022-06-30
..........................================|=====================================........................
- Network Team
2x Engineering devs working on 7 tasks (61% load) thru 2022-06-30
2x Engineering devs working on 7 tasks (61% load) thru 2022-06-30
..=========.......=====...================|===========..................................................
- Physics Team
4x Engineering devs working on 9 tasks (21% load) thru 2022-06-29
4x Engineering devs working on 9 tasks (21% load) thru 2022-06-29
..========================================|===========..................................................
- Vehicle Feature Team
12x Engineering devs working on 13 tasks (21% load) thru 2022-06-23
12x Engineering devs working on 13 tasks (21% load) thru 2022-06-23
..=================.......================|=========..==============..........======....................
..........................======..........|...........======..................======....................
- Weapon Content Team
5x Art devs working on 6 tasks (500% load) thru 2022-05-26
1x Animation dev working on 2 tasks (833% load) thru 2022-05-26
5x Art devs working on 6 tasks (500% load) thru 2022-05-26
1x Animation dev working on 2 tasks (833% load) thru 2022-05-26
..==......====............................|=............................................................
............==....==........==............|=............................................................
- Actor Feature Team
1x Engineering dev will work on 3 tasks (107% load) starting 2022-05-29 thru 2022-07-07
1x Engineering dev will work on 3 tasks (107% load) starting 2022-05-29 thru 2022-07-07
..........................................|.====~~~~~~~~..........==============........................
- Audio
26x Audio devs will work on 5 tasks (10% load) starting 2022-05-29 thru 2022-06-30
26x Audio devs will work on 5 tasks (10% load) starting 2022-05-29 thru 2022-06-30
..==......==................============..|.==========..................................................
- EU PU Gameplay Feature Team
4x Engineering devs will work on 2 tasks (64% load) starting 2022-06-08 thru 2022-06-21
4x Engineering devs will work on 2 tasks (64% load) starting 2022-06-08 thru 2022-06-21
..........................................|...=====.....................................................
- Graphics Team
10x Engineering devs will work on 20 tasks (167% load) starting 2022-06-09 thru 2022-06-29
2x Tech Content devs will work on 4 tasks (167% load) starting 2022-06-09 thru 2022-06-29
10x Engineering devs will work on 20 tasks (167% load) starting 2022-06-09 thru 2022-06-29
2x Tech Content devs will work on 4 tasks (167% load) starting 2022-06-09 thru 2022-06-29
....................=======...............|...========..................................................
....................~~~~~~~...............|...========..................................................
- Props Team
12x Art devs will work on 18 tasks (625% load) starting 2022-05-29 thru 2022-06-02
2x Tech Content devs will work on 4 tasks (833% load) starting 2022-05-29 thru 2022-06-02
12x Art devs will work on 18 tasks (625% load) starting 2022-05-29 thru 2022-06-02
2x Tech Content devs will work on 4 tasks (833% load) starting 2022-05-29 thru 2022-06-02
......====........====..======....==......|.==......==..................................................
......====........====....====....==......|.==......==..................................................
- Systemic Services and Tools Team
5x Engineering devs will work on 8 tasks (242% load) starting 2022-06-05 thru 2022-06-16
5x Engineering devs will work on 8 tasks (242% load) starting 2022-06-05 thru 2022-06-16
..................=========...............|...====....................==========..................====..
- US PU Gameplay Feature Team
4x Engineering devs will work on 4 tasks (152% load) starting 2022-06-05 thru 2022-06-16
3x Art devs will work on 4 tasks (202% load) starting 2022-06-05 thru 2022-06-16
4x Design devs will work on 6 tasks (227% load) starting 2022-06-05 thru 2022-06-16
4x Engineering devs will work on 4 tasks (152% load) starting 2022-06-05 thru 2022-06-16
3x Art devs will work on 4 tasks (202% load) starting 2022-06-05 thru 2022-06-16
4x Design devs will work on 6 tasks (227% load) starting 2022-06-05 thru 2022-06-16
..................~~~~~~~~~...............|...====....................========................==========
..................====~~~~~...............|...====....................========................==========
..............========~~~~~...............|...====....................========................==========
- Vehicle Content - US
3x Tech Content devs will work on 3 tasks (67% load) starting 2022-05-29 thru 2022-06-23
3x Tech Content devs will work on 3 tasks (67% load) starting 2022-05-29 thru 2022-06-23
....====........========..................|.========......................~~~~~~....................====
Building Interiors
- Location Concept Art
7x Art devs working on 8 tasks (20% load) thru 2022-06-30
7x Art devs working on 8 tasks (20% load) thru 2022-06-30
..........................================|=============================================================
- MTL Sandbox 1
10x Art devs working on 39 tasks (8% load) thru 2022-06-02
10x Art devs working on 39 tasks (8% load) thru 2022-06-02
..~~~~~~~~~~~~~~~~~~~~~...................|...........======================..======================....
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~========|===........======================..======================....
Cargo System Refactor
- EU Landing Zone Team
1x Art dev working on 2 tasks (85% load) thru 2022-06-30
1x Art dev working on 2 tasks (85% load) thru 2022-06-30
..........................................|===========..................................................
- US PU Gameplay Feature Team
3x Engineering devs working on 12 tasks (33% load) thru 2022-06-02
2x Design devs working on 5 tasks (31% load) thru 2022-06-02
3x Engineering devs working on 12 tasks (33% load) thru 2022-06-02
2x Design devs working on 5 tasks (31% load) thru 2022-06-02
..~~~~~~~~========~~~~~~~~~~~~============|===........============......................................
..........................~~~~~~~~~~~~~~~~|~~~..........................................................
..........................============....|.............................................................
Chapter 01
- Audio
2x Audio devs working on 6 tasks (156% load) thru 2022-06-02
2x Audio devs working on 6 tasks (156% load) thru 2022-06-02
....................................======|===..........................................................
- Cinematics Team
3x Animation devs working on 24 tasks (19% load) thru 2022-06-29
2x Design devs working on 16 tasks (19% load) thru 2022-06-29
3x Animation devs working on 24 tasks (19% load) thru 2022-06-29
2x Design devs working on 16 tasks (19% load) thru 2022-06-29
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
.~~~~~~~~~~~~~~~~~~~~~~~~~======~~~~~~~~~~|~~~~~~~~~~~..................................................
- Gameplay Story
5x Animation devs working on 8 tasks (14% load) thru 2022-06-30
5x Animation devs working on 8 tasks (14% load) thru 2022-06-30
..~~~~....................~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
..........................~~~~....~~~~....|.............................................................
- SQ42 Level Design 2 - Flight
5x Design devs working on 24 tasks (18% load) thru 2022-06-22
5x Design devs working on 24 tasks (18% load) thru 2022-06-22
.=====================~~~~~~~~============|=========....................................................
- SQ42 Level Design 3 - Social
3x Design devs working on 2 tasks (28% load) thru 2022-06-30
3x Design devs working on 2 tasks (28% load) thru 2022-06-30
..~~~~~~~~~~~~~~~~======..====....====....|===========..................................................
- SQ42 UI Feature Team
2x Art devs working on 6 tasks (83% load) thru 2022-06-09
2x Art devs working on 6 tasks (83% load) thru 2022-06-09
..............................============|=====........................................................
