Scheduled Deliverables
as of 2023-10-04
There are currently 65 scheduled deliverables being worked on by 28 teams
1 deliverables are scheduled to begin work by 1 team(s) within two weeks
This report lists the actively assigned deliverables and the associated teams, along with the number of developers assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.
The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.
The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.
extra analysis (click me)
There are approximately 241 devs (out of ~512, or 47%) with 495 assignments scheduled to work on 65 observable deliverables. Of those deliverables, 37% are for SQ42 exclusively, with ~205 devs (40%) scheduled for approximately 3791 man-days. 22% of deliverables are shared between both projects.
39 deliverable(s) are not currently scheduled to continue work after this sprint:
- Actor Status T2
- Chapter 02
- Chapter 04
- Chapter 05
- Chapter 07
- Chapter 10
- Chapter 11
- Chapter 12
- Chapter 13
- Chapter 14
- Chapter 16
- Chapter 17
- Chapter 18
- Chapter 19
- Chapter 20
- Chapter 21
- Chapter 22
- Chapter 23
- Chapter 24
- Chapter 25
- Chapter 26
- Chapter 27
- Character Creator
- Character Work
- Cutting T2
- Disarray Ammunition
- Distortion Propagation
- Headhunters Faction Outfits
- Incendiary Ammunition
- Map and Radar System Rework
- mobiGlas Rework
- Plasma Ammunition
- Player Interaction Experience T2 - Visor HUD & Helmet
- Sliding
- Subsumption Editor Integration
- Swimming T0
- Unannounced Vehicle
- Unannounced Vehicle
- Weapon Misfire & Wear
- Actor Feature Team
full-time with 100 task(s) scheduled, 50% of which are for SQ42 - Actor Tech Team
full-time with 30 task(s) scheduled, 50% of which are for SQ42 - AI Content Team
36% part-time with 119 task(s) scheduled, 71% of which are for SQ42 - AI Tech and Feature Team
25% part-time with 134 task(s) scheduled, 75% of which are for SQ42 - Character Tech Art
full-time with 53 task(s) scheduled, all of which are for SQ42 - EU Landing Zone 1
full-time with 76 task(s) scheduled, all of which are for SC - EU Landing Zone 2
full-time with 65 task(s) scheduled, all of which are for SC - EU PU Gameplay Feature Team
44% part-time with 70 task(s) scheduled, all of which are for SC - EU Sandbox 1
full-time with 75 task(s) scheduled, all of which are for SC - Mission Feature Team
full-time with 86 task(s) scheduled, all of which are for SC - MTL Sandbox 1
7% part-time with 244 task(s) scheduled, all of which are for SC - SC Character Art
full-time with 45 task(s) scheduled, 50% of which are for SQ42 - SQ42 Art
15% part-time with 137 task(s) scheduled, all of which are for SQ42 - SQ42 Character Art
9% part-time with 54 task(s) scheduled, all of which are for SQ42 - SQ42 Feature Team
full-time with 28 task(s) scheduled, 60% of which are for SQ42 - SQ42 Level Design 1 - FPS
full-time with 90 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 2 - Flight
40% part-time with 63 task(s) scheduled, all of which are for SQ42 - SQ42 Level Design 3 - Social
full-time with 41 task(s) scheduled, all of which are for SQ42 - SQ42 UI Feature Team
24% part-time with 71 task(s) scheduled, 60% of which are for SQ42 - Vehicle Content - EU
full-time with 88 task(s) scheduled, 44% of which are for SQ42 - Vehicle Content - MTL
26% part-time with 54 task(s) scheduled, all of which are for SC - Vehicle Content - US
44% part-time with 9 task(s) scheduled, all of which are for SC - Weapon Feature Team
32% part-time with 136 task(s) scheduled, 42% of which are for SQ42
Actor Status T2
(Scheduled work ending soon!)
- Actor Feature Team
2x Engineering devs working on 15 tasks (118% load) thru 2023-10-14
2x Engineering devs working on 15 tasks (118% load) thru 2023-10-14
........................~~~~====================..======.=====================|=====....................
Additional Derelict Settlements
- EU Sandbox 1
3x Art devs working on 25 tasks (201% load) thru 2023-11-05
3x Art devs working on 25 tasks (201% load) thru 2023-11-05
................................................~~~~=============...==========|==========...========....
