ShinyTracker

RSI "Progress Tracker" Delta Reports

by ShinyHobo RSS

Scheduled Deliverables

as of 2025-02-26

There are currently 11 scheduled deliverables being worked on by 3 teams

0 deliverables are scheduled to begin work by 0 team(s) within two weeks

0 deliverables are scheduled to continue work by 0 team(s) within two weeks


This report lists the actively assigned deliverables and the associated teams assigned to each time period. Deliverable time allocations are often staggered over their total lifespan and have multiple devs in the same department working in parallel, but their allocations are obviously not going to be equal. For a better look at this, clicking the team name (or one of the completion dates listed below it) will display a rendering of the current waterfall chart iteration. This chart provides an overview of the schedule breakdown of each team in week long segments.

The timeslots you see on the RSI website are actually fragmented into many smaller sections, usually two week sprints. I do my best to combine relevant timespans by looking for overlaps (4 days currently). If a team says they end earlier than you expect, it means that there is some sizeable period of time between then and the next time they start working on the deliverable again.

The load calculation is an approximation based on the sum of the part-time and full-time tasks (averaged at 80 hours to complete a piece) divided by the team capacity (with a focus factor of 60%) over the given time period. Without exact hourly estimates for each task, a more accurate assessment doesn’t seem likely, so interpret the load as a given dev group’s general utilization on a deliverable.


extra analysis (click me)


There are 11 assignments scheduled to work on 11 observable deliverables. Of those deliverables, 0% are for SQ42 exclusively. 9% of deliverables are shared between both projects.

1 deliverable(s) are not currently scheduled to continue work after this sprint: Below are the time breakdowns for each team:

Base Building

  • SC & SQ42 - Core Gameplay Pillar
    1 task (3% load) thru 2025-10-30

..~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~................

Charge/Drain

  • SC & SQ42 - Core Gameplay Pillar
    1 task (6% load) thru 2025-05-29

..~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~~~~~~~~~~~............................................................

Crafting

  • SC & SQ42 - Core Gameplay Pillar
    1 task (4% load) thru 2025-08-28

..~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~..................................

Engineering

  • SC & SQ42 - Core Gameplay Pillar
    1 task (6% load) thru 2025-05-29

..~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~~~~~~~~~~~............................................................

FPS Radar / Scanning

  • SC & SQ42 - Core Gameplay Pillar
    1 task (6% load) thru 2025-05-29

..~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~~~~~~~~~~~............................................................

Life Support

  • SC & SQ42 - Core Gameplay Pillar
    1 task (6% load) thru 2025-05-29

..~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~~~~~~~~~~~............................................................

Radiation

  • SC & SQ42 - Core Gameplay Pillar
    1 task (3% load) thru 2025-05-30

~~~~~~~~~~~~~~~~|~~~~~~~~~~~~~~~~~~~~~~~~~~~............................................................

REDACTED Mission Giver

  • SC & SQ42 - Character Art and Tech
    1 task (10% load) thru 2025-03-26

..~~~~~~~~~~~~~~|~~~~~~~~~..............................................................................

REDACTED Mission Giver Location

  • SC - Locations
    1 task (10% load) thru 2025-03-26

..~~~~~~~~~~~~~~|~~~~~~~~~..............................................................................

REDACTED Sandbox Activity

  • SC & SQ42 - Core Gameplay Pillar
    1 task (8% load) thru 2025-03-26

~~~~~~~~~~~~~~~~|~~~~~~~~~..............................................................................

Supply or Die

(Scheduled work ending soon!)

  • SC & SQ42 - Core Gameplay Pillar
    1 task (9% load) thru 2025-02-27

~~~~~~~~~~~~~~~~|~......................................................................................