Chapter 02
- Cinematics Team
1x Design dev working on 4 tasks (74% load) thru 2022-06-29
2x Animation devs working on 5 tasks (36% load) thru 2022-06-08
1x Design dev working on 4 tasks (74% load) thru 2022-06-29
2x Animation devs working on 5 tasks (36% load) thru 2022-06-08
........................................~~|~~~~~~~~~~~..................................................
..........................~~~~~~~~~~~~~~~~|~~~~~........................................................
Chapter 06
- SQ42 Level Design 3 - Social
2x Design devs working on 6 tasks (54% load) thru 2022-06-30
2x Design devs working on 6 tasks (54% load) thru 2022-06-30
..~~~~~~~~~~~~~~~~======..================|===========..................................................
Chapter 08
(Scheduled work ending soon!)
- Gameplay Story
5x Animation devs working on 6 tasks (91% load) thru 2022-06-02
5x Animation devs working on 6 tasks (91% load) thru 2022-06-02
..~~~~....~~~~~.......~~~~~~~~~~~~........|~~~..........................................................
..........................~~~~............|.............................................................
Chapter 10
- SQ42 Level Design 3 - Social
1x Design dev working on 6 tasks (99% load) thru 2022-06-30
1x Design dev working on 6 tasks (99% load) thru 2022-06-30
..~~~~~~..................========~~~~====|===========..................................................
Chapter 11
- Cinematics Team
3x Design devs working on 5 tasks (20% load) thru 2022-06-29
2x Animation devs will work on 2 tasks (42% load) starting 2022-06-09 thru 2022-06-29
3x Design devs working on 5 tasks (20% load) thru 2022-06-29
2x Animation devs will work on 2 tasks (42% load) starting 2022-06-09 thru 2022-06-29
.~~~~~~~~~~~~~~~~~~~~~~~~~~.....~~~~~~~~~~|~~~~~~~~~~~..................................................
..........................~~~~~~~~~~~~~~~~|...~~~~~~~~..................................................
- Gameplay Story
4x Animation devs working on 8 tasks (18% load) thru 2022-06-30
4x Animation devs working on 8 tasks (18% load) thru 2022-06-30
..........................~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
- SQ42 Level Design 1 - FPS
5x Design devs working on 3 tasks (26% load) thru 2022-06-02
5x Design devs working on 3 tasks (26% load) thru 2022-06-02
.=====================~~~~~~~~....========|===..........................................................
Chapter 12
- Cinematics Team
3x Design devs working on 26 tasks (13% load) thru 2022-06-29
3x Animation devs working on 17 tasks (18% load) thru 2022-06-29
3x Design devs working on 26 tasks (13% load) thru 2022-06-29
3x Animation devs working on 17 tasks (18% load) thru 2022-06-29
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
- Gameplay Story
5x Animation devs working on 14 tasks (25% load) thru 2022-06-30
5x Animation devs working on 14 tasks (25% load) thru 2022-06-30
..............~~~~~.......~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
..........................~~~~....~~~~~~~~|.............................................................
- SQ42 Level Design 1 - FPS
4x Design devs working on 18 tasks (21% load) thru 2022-06-30
4x Design devs working on 18 tasks (21% load) thru 2022-06-30
.~====~~~~~~~~~~~~~~~~~~~~~~~~============|===========..................................................
- SQ42 Level Design 2 - Flight
5x Design devs working on 7 tasks (24% load) thru 2022-06-22
5x Design devs working on 7 tasks (24% load) thru 2022-06-22
..........................================|=========....................................................
Chapter 13
- Gameplay Story
5x Animation devs working on 2 tasks (30% load) thru 2022-06-02
5x Animation devs working on 2 tasks (30% load) thru 2022-06-02
..........................................|~~~..........................................................
- SQ42 Level Design 3 - Social
1x Design dev working on 3 tasks (94% load) thru 2022-06-30
1x Design dev working on 3 tasks (94% load) thru 2022-06-30
..~~~~~~~~~~~~~~~~~~..................====|===========..................................................
Chapter 14
- Cinematics Team
3x Design devs working on 5 tasks (15% load) thru 2022-06-29
3x Animation devs working on 5 tasks (15% load) thru 2022-06-29
3x Design devs working on 5 tasks (15% load) thru 2022-06-29
3x Animation devs working on 5 tasks (15% load) thru 2022-06-29
..........................~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
..........................~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
- Gameplay Story
3x Animation devs working on 6 tasks (18% load) thru 2022-06-30
3x Animation devs working on 6 tasks (18% load) thru 2022-06-30
..........................~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
- SQ42 Level Design 1 - FPS
6x Design devs working on 37 tasks (18% load) thru 2022-06-30
6x Design devs working on 37 tasks (18% load) thru 2022-06-30
.=====================~~~~~~~~============|===========..................................................
- SQ42 Level Design 2 - Flight
5x Design devs working on 14 tasks (29% load) thru 2022-06-22
5x Design devs working on 14 tasks (29% load) thru 2022-06-22
......================~~~~~~~~============|=========....................................................
Chapter 15
- Cinematics Team
3x Animation devs working on 26 tasks (15% load) thru 2022-06-29
3x Animation devs working on 26 tasks (15% load) thru 2022-06-29
.~~~~~~~~~~~~~~~~~~~~~~~~~~...............|.............................................................
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
- Gameplay Story
5x Animation devs working on 7 tasks (30% load) thru 2022-06-30
5x Animation devs working on 7 tasks (30% load) thru 2022-06-30
..............~~~~~...~~~~~~..............|~~~~~~~~~~~..................................................
Chapter 19
- Cinematics Team
2x Animation devs working on 6 tasks (28% load) thru 2022-06-29
2x Animation devs working on 6 tasks (28% load) thru 2022-06-29
..........................~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
- SQ42 Level Design 1 - FPS
3x Design devs working on 3 tasks (43% load) thru 2022-06-30
3x Design devs working on 3 tasks (43% load) thru 2022-06-30
......~~~~~~~~~~~~~~~~~~~~~~..............|===========..................................................
- Gameplay Story
5x Animation devs will work on 6 tasks (40% load) starting 2022-06-05 thru 2022-06-30
5x Animation devs will work on 6 tasks (40% load) starting 2022-06-05 thru 2022-06-30
..................~~~~~.......~~~~~~~~....|...~~~~~~~~..................................................
Chapter 20
- Cinematics Team
2x Design devs working on 16 tasks (27% load) thru 2022-06-08
2x Design devs working on 16 tasks (27% load) thru 2022-06-08
.~~~~~~~~~~~~~~~~~~~~~~~~~~...............|.............................................................
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~........................................................
- Gameplay Story
4x Animation devs will work on 6 tasks (50% load) starting 2022-06-05 thru 2022-06-30
4x Animation devs will work on 6 tasks (50% load) starting 2022-06-05 thru 2022-06-30
..........................................|...~~~~~~~~..................................................
Chapter 22
- SQ42 Level Design 1 - FPS
6x Design devs working on 2 tasks (14% load) thru 2022-06-30
6x Design devs working on 2 tasks (14% load) thru 2022-06-30
......================~~~~~~..............|===========..................................................