- MTL Sandbox 1
2x Design devs working on 37 tasks (87% load) thru 2023-12-14
3x Art devs working on 44 tasks (65% load) thru 2023-12-14
2x Design devs working on 37 tasks (87% load) thru 2023-12-14
3x Art devs working on 44 tasks (65% load) thru 2023-12-14
==============================.===============~~~~~~==========================|=====================....
==============================.===============~~~~~~==========================|=====================....
Artificial Gravity
- EU PU Gameplay Feature Team
1x Engineering dev working on 9 tasks (242% load) thru 2023-10-22
1x Engineering dev working on 9 tasks (242% load) thru 2023-10-22
....................................................~~~~~~~~~~~~~.........~~~~|~~~~~~...................
Bounty Hunter V2
- EU Landing Zone 2
3x Art devs working on 39 tasks (63% load) thru 2023-12-14
3x Art devs working on 39 tasks (63% load) thru 2023-12-14
==============================================================================|=====================....
- Mission Feature Team
2x Engineering devs working on 13 tasks (241% load) thru 2023-11-05
7x Design devs working on 22 tasks (116% load) thru 2023-11-05
2x Engineering devs working on 13 tasks (241% load) thru 2023-11-05
7x Design devs working on 22 tasks (116% load) thru 2023-11-05
....=================...============================......................====|==========...............
....=================...................============================......====|==========...............
Bug Fixing & Tech Debt
- Actor Feature Team
1x Engineering dev working on 10 tasks (157% load) thru 2023-10-14
1x Animation dev working on 3 tasks (83% load) thru 2023-10-14
1x Engineering dev working on 10 tasks (157% load) thru 2023-10-14
1x Animation dev working on 3 tasks (83% load) thru 2023-10-14
........................~~~~====================..======.=====================|=====....................
....................................============................==============|=====....................
- AI Tech and Feature Team
11x Engineering devs working on 5 tasks (26% load) thru 2023-10-14
11x Engineering devs working on 5 tasks (26% load) thru 2023-10-14
............=========================.......~~~~~~~~~~~~.========.......======|=====....................
Building Interiors
- MTL Sandbox 1
13x Art devs working on 52 tasks (25% load) thru 2023-12-14
5x Design devs working on 30 tasks (28% load) thru 2023-12-14
13x Art devs working on 52 tasks (25% load) thru 2023-12-14
5x Design devs working on 30 tasks (28% load) thru 2023-12-14
........................======.===============~~~~~~==========================|=====================....
==============================.===============~~~~~~==========================|=====================....
Chapter 02
(Scheduled work ending soon!)
- SQ42 Character Art
3x Art devs working on 13 tasks (78% load) thru 2023-10-14
3x Art devs working on 13 tasks (78% load) thru 2023-10-14
................~~~~====........~~~~........====..======....==================|=====....................
Chapter 04
(Scheduled work ending soon!)
- AI Content Team
7x Design devs working on 32 tasks (25% load) thru 2023-10-14
7x Design devs working on 32 tasks (25% load) thru 2023-10-14
========================================~~~~~~~~~~======.===========~~~~======|=====....................
- SQ42 Art
6x Art devs working on 15 tasks (39% load) thru 2023-10-14
6x Art devs working on 15 tasks (39% load) thru 2023-10-14
............=============.........................======.=====================|=====....................
- SQ42 Character Art
4x Art devs working on 10 tasks (39% load) thru 2023-10-14
4x Art devs working on 10 tasks (39% load) thru 2023-10-14
============~~~~================================..======.=====================|=====....................
- SQ42 Level Design 1 - FPS
1x Design dev working on 5 tasks (287% load) thru 2023-10-14
1x Design dev working on 5 tasks (287% load) thru 2023-10-14
....................=====...................=====.......................======|=====....................
- SQ42 Level Design 3 - Social
2x Design devs working on 7 tasks (97% load) thru 2023-10-14
2x Design devs working on 7 tasks (97% load) thru 2023-10-14
....................................=============...............==============|=====....................
Chapter 05
(Scheduled work ending soon!)
- Character Tech Art
5x Tech Content devs working on 12 tasks (67% load) thru 2023-10-14
5x Tech Content devs working on 12 tasks (67% load) thru 2023-10-14
........============................============................==============|=====....................
Chapter 07
(Scheduled work ending soon!)
- SQ42 Level Design 2 - Flight
4x Design devs working on 15 tasks (49% load) thru 2023-10-14
4x Design devs working on 15 tasks (49% load) thru 2023-10-14
========================~~~~=====================.======.=====================|=====....................
