ShinyTracker

RSI "Progress Tracker" Delta Reports

by ShinyHobo RSS

Progress Tracker Delta

578 deliverables listed | 2025-08-13 => 2025-08-27

There were 1 modifications, 0 removals, and 0 additions in this update. Please note that not all removals are intentional; there is currently a bug with how time is entered on the Progress Tracker that can cause deliverables to disappear.


extra analysis (click me)


There are 7 assignments scheduled to work on 7 observable deliverables. Of those deliverables, 0% are for SQ42 exclusively. 0% of deliverables are shared between both projects.

On average, the schedule has not moved. 1 deliverables were not extended:

The top currently scheduled tasks (in estimated man-days) are:

  1. 85 - Transport Refactor (full-time)
  2. 68 - Crafting (100% part-time)
  3. 41 - Command Module (full-time)
  4. 39 - REDACTED Creature (full-time)
  5. 30 - Inventory Rework (full-time)
  6. 24 - Engineering (100% part-time)
  7. 24 - FPS Radar / Scanning (100% part-time)

The top currently scheduled tasks (in assigned devs) are:

  1. 1 - Command Module (full-time)
  2. 1 - Inventory Rework (full-time)
  3. 1 - REDACTED Creature (full-time)
  4. 1 - Transport Refactor (full-time)
  5. 1 - Crafting (100% part-time)
  6. 1 - Engineering (100% part-time)
  7. 1 - FPS Radar / Scanning (100% part-time)

[1] deliverable(s) updated:

REDACTED Sandbox Activity

2024-12-05 => 2025-03-26

  • Start date has been corrected from 2025-01-31 to 2024-12-05
  • End date has moved earlier (time allocation removal(s) or priority up likely)
    from 2025-06-05 to 2025-03-26

[577] deliverable(s) unchanged