- Gameplay Story
4x Animation devs will work on 6 tasks (50% load) starting 2022-06-05 thru 2022-06-30
4x Animation devs will work on 6 tasks (50% load) starting 2022-06-05 thru 2022-06-30
..........................................|...~~~~~~~~..................................................
Chapter 23
- Cinematics Team
3x Animation devs working on 11 tasks (34% load) thru 2022-06-29
3x Animation devs working on 11 tasks (34% load) thru 2022-06-29
..........................~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
.~~~~~~~~~~~~~~~~~~~~~~~~~~...............|.............................................................
- Gameplay Story
5x Animation devs will work on 6 tasks (40% load) starting 2022-06-05 thru 2022-06-30
5x Animation devs will work on 6 tasks (40% load) starting 2022-06-05 thru 2022-06-30
..................~~~~~.......~~~~~~~~....|...~~~~~~~~..................................................
Chapter 26
- SQ42 Art
9x Art devs working on 32 tasks (22% load) thru 2022-06-30
9x Art devs working on 32 tasks (22% load) thru 2022-06-30
.=========================================|===========..................................................
- SQ42 Level Design 1 - FPS
7x Design devs working on 3 tasks (18% load) thru 2022-06-30
7x Design devs working on 3 tasks (18% load) thru 2022-06-30
.===========================..............|===========..................................................
Character Work
- AI Content Team
4x Animation devs working on 5 tasks (31% load) thru 2022-06-09
3x Design devs will work on 2 tasks (101% load) starting 2022-05-29 thru 2022-06-09
4x Animation devs working on 5 tasks (31% load) thru 2022-06-09
3x Design devs will work on 2 tasks (101% load) starting 2022-05-29 thru 2022-06-09
..======================....==============|=====........................................................
..................======..................|.====........................................................
- AI Tech and Feature Team
4x Engineering devs working on 6 tasks (39% load) thru 2022-05-26
4x Engineering devs working on 6 tasks (39% load) thru 2022-05-26
..==========................========......|.............................................................
..============~~~~~~........============~~|~............................................................
- Audio
5x Audio devs working on 9 tasks (50% load) thru 2022-06-30
5x Audio devs working on 9 tasks (50% load) thru 2022-06-30
....================................======|===========..................................................
- Character Tech Art
7x Tech Content devs working on 13 tasks (20% load) thru 2022-06-16
7x Tech Content devs working on 13 tasks (20% load) thru 2022-06-16
......====================================|=======......................................................
- Facial Animation
6x Animation devs working on 16 tasks (27% load) thru 2022-06-30
6x Animation devs working on 16 tasks (27% load) thru 2022-06-30
....======================================|===========..................................................
- SQ42 Character Art
9x Art devs working on 41 tasks (29% load) thru 2022-06-16
9x Art devs working on 41 tasks (29% load) thru 2022-06-16
.=========================================|=======......................................................
- Tech Animation Team
8x Tech Content devs working on 10 tasks (69% load) thru 2022-06-20
8x Tech Content devs working on 10 tasks (69% load) thru 2022-06-20
..........~~~~~~~~~~~~~~~~~...=========...|========.....................................................
- Weapon Content Team
2x Art devs will work on 7 tasks (530% load) starting 2022-05-29 thru 2022-06-09
2x Art devs will work on 7 tasks (530% load) starting 2022-05-29 thru 2022-06-09
................................======....|.====........................................................
Charge/Drain T0
- Weapon Feature Team
1x Engineering dev working on 6 tasks (89% load) thru 2022-08-17
1x Engineering dev working on 6 tasks (89% load) thru 2022-08-17
........................................==|=====~~~~~~~~~~==========....................................
Chemline
- SQ42 Art
6x Art devs working on 37 tasks (18% load) thru 2022-06-30
6x Art devs working on 37 tasks (18% load) thru 2022-06-30
.=========================================|===========..................................................
Commodity Kiosk
- US PU Gameplay Feature Team
3x Art devs working on 5 tasks (37% load) thru 2022-06-02
3x Art devs working on 5 tasks (37% load) thru 2022-06-02
..~~~~~~~~~~~~~~~~~.......................|.............................................................
..=================.......================|===........================..................................
Datacore Deserializer
- Systemic Services and Tools Team
1x Engineering dev working on 9 tasks (231% load) thru 2022-06-02
1x Engineering dev working on 9 tasks (231% load) thru 2022-06-02
..........................================|===........................======............................
Derelict Spaceships - Points of Interest
- MTL Sandbox 1
8x Art devs working on 12 tasks (4% load) thru 2022-06-02
4x Design devs working on 8 tasks (5% load) thru 2022-06-02
8x Art devs working on 12 tasks (4% load) thru 2022-06-02
4x Design devs working on 8 tasks (5% load) thru 2022-06-02
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~========|===........======================..======================....
.~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~========|===........======================..======================....
DGS Crash Recovery
- Network Team
1x Engineering dev working on 10 tasks (138% load) thru 2022-06-30
1x Engineering dev working on 10 tasks (138% load) thru 2022-06-30
..................========================|===========..................................................
DGS Mesh Node
- Network Team
3x Engineering devs working on 10 tasks (46% load) thru 2022-06-30
3x Engineering devs working on 10 tasks (46% load) thru 2022-06-30
..................========================|===========..................................................
Drake Corsair
- Vehicle Content - US
3x Tech Content devs working on 2 tasks (51% load) thru 2022-05-26
5x Art devs working on 15 tasks (62% load) thru 2022-06-23
2x Design devs working on 7 tasks (72% load) thru 2022-06-23
3x Tech Content devs working on 2 tasks (51% load) thru 2022-05-26
5x Art devs working on 15 tasks (62% load) thru 2022-06-23
2x Design devs working on 7 tasks (72% load) thru 2022-06-23
........................................~~|~..........~~~~~~~~~~~~~~....................................
..======================....==============|=========..======............................................
..======================....==============|=========..==========........................................
Drake Mule
- Narrative
2x Design devs working on 1 task (76% load) thru 2022-05-26
2x Design devs working on 1 task (76% load) thru 2022-05-26
....~~~~................................==|=............................................................
- Vehicle Content - EU
3x Design devs working on 23 tasks (62% load) thru 2022-06-16
3x Design devs working on 23 tasks (62% load) thru 2022-06-16
..==============================..........|.............................................................
....~~======================~~~~~~~~~~~~~~|~~~~~~~......................................................
Drake Vulture
- Vehicle Content - US
1x Design dev working on 3 tasks (128% load) thru 2022-05-26
1x Design dev working on 3 tasks (128% load) thru 2022-05-26
..==========..............................|.............................................................
............========............==========|=............................................................
Dynamic Events
- Mission Feature Team
7x Design devs working on 41 tasks (59% load) thru 2022-06-16
7x Design devs working on 41 tasks (59% load) thru 2022-06-16
..========================================|=======..====~~~~~~~~~~~~~~~~~~~~============================
..========================................|.................................============================
- US PU Gameplay Feature Team
2x Design devs working on 18 tasks (112% load) thru 2022-06-02
2x Design devs working on 18 tasks (112% load) thru 2022-06-02
..~~~~~~~~~~~~~~~~~.......~~~~~~~~~~~~~~~~|~~~........================..................................