Chapter 10
(Scheduled work ending soon!)
- SQ42 Level Design 3 - Social
1x Design dev working on 6 tasks (227% load) thru 2023-10-14
1x Design dev working on 6 tasks (227% load) thru 2023-10-14
........................................=========...................==========|=====....................
Chapter 11
(Scheduled work ending soon!)
- SQ42 Level Design 2 - Flight
3x Design devs working on 9 tasks (52% load) thru 2023-10-14
3x Design devs working on 9 tasks (52% load) thru 2023-10-14
....====~~~~=============...====~~~~=============........===~~~~==============|=====....................
Chapter 12
(Scheduled work ending soon!)
- AI Content Team
6x Design devs working on 11 tasks (69% load) thru 2023-10-14
6x Design devs working on 11 tasks (69% load) thru 2023-10-14
====~~~~=====...~~~~~...~~~~~...........====~~~~~~~~~~~~............==========|=====....................
- SQ42 Character Art
5x Art devs working on 15 tasks (47% load) thru 2023-10-14
5x Art devs working on 15 tasks (47% load) thru 2023-10-14
................~~~~====........====~~~~========..======.=====================|=====....................
- SQ42 Level Design 1 - FPS
5x Design devs working on 13 tasks (58% load) thru 2023-10-14
5x Design devs working on 13 tasks (58% load) thru 2023-10-14
........=================.......=================...........==================|=====....................
Chapter 13
(Scheduled work ending soon!)
- SQ42 Level Design 3 - Social
2x Design devs working on 7 tasks (97% load) thru 2023-10-14
2x Design devs working on 7 tasks (97% load) thru 2023-10-14
....................................=============...............==============|=====....................
Chapter 14
(Scheduled work ending soon!)
- SQ42 Level Design 1 - FPS
10x Design devs working on 10 tasks (16% load) thru 2023-10-14
10x Design devs working on 10 tasks (16% load) thru 2023-10-14
=================================================.======.=====================|=====....................
Chapter 16
(Scheduled work ending soon!)
- SQ42 Level Design 2 - Flight
3x Design devs working on 8 tasks (41% load) thru 2023-10-14
3x Design devs working on 8 tasks (41% load) thru 2023-10-14
........~~~~=============.......~~~~=============...........~~~~==============|=====....................
Chapter 17
(Scheduled work ending soon!)
- SQ42 Art
10x Art devs working on 10 tasks (16% load) thru 2023-10-14
10x Art devs working on 10 tasks (16% load) thru 2023-10-14
=========================.........................======.=====================|=====....................
- SQ42 Level Design 1 - FPS
2x Design devs working on 10 tasks (79% load) thru 2023-10-14
2x Design devs working on 10 tasks (79% load) thru 2023-10-14
=================================================.======.=====================|=====....................
- SQ42 Level Design 2 - Flight
4x Design devs working on 10 tasks (37% load) thru 2023-10-14
4x Design devs working on 10 tasks (37% load) thru 2023-10-14
====================~~~~====================~~~~~.======.===============~~~~~~|~~~~~....................
Chapter 18
(Scheduled work ending soon!)
- Character Tech Art
3x Tech Content devs working on 6 tasks (76% load) thru 2023-10-14
3x Tech Content devs working on 6 tasks (76% load) thru 2023-10-14
........................................========....................==========|=====....................
Chapter 19
(Scheduled work ending soon!)
- SQ42 Art
8x Art devs working on 19 tasks (43% load) thru 2023-10-14
8x Art devs working on 19 tasks (43% load) thru 2023-10-14
.........................................................=====================|=====....................
Chapter 20
(Scheduled work ending soon!)
- Character Tech Art
1x Tech Content dev working on 5 tasks (287% load) thru 2023-10-14
1x Tech Content dev working on 5 tasks (287% load) thru 2023-10-14
............................................====........................======|=====....................
- SQ42 Level Design 1 - FPS
6x Design devs working on 11 tasks (69% load) thru 2023-10-14
6x Design devs working on 11 tasks (69% load) thru 2023-10-14
................=========...............=========...................==========|=====....................
Chapter 21
(Scheduled work ending soon!)
- AI Content Team
7x Design devs working on 6 tasks (19% load) thru 2023-10-14
7x Design devs working on 6 tasks (19% load) thru 2023-10-14
........~~~~============~~~~~~~~~~~~~...~~~~~~~~~~~~~~~~.~~~~~~~~...~~~~======|=====....................
