Progress Tracker Delta

578 deliverables listed | 2025-09-23 => 2025-10-10

There were 8 modifications, 0 removals, and 0 additions in this update. Please note that not all removals are intentional; there is currently a bug with how time is entered on the Progress Tracker that can cause deliverables to disappear.


extra analysis (click me)


There are 5 assignments scheduled to work on 5 observable deliverables. Of those deliverables, 0% are for SQ42 exclusively. 0% of deliverables are shared between both projects.

On average, the schedule has expanded by 27 days. 1 deliverables were not extended:

The top currently scheduled tasks (in estimated man-days) are:

  1. 88 - Transport Refactor (full-time)
  2. 62 - Command Module (full-time)
  3. 39 - FPS Radar / Scanning (100% part-time)
  4. 38 - Inventory Rework (full-time)
  5. 29 - Engineering (100% part-time)

The top currently scheduled tasks (in assigned devs) are:

  1. 1 - Command Module (full-time)
  2. 1 - Inventory Rework (full-time)
  3. 1 - Transport Refactor (full-time)
  4. 1 - Engineering (100% part-time)
  5. 1 - FPS Radar / Scanning (100% part-time)

[8] deliverable(s) updated:

Command Module

2025-08-10 => 2026-02-12

  • End date has been extended from 2025-12-11 to 2026-02-12
  • SC & SQ42 - Core Gameplay Pillar added 62 days of work
    xDeveloper with 1 tasks (14% => 9% load)

Crafting

2023-12-31 => 2025-12-11

  • SC & SQ42 - Core Gameplay Pillar freed up 62 days of work

Engineering

2023-12-31 => 2025-10-23

  • End date has been extended from 2025-09-29 to 2025-10-23
  • SC & SQ42 - Core Gameplay Pillar added 11 days of work
    xDeveloper with 1 tasks (7% => 6% load)

FPS Radar / Scanning

2021-01-03 => 2025-12-11

  • End date has been extended from 2025-09-29 to 2025-12-11
  • SC & SQ42 - Core Gameplay Pillar added 11 days of work
    xDeveloper with 1 tasks (7% => 4% load)

Inventory Rework

2025-06-30 => 2025-10-23

  • End date has been extended from 2025-09-29 to 2025-10-23
  • SC & SQ42 - Core Gameplay Pillar added 11 days of work
    xDeveloper with 1 tasks (18% => 14% load)

Item Expiry

2025-05-11 => 2025-08-14

  • SC & SQ42 - Core Gameplay Pillar freed up 57 days of work

REDACTED Sandbox Activity

2024-12-05 => 2025-03-26

  • Start date has been corrected from 2025-01-31 to 2024-12-05
  • End date has moved earlier (time allocation removal(s) or priority up likely)
    from 2025-06-05 to 2025-03-26

Transport Refactor

2025-02-02 => 2025-10-23

  • End date has been extended from 2025-10-16 to 2025-10-23
  • SC & SQ42 - Core Gameplay Pillar added 6 days of work
    xDeveloper with 1 tasks (7% => 6% load)

[570] deliverable(s) unchanged