Dynamic Mission System
- Mission Feature Team
1x Engineering dev working on 11 tasks (113% load) thru 2022-06-16
1x Engineering dev working on 11 tasks (113% load) thru 2022-06-16
..........................~~~~~~~~~~~~~~~~|~~~~~~~..~~~~~~~~~~~~~~~~~~~~~~~~~~..........................
Dynamic Population
- Mission Feature Team
1x Engineering dev working on 8 tasks (163% load) thru 2022-06-16
1x Engineering dev working on 8 tasks (163% load) thru 2022-06-16
....................................~~~~~~|~~~~~~~..==========..........................................
- Systemic Services and Tools Team
2x Engineering devs working on 10 tasks (105% load) thru 2022-06-16
2x Engineering devs working on 10 tasks (105% load) thru 2022-06-16
..........................================|=======......................................................
ECUS Improvements
(Scheduled work ending soon!)
- Engine Team
2x Engineering devs working on 6 tasks (47% load) thru 2022-05-26
2x Engineering devs working on 6 tasks (47% load) thru 2022-05-26
..~~~~~~~~~~~~~~~~~.........~~~~~~~~~~~~~~|~............................................................
Enemy Characters
- AI Tech and Feature Team
1x Animation dev working on 4 tasks (126% load) thru 2022-05-26
1x Engineering dev working on 3 tasks (128% load) thru 2022-05-26
1x Animation dev working on 4 tasks (126% load) thru 2022-05-26
1x Engineering dev working on 3 tasks (128% load) thru 2022-05-26
..==================........==============|=............................................................
......==============............==========|=............................................................
- SQ42 Character Art
4x Art devs working on 14 tasks (35% load) thru 2022-06-16
4x Art devs working on 14 tasks (35% load) thru 2022-06-16
..========================================|=======......................................................
EVA T2
- Actor Feature Team
2x Animation devs working on 17 tasks (38% load) thru 2022-07-07
2x Animation devs working on 17 tasks (38% load) thru 2022-07-07
..~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~................................................
- Actor Tech Team
2x Engineering devs working on 8 tasks (70% load) thru 2022-07-07
2x Engineering devs working on 8 tasks (70% load) thru 2022-07-07
............................==============|=============................................................
- Narrative
1x Design dev will work on 3 tasks (227% load) starting 2022-05-29 thru 2022-06-09
1x Design dev will work on 3 tasks (227% load) starting 2022-05-29 thru 2022-06-09
..........................................|.~~~~........................................................
Fire Hazard
(Scheduled work ending soon!)
- VFX Team
2x Engineering devs working on 1 task (64% load) thru 2022-05-29
2x Engineering devs working on 1 task (64% load) thru 2022-05-29
........................................==|==...........................................................
FPS Devices T1
- Weapon Feature Team
1x Engineering dev working on 3 tasks (47% load) thru 2022-07-07
1x Engineering dev working on 3 tasks (47% load) thru 2022-07-07
..............==============............~~|~~~~~~~~~~~~~................................................
- Narrative
1x Design dev will work on 3 tasks (227% load) starting 2022-05-29 thru 2022-06-09
1x Design dev will work on 3 tasks (227% load) starting 2022-05-29 thru 2022-06-09
..........................................|.~~~~........................................................
FPS Radar / Scanning
- Actor Feature Team
2x Engineering devs working on 10 tasks (52% load) thru 2022-07-07
2x Engineering devs working on 10 tasks (52% load) thru 2022-07-07
..........================================|=====~~~~~~~~................................................
..~~~~~~~~~~~~~~~~~~~~~~~~~~..............|.............................................................
- Vehicle Feature Team
1x Design dev working on 3 tasks (122% load) thru 2022-06-23
1x Design dev working on 3 tasks (122% load) thru 2022-06-23
......................................====|=========....................................................
Frontier Clothing
- Character Tech Art
2x Tech Content devs working on 4 tasks (133% load) thru 2022-06-02
2x Tech Content devs working on 4 tasks (133% load) thru 2022-06-02
......................................====|===..........................................................
- SC Character Art
12x Art devs working on 26 tasks (14% load) thru 2022-06-16
12x Art devs working on 26 tasks (14% load) thru 2022-06-16
.=========================================|=======......................................................
Gainey
- SQ42 Art
4x Art devs working on 8 tasks (18% load) thru 2022-06-30
4x Art devs working on 8 tasks (18% load) thru 2022-06-30
..........................~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
Gen12 - Renderer T1
(Scheduled work ending soon!)
- Engine Team
2x Engineering devs working on 9 tasks (142% load) thru 2022-05-26
2x Engineering devs working on 9 tasks (142% load) thru 2022-05-26
..=================.........==============|=............................................................
- Graphics Team
7x Engineering devs working on 14 tasks (48% load) thru 2022-06-08
7x Engineering devs working on 14 tasks (48% load) thru 2022-06-08
..===================.....================|=====........................................................
Hacking T0
- Weapon Feature Team
1x Engineering dev working on 10 tasks (117% load) thru 2022-05-26
1x Engineering dev working on 10 tasks (117% load) thru 2022-05-26
..========================================|=............................................................
- Props Team
2x Art devs will work on 5 tasks (231% load) starting 2022-06-05 thru 2022-06-23
2x Art devs will work on 5 tasks (231% load) starting 2022-06-05 thru 2022-06-23
..........................................|...======....................................................
HEX
- Live Tools Team
5x Engineering devs working on 13 tasks (32% load) thru 2022-06-30
5x Engineering devs working on 13 tasks (32% load) thru 2022-06-30
..=====================...~~~~============|=====================================........................
Hospital Surgeon
(Scheduled work ending soon!)
- Character Tech Art
2x Tech Content devs working on 3 tasks (227% load) thru 2022-06-02
2x Tech Content devs working on 3 tasks (227% load) thru 2022-06-02
..............====............====........|===..........................................................
Jump Points
- Graphics Team
1x Engineering dev working on 4 tasks (97% load) thru 2022-06-08
1x Engineering dev working on 4 tasks (97% load) thru 2022-06-08
........=============.....================|=====........................................................
- EU Sandbox 1
1x Art dev will work on 2 tasks (152% load) starting 2022-06-05 thru 2022-06-27
1x Art dev will work on 2 tasks (152% load) starting 2022-06-05 thru 2022-06-27
..............~~~~~...................====|...=======...................................................
Ladders T1
- Actor Feature Team
2x Animation devs working on 11 tasks (92% load) thru 2022-07-07
2x Animation devs working on 11 tasks (92% load) thru 2022-07-07
............................==============|=====~~~~~~~~................................................
Lean Over Cover
- Actor Tech Team
1x Engineering dev working on 12 tasks (211% load) thru 2022-07-07
1x Engineering dev working on 12 tasks (211% load) thru 2022-07-07
............................==============|=============................................................
Login Flow
- Game Services Team
7x Engineering devs working on 59 tasks (78% load) thru 2022-06-30
7x Engineering devs working on 59 tasks (78% load) thru 2022-06-30
..====================~~~~~~~~============|===========..................................................