- SQ42 Art
3x Art devs working on 10 tasks (26% load) thru 2023-10-14
3x Art devs working on 10 tasks (26% load) thru 2023-10-14
............~~~~~~~~~~~~~.........................~~~~~~.~~~~~~~~~~~~~~~~~~~~~|~~~~~....................
- SQ42 Character Art
1x Art dev working on 8 tasks (178% load) thru 2023-10-14
1x Art dev working on 8 tasks (178% load) thru 2023-10-14
................................================............==================|=====....................
- SQ42 Level Design 2 - Flight
1x Design dev working on 5 tasks (287% load) thru 2023-10-14
1x Design dev working on 5 tasks (287% load) thru 2023-10-14
....................=====...................=====.......................======|=====....................
- SQ42 Level Design 3 - Social
3x Design devs working on 7 tasks (65% load) thru 2023-10-14
3x Design devs working on 7 tasks (65% load) thru 2023-10-14
....................................=============...............==============|=====....................
Chapter 22
(Scheduled work ending soon!)
- SQ42 Character Art
2x Art devs working on 8 tasks (89% load) thru 2023-10-14
2x Art devs working on 8 tasks (89% load) thru 2023-10-14
====............~~~~........................====..======....==================|=====....................
- SQ42 Level Design 1 - FPS
10x Design devs working on 25 tasks (39% load) thru 2023-10-14
10x Design devs working on 25 tasks (39% load) thru 2023-10-14
=================================================.======.=====================|=====....................
- SQ42 Level Design 2 - Flight
2x Design devs working on 8 tasks (56% load) thru 2023-10-14
2x Design devs working on 8 tasks (56% load) thru 2023-10-14
........~~~~========~~~~~.......~~~~========~~~~~...........~~~~========~~~~~~|~~~~~....................
Chapter 23
(Scheduled work ending soon!)
- SQ42 Art
3x Art devs working on 10 tasks (26% load) thru 2023-10-14
3x Art devs working on 10 tasks (26% load) thru 2023-10-14
............~~~~~~~~~~~~~.........................~~~~~~.~~~~~~~~~~~~~~~~~~~~~|~~~~~....................
- SQ42 Level Design 3 - Social
2x Design devs working on 8 tasks (89% load) thru 2023-10-14
2x Design devs working on 8 tasks (89% load) thru 2023-10-14
~~~~=====.......................=================...........==================|=====....................
Chapter 24
(Scheduled work ending soon!)
- SQ42 Level Design 1 - FPS
1x Design dev working on 6 tasks (227% load) thru 2023-10-14
1x Design dev working on 6 tasks (227% load) thru 2023-10-14
................=========...............=========...................==========|=====....................
- SQ42 Level Design 2 - Flight
2x Design devs working on 8 tasks (50% load) thru 2023-10-14
2x Design devs working on 8 tasks (50% load) thru 2023-10-14
........~~~~~~~~~~~~=====.......~~~~~~~~~~~~=====...........~~~~~~~~~~~~======|=====....................
Chapter 25
(Scheduled work ending soon!)
- Character Tech Art
1x Tech Content dev working on 5 tasks (287% load) thru 2023-10-14
1x Tech Content dev working on 5 tasks (287% load) thru 2023-10-14
............................................====........................======|=====....................
- SQ42 Art
4x Art devs working on 20 tasks (79% load) thru 2023-10-14
4x Art devs working on 20 tasks (79% load) thru 2023-10-14
..................................................======.=====================|=====....................
Chapter 26
(Scheduled work ending soon!)
- SQ42 Art
11x Art devs working on 25 tasks (36% load) thru 2023-10-14
11x Art devs working on 25 tasks (36% load) thru 2023-10-14
....................=====.........................======.=====================|=====....................
- SQ42 Level Design 1 - FPS
9x Design devs working on 10 tasks (17% load) thru 2023-10-14
9x Design devs working on 10 tasks (17% load) thru 2023-10-14
=================================================.======.=====================|=====....................
- SQ42 Level Design 3 - Social
1x Design dev working on 6 tasks (227% load) thru 2023-10-14
1x Design dev working on 6 tasks (227% load) thru 2023-10-14
....................=====...............=========...................==========|=====....................