- Live Tools Team
2x Engineering devs working on 18 tasks (87% load) thru 2022-06-30
2x Engineering devs working on 18 tasks (87% load) thru 2022-06-30
......================~~~~~~~~============|===========..................................................
Long Term Persistence Enhancements
- Persistent Tech Team
1x Engineering dev working on 3 tasks (94% load) thru 2022-06-30
1x Engineering dev working on 3 tasks (94% load) thru 2022-06-30
......................................====|===========..................................................
Lorville Cityscape
- Location Concept Art
2x Art devs working on 11 tasks (96% load) thru 2022-06-30
2x Art devs working on 11 tasks (96% load) thru 2022-06-30
..=====...=============...================|===========..................................................
- Narrative
1x Design dev will work on 3 tasks (227% load) starting 2022-05-29 thru 2022-06-09
1x Design dev will work on 3 tasks (227% load) starting 2022-05-29 thru 2022-06-09
..........................................|.~~~~........................................................
Mantle T2
(Recently started!)
- Actor Feature Team
1x Engineering dev working on 5 tasks (142% load) thru 2022-07-07
1x Engineering dev working on 5 tasks (142% load) thru 2022-07-07
........................................==|=====~~~~~~~~................................................
Map and Radar System Rework
- SQ42 UI Feature Team
2x Engineering devs working on 8 tasks (76% load) thru 2022-07-07
2x Art devs working on 4 tasks (72% load) thru 2022-07-07
2x Engineering devs working on 8 tasks (76% load) thru 2022-07-07
2x Art devs working on 4 tasks (72% load) thru 2022-07-07
..............................============|=============................................................
..........................................|=============................................................
- UI Tech Team
2x Engineering devs working on 2 tasks (93% load) thru 2022-05-26
2x Engineering devs working on 2 tasks (93% load) thru 2022-05-26
......========........................====|=............................................................
MISC Hull C
- US PU Gameplay Feature Team
1x Engineering dev working on 6 tasks (124% load) thru 2022-06-02
1x Engineering dev working on 6 tasks (124% load) thru 2022-06-02
..........................================|===..........................................................
- Vehicle Content - EU
1x Design dev working on 11 tasks (162% load) thru 2022-06-16
1x Design dev working on 11 tasks (162% load) thru 2022-06-16
..............................~~~~~~~~~~~~|~~~~~~~......................................................
Miscellaneous Support
- Actor Feature Team
2x Design devs working on 25 tasks (55% load) thru 2022-12-30
1x Engineering dev working on 24 tasks (106% load) thru 2022-12-30
3x Animation devs working on 25 tasks (37% load) thru 2022-12-30
2x Design devs working on 25 tasks (55% load) thru 2022-12-30
1x Engineering dev working on 24 tasks (106% load) thru 2022-12-30
3x Animation devs working on 25 tasks (37% load) thru 2022-12-30
..========================================|=====~~~~~~~~~~==============================================
..========================================|=====~~~~~~~~~~==============================================
..========================================|=====~~~~~~~~~~==============================================
..==========================..............|.............................................................
- Actor Tech Team
5x Engineering devs working on 13 tasks (14% load) thru 2022-07-07
5x Engineering devs working on 13 tasks (14% load) thru 2022-07-07
..~~~~~~~~~~~~~~~~~~~~======~~~~~~~~~~~~~~|~~~~~~~~~~~~~................................................
- AI Content Team
2x Tech Content devs working on 6 tasks (44% load) thru 2022-06-09
2x Animation devs will work on 2 tasks (152% load) starting 2022-05-29 thru 2022-06-09
1x Design dev will work on 1 task (152% load) starting 2022-05-29 thru 2022-06-09
2x Tech Content devs working on 6 tasks (44% load) thru 2022-06-09
2x Animation devs will work on 2 tasks (152% load) starting 2022-05-29 thru 2022-06-09
1x Design dev will work on 1 task (152% load) starting 2022-05-29 thru 2022-06-09
..~~~~~~~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~|~~~~~........................................................
..................======..................|.====........................................................
- AI Tech and Feature Team
1x Tech Content dev working on 5 tasks (100% load) thru 2022-06-09
1x Tech Content dev working on 5 tasks (100% load) thru 2022-06-09
..~~~~~~~~====~~~~~~~~~~....~~~~~~~~======|=====........................................................
- Arena Commander Feature Team
2x Design devs working on 9 tasks (69% load) thru 2022-07-07
3x Engineering devs working on 13 tasks (40% load) thru 2022-07-07
2x Design devs working on 9 tasks (69% load) thru 2022-07-07
3x Engineering devs working on 13 tasks (40% load) thru 2022-07-07
........................==================|=============................................................
....====================~~~~==============|=============................................................
- Gameplay Story
1x Tech Content dev working on 2 tasks (85% load) thru 2022-06-30
1x Tech Content dev working on 2 tasks (85% load) thru 2022-06-30
.=====.===============~~~~~~..====........|===========..................................................
- Graphics Team
3x Engineering devs working on 3 tasks (24% load) thru 2022-06-08
3x Engineering devs working on 3 tasks (24% load) thru 2022-06-08
..............=======.....================|=====........................................................
..===================.....................|.............................................................
- Lighting Team
9x Art devs working on 11 tasks (12% load) thru 2022-06-30
9x Art devs working on 11 tasks (12% load) thru 2022-06-30
......====================================|===========..................................................
- Motion Capture Team
5x Animation devs working on 13 tasks (23% load) thru 2022-06-30
5x Animation devs working on 13 tasks (23% load) thru 2022-06-30
..========================================|~~~~~~~~~~~..................................................
- Props Team
2x Tech Content devs working on 2 tasks (417% load) thru 2022-05-26
12x Art devs working on 9 tasks (313% load) thru 2022-05-26
2x Tech Content devs working on 2 tasks (417% load) thru 2022-05-26
12x Art devs working on 9 tasks (313% load) thru 2022-05-26
..==================..========............|=............................................................
..==================..======..............|=............................................................
- SQ42 Feature Team
2x Engineering devs working on 13 tasks (42% load) thru 2022-06-30
2x Engineering devs working on 13 tasks (42% load) thru 2022-06-30
..~~~~~~~~~~~~~~~~~~~~~~~~~~~~============|===========..................................................
- UI Tech Team
3x Engineering devs working on 8 tasks (51% load) thru 2022-07-07
3x Engineering devs working on 8 tasks (51% load) thru 2022-07-07
..............................============|=============................................................
- Vehicle Content - EU
4x Design devs working on 9 tasks (63% load) thru 2022-06-16
4x Design devs working on 9 tasks (63% load) thru 2022-06-16
..======........................==========|=======......................................................
- Vehicle Feature Team
11x Engineering devs working on 9 tasks (11% load) thru 2022-06-23
3x Design devs working on 6 tasks (48% load) thru 2022-06-23
11x Engineering devs working on 9 tasks (11% load) thru 2022-06-23
3x Design devs working on 6 tasks (48% load) thru 2022-06-23
..............============================|=========......======================..======================
..............................============|=========..........==================..======..........======
- VFX Team
2x Tech Content devs working on 5 tasks (49% load) thru 2022-05-29
3x Engineering devs working on 1 task (43% load) thru 2022-05-29
2x Tech Content devs working on 5 tasks (49% load) thru 2022-05-29
3x Engineering devs working on 1 task (43% load) thru 2022-05-29
......................====================|==...........................................................
......................~~~~~~~~~~=====.....|.............................................................
........................................==|==...........................................................
- Weapon Feature Team
5x Design devs working on 28 tasks (25% load) thru 2022-12-30
5x Design devs working on 28 tasks (25% load) thru 2022-12-30
..========================================|=====~~~~~~~~~~==============================================
..........................................|.......................==============........................
- Planet Tech Team
4x Engineering devs will work on 1 task (32% load) starting 2022-06-08 thru 2022-06-21
4x Engineering devs will work on 1 task (32% load) starting 2022-06-08 thru 2022-06-21
..........................................|...=====...............................................======
Mission Manager App
- US PU Gameplay Feature Team
1x Art dev working on 2 tasks (133% load) thru 2022-06-02
1x Art dev working on 2 tasks (133% load) thru 2022-06-02
......................................====|===........================..................................
mobiGlas Rework
- SQ42 UI Feature Team
1x Design dev working on 4 tasks (145% load) thru 2022-07-07
1x Engineering dev working on 2 tasks (185% load) thru 2022-05-26
1x Design dev working on 4 tasks (145% load) thru 2022-07-07
1x Engineering dev working on 2 tasks (185% load) thru 2022-05-26
..........................................|=============................................................
......................................====|=............................................................
NPC Scheduler Service
- Systemic Services and Tools Team
2x Engineering devs working on 6 tasks (200% load) thru 2022-06-02
2x Engineering devs working on 6 tasks (200% load) thru 2022-06-02
......................................====|===................==========................................
Outpost Homestead - Independent & Outlaw
- Lighting Team
6x Art devs working on 8 tasks (42% load) thru 2022-06-30
6x Art devs working on 8 tasks (42% load) thru 2022-06-30
..............=========...............====|===========..................................................
- Narrative
2x Design devs working on 3 tasks (114% load) thru 2022-05-26
2x Design devs working on 3 tasks (114% load) thru 2022-05-26
............====........................~~|~............................................................
- EU Sandbox 1
10x Art devs will work on 20 tasks (36% load) starting 2022-06-05 thru 2022-09-06
4x Design devs will work on 3 tasks (57% load) starting 2022-06-05 thru 2022-06-27
10x Art devs will work on 20 tasks (36% load) starting 2022-06-05 thru 2022-09-06
4x Design devs will work on 3 tasks (57% load) starting 2022-06-05 thru 2022-06-27
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========|...===========================...............................
.~~~~~~~~~~.~~~~~~~~~~~~~~~.~~~~~~========|...=======.......=====...=====...............................
- Props Team
13x Art devs will work on 21 tasks (673% load) starting 2022-06-05 thru 2022-06-09
13x Art devs will work on 21 tasks (673% load) starting 2022-06-05 thru 2022-06-09
..================....======..====..======|...==........................................................
Persistent Hangars
- US PU Gameplay Feature Team
3x Engineering devs working on 6 tasks (25% load) thru 2022-06-02
4x Design devs working on 10 tasks (31% load) thru 2022-06-02
3x Engineering devs working on 6 tasks (25% load) thru 2022-06-02
4x Design devs working on 10 tasks (31% load) thru 2022-06-02
..........................~~~~~~~~~~~~~~~~|~~~........================........================..........
..........................~~~~~~~~~~~~~~~~|~~~........================........================..........
..........................................|...................................================..........
Persistent Streaming and Server Meshing
- Game Services Team
10x Engineering devs working on 13 tasks (11% load) thru 2022-06-30
10x Engineering devs working on 13 tasks (11% load) thru 2022-06-30
..====================~~~~~~~~============|=====================================........................
- Mission Feature Team
3x Engineering devs working on 16 tasks (34% load) thru 2022-06-16
3x Engineering devs working on 16 tasks (34% load) thru 2022-06-16
.~========================~~~~~~~~~~~~~~~~|~~~~~~~..~~~~~~~~~~~~~~~~~~~~~~~~============================
- Persistent Tech Team
4x Engineering devs working on 19 tasks (42% load) thru 2022-06-30
4x Engineering devs working on 19 tasks (42% load) thru 2022-06-30
..====================~~~~~~~~============|=============================================================
- SQ42 UI Feature Team
2x Engineering devs working on 4 tasks (104% load) thru 2022-05-26
2x Engineering devs working on 4 tasks (104% load) thru 2022-05-26
..................................========|=............................................................
- US PU Gameplay Feature Team
4x Engineering devs working on 3 tasks (32% load) thru 2022-06-02
4x Engineering devs working on 3 tasks (32% load) thru 2022-06-02
..................................========|===........================..................................
- Network Team
9x Engineering devs will work on 2 tasks (15% load) starting 2022-06-05 thru 2022-06-30
9x Engineering devs will work on 2 tasks (15% load) starting 2022-06-05 thru 2022-06-30
..=====.......============................|...==========================================================
Personal Inventory
(Scheduled work ending soon!)
- Actor Feature Team
1x Engineering dev working on 6 tasks (189% load) thru 2022-05-26
1x Engineering dev working on 6 tasks (189% load) thru 2022-05-26
..~~~~~~~~~~~~~~~~~~~~~~~~~~..............|.............................................................
............................==============|=............................................................
Physical Damage & Breakability
(Scheduled work ending soon!)
- Physics Team
3x Engineering devs working on 8 tasks (64% load) thru 2022-06-08
3x Engineering devs working on 8 tasks (64% load) thru 2022-06-08
..===================.....================|=====........................................................
Physics - Ropes Simulation
(Scheduled work ending soon!)
- Physics Team
1x Engineering dev working on 5 tasks (121% load) thru 2022-06-08
1x Engineering dev working on 5 tasks (121% load) thru 2022-06-08
..===================.....================|=====........................................................
Player Interaction Experience T1 - Lockers & Inventory
- Actor Feature Team
1x Art dev working on 14 tasks (122% load) thru 2022-09-28
1x Design dev working on 14 tasks (66% load) thru 2022-09-28
1x Art dev working on 14 tasks (122% load) thru 2022-09-28
1x Design dev working on 14 tasks (66% load) thru 2022-09-28
............................==============|=====~~~~~~~~~~======================........................
..........................................|...........==========================........................
............................~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~........................
Player Interaction Experience T2 - Visor HUD & Helmet
- Actor Feature Team
1x Design dev working on 14 tasks (66% load) thru 2022-09-28
1x Design dev working on 14 tasks (66% load) thru 2022-09-28
..........................................|...........==========================........................
............................~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~........................
..............==============..............|.............................................................
Player Reflection
- Actor Tech Team
1x Engineering dev working on 12 tasks (105% load) thru 2022-07-07
1x Engineering dev working on 12 tasks (105% load) thru 2022-07-07
............................~~~~~~~~~~~~~~|~~~~~~~~~~~~~................................................
Pyro Space Stations
- Narrative
2x Design devs working on 3 tasks (114% load) thru 2022-05-26
2x Design devs working on 3 tasks (114% load) thru 2022-05-26
........................................~~|~............................................................