- SQ42 UI Feature Team
2x Art devs working on 5 tasks (144% load) thru 2023-10-14
2x Art devs working on 5 tasks (144% load) thru 2023-10-14
....................................========~~~~~~~~~...................======|=====....................
Chapter 27
(Scheduled work ending soon!)
- SQ42 Art
1x Art dev working on 8 tasks (178% load) thru 2023-10-14
1x Art dev working on 8 tasks (178% load) thru 2023-10-14
............................................................==================|=====....................
Character Creator
(Scheduled work ending soon!)
- SQ42 Feature Team
1x Engineering dev working on 10 tasks (157% load) thru 2023-10-14
1x Engineering dev working on 10 tasks (157% load) thru 2023-10-14
................=====...=============.............======.=====================|=====....................
Character Work
(Scheduled work ending soon!)
- AI Tech and Feature Team
8x Engineering devs working on 42 tasks (30% load) thru 2023-10-14
3x Animation devs working on 27 tasks (51% load) thru 2023-10-14
1x Design dev working on 28 tasks (63% load) thru 2023-10-14
8x Engineering devs working on 42 tasks (30% load) thru 2023-10-14
3x Animation devs working on 27 tasks (51% load) thru 2023-10-14
1x Design dev working on 28 tasks (63% load) thru 2023-10-14
============================================~~~~~~~~~~~~.=====================|=====....................
============================================~~~~~~~~~~~~.=====================|=====....................
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~~~~~~~~~~~~|~~~~~....................
- Character Tech Art
8x Tech Content devs working on 25 tasks (49% load) thru 2023-10-14
8x Tech Content devs working on 25 tasks (49% load) thru 2023-10-14
........................========....============..======.=====================|=====....................
- SC Character Art
3x Art devs working on 20 tasks (105% load) thru 2023-10-14
3x Art devs working on 20 tasks (105% load) thru 2023-10-14
........................========================..======.=====================|=====....................
Cutting T2
(Scheduled work ending soon!)
- Weapon Feature Team
1x Engineering dev working on 22 tasks (130% load) thru 2023-10-14
1x Engineering dev working on 22 tasks (130% load) thru 2023-10-14
==============================.=========================.=====================|=====....................
Disarray Ammunition
(Scheduled work ending soon!)
- Weapon Feature Team
1x Engineering dev working on 12 tasks (74% load) thru 2023-10-14
1x Engineering dev working on 12 tasks (74% load) thru 2023-10-14
..........................................~~~~~~~~~~~~~~.~~~~~~~~~~~~~~~~~~~~~|~~~~~....................
Distortion Propagation
(Scheduled work ending soon!)
- Weapon Feature Team
1x Engineering dev working on 14 tasks (140% load) thru 2023-10-14
1x Engineering dev working on 14 tasks (140% load) thru 2023-10-14
..................................======================.=====================|=====....................
Freight Elevators
- EU Landing Zone 2
2x Art devs working on 14 tasks (66% load) thru 2023-12-14
2x Art devs working on 14 tasks (66% load) thru 2023-12-14
............=============.......................==============================|=====================....
Headhunters Faction Outfits
(Scheduled work ending soon!)
- SC Character Art
5x Art devs working on 25 tasks (79% load) thru 2023-10-14
5x Art devs working on 25 tasks (79% load) thru 2023-10-14
........................========================..======.=====================|=====....................
Incendiary Ammunition
(Scheduled work ending soon!)
- Weapon Feature Team
1x Engineering dev working on 12 tasks (74% load) thru 2023-10-14
1x Engineering dev working on 12 tasks (74% load) thru 2023-10-14
..........................................~~~~~~~~~~~~~~.~~~~~~~~~~~~~~~~~~~~~|~~~~~....................
Life Support T0
- EU PU Gameplay Feature Team
1x Engineering dev working on 9 tasks (242% load) thru 2023-10-22
1x Engineering dev working on 9 tasks (242% load) thru 2023-10-22
....................................................~~~~~~~~~~~~~.........~~~~|~~~~~~...................
Map and Radar System Rework
(Scheduled work ending soon!)
- SQ42 Feature Team
1x Engineering dev working on 10 tasks (157% load) thru 2023-10-14
1x Engineering dev working on 10 tasks (157% load) thru 2023-10-14
....=============================================.======.=====================|=====....................
- SQ42 UI Feature Team
4x Art devs working on 20 tasks (59% load) thru 2023-10-14
4x Art devs working on 20 tasks (59% load) thru 2023-10-14
=============================.....................~~~~~~.=====================|=====....................
....=====...........=====...=====........................=================....|.........................
Miscellaneous Support
- Actor Feature Team
4x Animation devs working on 15 tasks (59% load) thru 2023-10-14
2x Engineering devs working on 10 tasks (79% load) thru 2023-10-14
3x Design devs working on 20 tasks (105% load) thru 2023-10-14
4x Animation devs working on 15 tasks (59% load) thru 2023-10-14
2x Engineering devs working on 10 tasks (79% load) thru 2023-10-14
3x Design devs working on 20 tasks (105% load) thru 2023-10-14
====================~~~~~~~~====================..======.=====================|=====....................
====================~~~~~~~~====================..======.=====================|=====....................
====================~~~~~~~~====================..======.=====================|=====....................
- Actor Tech Team
6x Engineering devs working on 30 tasks (79% load) thru 2023-10-14
6x Engineering devs working on 30 tasks (79% load) thru 2023-10-14
====================~~~~~~~~====================..======.=====================|=====....................
- AI Content Team
2x Tech Content devs working on 33 tasks (37% load) thru 2023-10-14
4x Animation devs working on 37 tasks (52% load) thru 2023-10-14
2x Tech Content devs working on 33 tasks (37% load) thru 2023-10-14
4x Animation devs working on 37 tasks (52% load) thru 2023-10-14
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.~~~~~~~~~~~~~~~~~~~~~|~~~~~....................
============================================~~~~~~~~~~~~.=====================|=====....................
- Weapon Feature Team
5x Design devs working on 42 tasks (46% load) thru 2023-10-14
5x Design devs working on 42 tasks (46% load) thru 2023-10-14
==============================.=========================.=====================|=====....................
mobiGlas Rework
(Scheduled work ending soon!)
- SQ42 Feature Team
2x Engineering devs working on 8 tasks (89% load) thru 2023-10-14
2x Engineering devs working on 8 tasks (89% load) thru 2023-10-14
=====.......=========...=====.......=============.======....==================|=====....................
- SQ42 UI Feature Team
2x Design devs working on 11 tasks (54% load) thru 2023-10-14
1x Art dev working on 5 tasks (287% load) thru 2023-10-14
2x Design devs working on 11 tasks (54% load) thru 2023-10-14
1x Art dev working on 5 tasks (287% load) thru 2023-10-14
............................=====...........~~~~~~======.=====================|=====....................
............................=====...........~~~~~~~~~....====...........======|=====....................
New Missions - Cargo Hauling
- Mission Feature Team
2x Design devs working on 8 tasks (148% load) thru 2023-11-05
2x Design devs working on 8 tasks (148% load) thru 2023-11-05
..................................................==================......====|==========...............
New Missions - Data Heist
- Mission Feature Team
2x Design devs working on 8 tasks (148% load) thru 2023-11-05
2x Design devs working on 8 tasks (148% load) thru 2023-11-05
........................=================...========================......====|==========...............
New Missions - Restoration Contracts
- Mission Feature Team
2x Design devs working on 8 tasks (148% load) thru 2023-11-05
2x Design devs working on 8 tasks (148% load) thru 2023-11-05
..................................................==================......====|==========...............
New Missions - Steal/Recover Cargo
- Mission Feature Team
1x Engineering dev working on 8 tasks (296% load) thru 2023-11-05
1x Engineering dev working on 8 tasks (296% load) thru 2023-11-05
..........................................................................====|==========...............
..................................................==================..........|.........................
New Player Experience
- EU Landing Zone 2
1x Art dev working on 12 tasks (112% load) thru 2023-12-14
1x Art dev working on 12 tasks (112% load) thru 2023-12-14
=====...........................................==============================|=====================....
- Mission Feature Team
2x Design devs working on 5 tasks (93% load) thru 2023-11-05
2x Design devs working on 5 tasks (93% load) thru 2023-11-05
..................................................==================......====|==========...............
Origin G12
(Recently started!)
- Vehicle Content - EU
2x Art devs working on 14 tasks (158% load) thru 2023-12-14
1x Design dev working on 12 tasks (270% load) thru 2023-12-14
2x Art devs working on 14 tasks (158% load) thru 2023-12-14
1x Design dev working on 12 tasks (270% load) thru 2023-12-14
..............................................................................|=====================....
..............................................................................|=====================....