- EU Landing Zone Team
13x Art devs will work on 12 tasks (62% load) starting 2022-06-05 thru 2022-06-30
3x Design devs will work on 3 tasks (67% load) starting 2022-06-05 thru 2022-06-30
13x Art devs will work on 12 tasks (62% load) starting 2022-06-05 thru 2022-06-30
3x Design devs will work on 3 tasks (67% load) starting 2022-06-05 thru 2022-06-30
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========|...==========================..======..=================.....
.~~~~~~~~~~~~~~.~~~~~~~~~~~.~~~~~~========|...==========================..======..=================.....
Pyro System, Planet, and Mission Setup
- Narrative
4x Design devs working on 4 tasks (33% load) thru 2022-05-26
4x Design devs working on 4 tasks (33% load) thru 2022-05-26
........========............====....~~~~~~|~............................................................
- US PU Gameplay Feature Team
1x Design dev working on 6 tasks (400% load) thru 2022-06-02
1x Design dev working on 6 tasks (400% load) thru 2022-06-02
......................................====|===........================..................................
Quantum Simulation
- Systemic Services and Tools Team
5x Engineering devs working on 55 tasks (31% load) thru 2022-06-16
5x Engineering devs working on 55 tasks (31% load) thru 2022-06-16
.=========================================|=======....================================================..
Quantum Travel Experience
- VFX Team
1x Art dev working on 2 tasks (123% load) thru 2022-05-29
1x Art dev working on 2 tasks (123% load) thru 2022-05-29
....................................======|==...........................................................
Replication Layer Entity Authority
(Scheduled work ending soon!)
- Network Team
6x Engineering devs working on 7 tasks (29% load) thru 2022-06-02
6x Engineering devs working on 7 tasks (29% load) thru 2022-06-02
..=========...=====.......================|===..........................................................
Rescue/Transport Mission
- Mission Feature Team
1x Design dev working on 12 tasks (109% load) thru 2022-06-16
2x Engineering devs working on 8 tasks (67% load) thru 2022-06-16
1x Design dev working on 12 tasks (109% load) thru 2022-06-16
2x Engineering devs working on 8 tasks (67% load) thru 2022-06-16
..........~~~~~~~~~~~~~~~~================|=======......................................................
..........................==========~~~~~~|~~~~~~~......................................................
Resource Management
- Vehicle Feature Team
2x Engineering devs working on 4 tasks (81% load) thru 2022-06-23
2x Engineering devs working on 4 tasks (81% load) thru 2022-06-23
......................................====|=========......==========....................................
- EU PU Gameplay Feature Team
2x Engineering devs will work on 5 tasks (321% load) starting 2022-06-08 thru 2022-06-21
2x Design devs will work on 5 tasks (160% load) starting 2022-06-08 thru 2022-06-21
2x Engineering devs will work on 5 tasks (321% load) starting 2022-06-08 thru 2022-06-21
2x Design devs will work on 5 tasks (160% load) starting 2022-06-08 thru 2022-06-21
..........~~~~~~~~~.......================|...=====...=========================================...=====.
..........................~~~~~~~~~~~~~~~~|...~~~~~...~~~~~~~~~~~~~~~~~~..~~~~~~~~~~~~~~~~~~~~~...~~~~~.
Salvage T0
- Vehicle Content - US
1x Tech Content dev working on 2 tasks (303% load) thru 2022-05-26
1x Tech Content dev working on 2 tasks (303% load) thru 2022-05-26
........................................==|=............................................................
- EU PU Gameplay Feature Team
1x Engineering dev will work on 2 tasks (256% load) starting 2022-06-08 thru 2022-06-21
1x Engineering dev will work on 2 tasks (256% load) starting 2022-06-08 thru 2022-06-21
..........................================|...=====.....................................................
Satellites - Points of Interest
- Location Concept Art
2x Art devs working on 3 tasks (47% load) thru 2022-06-30
2x Art devs working on 3 tasks (47% load) thru 2022-06-30
......................................====|===========........................==========================
Ship CPU
- Audio
1x Audio dev working on 3 tasks (278% load) thru 2022-06-02
1x Audio dev working on 3 tasks (278% load) thru 2022-06-02
........................................==|===..........................................................
Space Mines
(Recently started!)
- Weapon Feature Team
1x Engineering dev working on 3 tasks (47% load) thru 2022-07-07
1x Engineering dev working on 3 tasks (47% load) thru 2022-07-07
........................................~~|~~~~~~~~~~~~~................................................
- Narrative
1x Design dev will work on 1 task (76% load) starting 2022-05-29 thru 2022-06-09
1x Design dev will work on 1 task (76% load) starting 2022-05-29 thru 2022-06-09
..........................................|.~~~~........................................................
SQ42 - Vehicle Support
- Vehicle Feature Team
3x Engineering devs working on 2 tasks (85% load) thru 2022-05-26
3x Engineering devs working on 2 tasks (85% load) thru 2022-05-26
..........................======......====|=............................................................
Stanton Fashion Clothing
(Scheduled work ending soon!)
- SC Character Art
2x Art devs working on 3 tasks (227% load) thru 2022-06-02
2x Art devs working on 3 tasks (227% load) thru 2022-06-02
..............................====........|===..........................................................
Subsumption Editor Integration
(Scheduled work ending soon!)
- AI Tech and Feature Team
1x Engineering dev working on 5 tasks (124% load) thru 2022-06-09
1x Engineering dev working on 5 tasks (124% load) thru 2022-06-09
..======================....==============|=====........................................................
Theaters of War - Miscellaneous Support
- Firesprite Team
4x Art devs working on 13 tasks (6% load) thru 2022-06-30
2x Engineering devs working on 6 tasks (5% load) thru 2022-06-30
4x Design devs working on 13 tasks (7% load) thru 2022-06-30
4x Art devs working on 13 tasks (6% load) thru 2022-06-30
2x Engineering devs working on 6 tasks (5% load) thru 2022-06-30
4x Design devs working on 13 tasks (7% load) thru 2022-06-30
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~========|===========..................................................
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~..................................................
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~========|===========..................................................
Turret Usability Improvements
(Scheduled work ending soon!)
- Vehicle Feature Team
1x Engineering dev working on 3 tasks (185% load) thru 2022-05-26
1x Engineering dev working on 3 tasks (185% load) thru 2022-05-26
..................................========|=............................................................
Unannounced Vehicle
- Audio
2x Audio devs working on 4 tasks (133% load) thru 2022-06-02
2x Audio devs working on 4 tasks (133% load) thru 2022-06-02
......................................====|===..........................................................
- Vehicle Content - EU
2x Design devs working on 20 tasks (64% load) thru 2022-06-16
2x Design devs working on 20 tasks (64% load) thru 2022-06-16
..==========================..............|.............................................................
............~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~......................................................
- Vehicle Content - US
2x Tech Content devs working on 5 tasks (55% load) thru 2022-05-26
2x Tech Content devs working on 5 tasks (55% load) thru 2022-05-26
............................~~~~~~~~======|=............................................................
- VFX Team
1x Art dev working on 2 tasks (62% load) thru 2022-05-29
1x Art dev working on 2 tasks (62% load) thru 2022-05-29
....................................~~~~~~|~~...........................................................