Origin X1
- Vehicle Content - US
4x Art devs working on 7 tasks (25% load) thru 2023-10-08
2x Tech Content devs will work on 3 tasks (93% load) starting 2023-10-09 thru 2023-11-05
4x Art devs working on 7 tasks (25% load) thru 2023-10-08
2x Tech Content devs will work on 3 tasks (93% load) starting 2023-10-09 thru 2023-11-05
........................................................~~~~========~~~~~~~~~~|~~.......................
..............................................................................|.=========...............
............................................................=================.|.........................
Outpost Homestead - Independent & Outlaw
- EU Sandbox 1
4x Design devs working on 18 tasks (109% load) thru 2023-11-05
12x Art devs working on 32 tasks (64% load) thru 2023-11-05
4x Design devs working on 18 tasks (109% load) thru 2023-11-05
12x Art devs working on 32 tasks (64% load) thru 2023-11-05
==================..==========.============...~~~~~~=============...==========|==========...========....
==================..==========.============...~~~~~~=============...==========|==========...========....
Plasma Ammunition
(Scheduled work ending soon!)
- Weapon Feature Team
1x Engineering dev working on 12 tasks (74% load) thru 2023-10-14
1x Engineering dev working on 12 tasks (74% load) thru 2023-10-14
..........................................~~~~~~~~~~~~~~.~~~~~~~~~~~~~~~~~~~~~|~~~~~....................
Player Interaction Experience T2 - Visor HUD & Helmet
(Scheduled work ending soon!)
- SQ42 UI Feature Team
3x Design devs working on 21 tasks (55% load) thru 2023-10-14
3x Design devs working on 21 tasks (55% load) thru 2023-10-14
........=====...........====================~~~~~~~~~~~~.=====================|=====....................
........................=========.................~~~~~~......................|.........................
Pyro Space Stations
- EU Landing Zone 1
3x Design devs working on 17 tasks (172% load) thru 2023-11-05
14x Art devs working on 59 tasks (128% load) thru 2023-11-05
3x Design devs working on 17 tasks (172% load) thru 2023-11-05
14x Art devs working on 59 tasks (128% load) thru 2023-11-05
=============...........=================.......=================.......======|==========...............
=============...........=================.......=================.......======|==========...............
Reputation - Hostility
- Mission Feature Team
1x Engineering dev working on 8 tasks (296% load) thru 2023-11-05
1x Engineering dev working on 8 tasks (296% load) thru 2023-11-05
..................................................==================......====|==========...............
Resource Management
- EU PU Gameplay Feature Team
5x Engineering devs working on 15 tasks (40% load) thru 2023-11-05
3x Design devs working on 17 tasks (51% load) thru 2023-12-14
5x Engineering devs working on 15 tasks (40% load) thru 2023-11-05
3x Design devs working on 17 tasks (51% load) thru 2023-12-14
=====...........=====================...=========...==========================|=====~~~~~...========....
=========...............~~~~~~~~~.......====~~~~~...====~~~~~~~~==========~~~~|~~~~~~~~~============....
RSI Apollo
(Recently started!)
- Vehicle Content - US
1x Art dev working on 1 task (23% load) thru 2023-12-14
1x Design dev working on 1 task (23% load) thru 2023-12-14
1x Art dev working on 1 task (23% load) thru 2023-12-14
1x Design dev working on 1 task (23% load) thru 2023-12-14
..............................................................................|=====================....
..............................................................................|=====================....
RSI Polaris
- Vehicle Content - EU
8x Art devs working on 16 tasks (45% load) thru 2023-12-14
1x Design dev working on 12 tasks (270% load) thru 2023-12-14
8x Art devs working on 16 tasks (45% load) thru 2023-12-14
1x Design dev working on 12 tasks (270% load) thru 2023-12-14
..........................======================....======================....|=====================....
..............................................................................|=====================....
Salvage - Vehicle Munching
- EU PU Gameplay Feature Team
1x Engineering dev working on 11 tasks (340% load) thru 2023-11-05
1x Design dev working on 9 tasks (242% load) thru 2023-10-22
1x Engineering dev working on 11 tasks (340% load) thru 2023-11-05
1x Design dev working on 9 tasks (242% load) thru 2023-10-22
........................=========...........=====...=================...======|==========...========....
........................~~~~~...............~~~~~...~~~~~~~~~~~~~.........~~~~|~~~~~~...................
Security Network V1
- Mission Feature Team
2x Engineering devs working on 6 tasks (122% load) thru 2023-11-05
2x Engineering devs working on 6 tasks (122% load) thru 2023-11-05
............................................................................==|==========...............
Sliding
(Scheduled work ending soon!)
- Actor Feature Team
1x Engineering dev working on 10 tasks (157% load) thru 2023-10-14
2x Animation devs working on 7 tasks (97% load) thru 2023-10-14
1x Engineering dev working on 10 tasks (157% load) thru 2023-10-14
2x Animation devs working on 7 tasks (97% load) thru 2023-10-14
........................~~~~====================..======.=====================|=====....................
........................~~~~........============..======........==============|=====....................
SQ42 - Vehicle Support
- AI Tech and Feature Team
3x Engineering devs working on 16 tasks (202% load) thru 2023-10-14
3x Engineering devs working on 16 tasks (202% load) thru 2023-10-14
........................................====~~~~~~~~~...............==========|=====....................
- SQ42 Art
4x Art devs working on 20 tasks (79% load) thru 2023-10-14
4x Art devs working on 20 tasks (79% load) thru 2023-10-14
=========================.........................======.=====================|=====....................
- SQ42 UI Feature Team
2x Art devs working on 9 tasks (82% load) thru 2023-10-14
2x Art devs working on 9 tasks (82% load) thru 2023-10-14
............................================~~~~~~~~~....=====================|=====....................
- Vehicle Content - EU
5x Art devs working on 12 tasks (54% load) thru 2023-12-14
4x Design devs working on 16 tasks (90% load) thru 2023-12-14
5x Art devs working on 12 tasks (54% load) thru 2023-12-14
4x Design devs working on 16 tasks (90% load) thru 2023-12-14
..........................======================....======================....|=====================....
======================....======================....======================....|=====================....
Subsumption Editor Integration
(Scheduled work ending soon!)
- AI Tech and Feature Team
1x Engineering dev working on 16 tasks (124% load) thru 2023-10-14
1x Engineering dev working on 16 tasks (124% load) thru 2023-10-14
=====================...====================~~~~~~~~~~~~.=====================|=====....................
Swimming T0
(Scheduled work ending soon!)
- Actor Feature Team
1x Engineering dev working on 10 tasks (157% load) thru 2023-10-14
1x Engineering dev working on 10 tasks (157% load) thru 2023-10-14
........................========================..======.=====================|=====....................
............................========.....................=================....|.........................
Unannounced Vehicle
(Scheduled work ending soon!)
- Vehicle Content - MTL
2x Art devs working on 25 tasks (158% load) thru 2023-10-05
2x Art devs working on 25 tasks (158% load) thru 2023-10-05
..........................======~~~~~~~~~~~~~~~~....~~~~~~~~~~~~~~~~~~~~~~~~~~|~........................
Unannounced Vehicle
- Vehicle Content - EU
4x Art devs working on 6 tasks (139% load) thru 2023-10-19
4x Art devs working on 6 tasks (139% load) thru 2023-10-19
................======....======================....======================....|=====....................
................======....======================..............................|.........................
Unannounced Vehicle
(Scheduled work ending soon!)
- Vehicle Content - MTL
2x Art devs working on 29 tasks (254% load) thru 2023-10-05
2x Art devs working on 29 tasks (254% load) thru 2023-10-05
..................................==============....==========================|=........................
Underground Facilities
- MTL Sandbox 1
7x Art devs working on 51 tasks (35% load) thru 2023-12-14
3x Design devs working on 30 tasks (47% load) thru 2023-12-14
7x Art devs working on 51 tasks (35% load) thru 2023-12-14
3x Design devs working on 30 tasks (47% load) thru 2023-12-14
==============================.===============~~~~~~==========================|=====================....
==============================.===============~~~~~~==========================|=====================....
Weapon Misfire & Wear
(Scheduled work ending soon!)
- Weapon Feature Team
3x Engineering devs working on 22 tasks (43% load) thru 2023-10-14
3x Engineering devs working on 22 tasks (43% load) thru 2023-10-14
==============================.=========================.=====================|=====....................
The following deliverables are scheduled to begin (or continue) work within two weeks
Aopoa San'tok.yāi
- Vehicle Content - US
4x Art devs will work on 7 tasks (44% load) starting 2023-10-09 thru 2023-12-14
4x Art devs will work on 7 tasks (44% load) starting 2023-10-09 thru 2023-12-14
======================....========================......============~~~~~.....|.====================....