- Narrative
1x Design dev will work on 2 tasks (303% load) starting 2022-05-29 thru 2022-06-09
1x Design dev will work on 2 tasks (303% load) starting 2022-05-29 thru 2022-06-09
..........................................|.====........................................................
Unannounced Vehicle
- Vehicle Content - EU
3x Art devs working on 32 tasks (89% load) thru 2022-10-20
2x Design devs working on 12 tasks (68% load) thru 2022-06-16
3x Art devs working on 32 tasks (89% load) thru 2022-10-20
2x Design devs working on 12 tasks (68% load) thru 2022-06-16
............................==============|===========================================..................
............................~~~~~~~~~~~~~~|~~~~~~~....======================....~~~~~~~~~~~~~~..........
Unannounced Vehicle
- Vehicle Content - EU
2x Art devs working on 23 tasks (127% load) thru 2022-06-09
1x Design dev working on 20 tasks (199% load) thru 2022-06-16
2x Art devs working on 23 tasks (127% load) thru 2022-06-09
1x Design dev working on 20 tasks (199% load) thru 2022-06-16
....======================================|=====........................................................
............~~~~~~~~~~~~~~~~==============|=======......................................................
- Vehicle Content - US
1x Tech Content dev working on 2 tasks (152% load) thru 2022-05-26
1x Tech Content dev working on 2 tasks (152% load) thru 2022-05-26
............................~~~~........~~|~............................................................
Underground Facilities
- Location Concept Art
4x Art devs working on 24 tasks (105% load) thru 2022-06-30
4x Art devs working on 24 tasks (105% load) thru 2022-06-30
..=====================...================|===========..................................................
VisArea Improvements
(Scheduled work ending soon!)
- Engine Team
1x Engineering dev working on 6 tasks (94% load) thru 2022-05-26
1x Engineering dev working on 6 tasks (94% load) thru 2022-05-26
..~~~~~~~~~~~~~~~~~.........~~~~~~~~~~~~~~|~............................................................
Visor/Lens Rework
- SQ42 UI Feature Team
1x Art dev working on 2 tasks (185% load) thru 2022-06-09
1x Engineering dev will work on 2 tasks (128% load) starting 2022-05-29 thru 2022-06-24
1x Art dev working on 2 tasks (185% load) thru 2022-06-09
1x Engineering dev will work on 2 tasks (128% load) starting 2022-05-29 thru 2022-06-24
..........................................|=====........................................................
..............................====........|.========....................................................
Zero G Push & Pull
- Actor Feature Team
2x Animation devs working on 13 tasks (29% load) thru 2022-07-07
2x Animation devs working on 13 tasks (29% load) thru 2022-07-07
..~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~................................................
The following deliverables are scheduled to begin (or continue) work within two weeks
Bounty Hunter V2
- Narrative
1x Design dev will work on 3 tasks (227% load) starting 2022-05-29 thru 2022-06-09
1x Design dev will work on 3 tasks (227% load) starting 2022-05-29 thru 2022-06-09
..........................................|.~~~~........................................................
Chapter 04
- Gameplay Story
5x Animation devs will work on 6 tasks (40% load) starting 2022-06-05 thru 2022-06-30
5x Animation devs will work on 6 tasks (40% load) starting 2022-06-05 thru 2022-06-30
.......~~~~...........................~~~~|...~~~~~~~~..................................................
Chapter 18
- Gameplay Story
4x Animation devs will work on 6 tasks (50% load) starting 2022-06-05 thru 2022-06-30
4x Animation devs will work on 6 tasks (50% load) starting 2022-06-05 thru 2022-06-30
..............~~~~~.......................|...~~~~~~~~..................................................
Chapter 25
- Cinematics Team
1x Design dev will work on 3 tasks (125% load) starting 2022-06-09 thru 2022-06-29
1x Design dev will work on 3 tasks (125% load) starting 2022-06-09 thru 2022-06-29
..........................~~~~~~~~........|...~~~~~~~~..................................................
Life Support T0
- EU PU Gameplay Feature Team
1x Design dev will work on 3 tasks (192% load) starting 2022-06-08 thru 2022-06-21
1x Design dev will work on 3 tasks (192% load) starting 2022-06-08 thru 2022-06-21
..~~~~~~~~~~~~~~~~~...~~~~~~~~~~~~~~~~~~~~|...~~~~~...~~~~~~~~~~~~~~~~~~..~~~~~~~~~~~~~~~~~~~~~...~~~~~.
Lockable Containers
- EU PU Gameplay Feature Team
1x Design dev will work on 5 tasks (641% load) starting 2022-06-08 thru 2022-06-21
1x Design dev will work on 5 tasks (641% load) starting 2022-06-08 thru 2022-06-21
..........................=====.......====|...=====.....................................................
Name Resolving API
- Persistent Tech Team
1x Engineering dev will work on 3 tasks (200% load) starting 2022-06-05 thru 2022-06-30
1x Engineering dev will work on 3 tasks (200% load) starting 2022-06-05 thru 2022-06-30
..........=========.......................|...========..................................................
Ocean Shader Improvements
(Starting soon!)
- Planet Tech Team
1x Engineering dev will work on 2 tasks (123% load) starting 2022-05-25 thru 2022-06-21
1x Engineering dev will work on 2 tasks (123% load) starting 2022-05-25 thru 2022-06-21
..........................................|========...=====================...=============.............
Outpost Theme Variants
- EU Sandbox 1
7x Art devs will work on 11 tasks (28% load) starting 2022-06-05 thru 2022-09-06
4x Design devs will work on 8 tasks (65% load) starting 2022-06-05 thru 2022-07-26
7x Art devs will work on 11 tasks (28% load) starting 2022-06-05 thru 2022-09-06
4x Design devs will work on 8 tasks (65% load) starting 2022-06-05 thru 2022-07-26
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~========|...===========================...=================...=======.
.~~~~~~~~~~~~~~.~~~~~~~~~~~~~~~~~~========|...===============...=============================...=======.
Player Interaction Experience T0 - Hints & Interactions
- Actor Feature Team
2x Engineering devs will work on 5 tasks (42% load) starting 2022-05-29 thru 2022-08-17
2x Engineering devs will work on 5 tasks (42% load) starting 2022-05-29 thru 2022-08-17
..........................................|.~~~~~~~~~~~~~~==========....................................
RSI Scorpius
- Vehicle Content - US
2x Tech Content devs will work on 3 tasks (100% load) starting 2022-05-29 thru 2022-06-23
2x Tech Content devs will work on 3 tasks (100% load) starting 2022-05-29 thru 2022-06-23
..==........................~~~~..........|.========....................................................
Shops and Patrons
- Facial Animation
4x Animation devs will work on 3 tasks (50% load) starting 2022-06-05 thru 2022-06-30
4x Animation devs will work on 3 tasks (50% load) starting 2022-06-05 thru 2022-06-30
..====....................============....|...========..................................................
Weapon Misfire & Wear
- Weapon Feature Team
1x Engineering dev will work on 5 tasks (83% load) starting 2022-05-29 thru 2022-08-17
1x Engineering dev will work on 5 tasks (83% load) starting 2022-05-29 thru 2022-08-17
..........................................|.~~~~~~~~~~~~~~==========....................................